Partner NameBuilt Services
StateNSW
Date of Visit10/07/2024
Technician's NameJamieson Cawsey
Which Company are you working for?Sturdie Trade Services
Sturdie Job Number50F0015/0345
EmailEmail hidden; Javascript is required.
The Good Guys Site in NSWmarsden_park

Location NameMarsden Park
HTML Block
Test PeriodBiennial Test (once every two years)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

RCD Details (Biennial)
Distribution Board No. Circuit No. Push Button (YorN) 0 Degrees 180 Degrees Pass / Fail (PorF) Fault? Repaired on Site (YorN)
DB1 1 Y 48 18 P
DB1 2 Y 28 18 P
DB1 3 Y 28 18 P
DB1 4 Y 28 18 P
DB1 4 Y 41 32 P
DB1 5 Y 32 18 P
DB1 6 Y 32 21 P
DB1 7 Y 28 18 P
DB1 8 Y 27 37 P
DB1 9 Y 35 41 P
DB1 10 Y 41 21 P
DB1 11 Y 36 18 P
DB1 12 Y 35 18 P
DB1 13 Y 28 18 P
DB1 15 Y 41 20 P
DB1 17 Y 33 21 P
DB1 19 Y 34 18 P
DB1 21 Y 28 18 P
DB1 22 Y 31 18 P
DB1 23 Y 41 18 P
DB1 24 Y 32 18 P
DB1 25 Y 40 21 P
DB1 27 Y 37 18 P
DB1 29 Y 41 18 P
DB1 31 Y 28 18 P
DB1 33 Y 29 18 P
DB1 35 Y 38 18 P
DB1 37 Y 49 60 P
DB1 51 Y 50 140 P
DB1 53 Y 44 34 P
DB1 55 Y 50 41 P
DB2 1 Y 44 17 P
DB2 2 Y 26 23 P
DB2 3 Y 28 22 P
DB2 4 Y 43 17 P
DB2 5 Y 28 18 P
DB2 6 Y 32 18 P
DB2 7 Y 42 25 P
DB2 8 Y 28 18 P
DB2 9 Y 29 32 P
DB2 10 Y 28 19 P
DB2 11 Y 34 28 P
DB2 13 Y 45 56 P
DB2 14 Y 46 29 P
DB2 15 Y 32 29 P
DB2 16 Y 36 30 P
DB2 17 Y 38 36 P
DB2 18 Y 45 39 P
DB2 19 Y 25 18 P
DB2 20 Y 28 17 P
DB2 21 Y 43 33 P
DB2 23 Y 45 29 P
DB2 25 Y 35 18 P
DB2 27 Y 38 32 P
DB2 28 Y 28 20 P
DB2 29 Y 32 18 P
DB2 30 Y 32 30 P
DB2 31 Y 31 33 P
DB2 34 Y 36 21 P
DB2 35 Y 45 38 P
THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
  • Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB-T12 EF11 4ft Twin Fluoro Y Y Y P
EF12 4ft Twin Fluoro Y Y Y P
EF13 4ft Twin Fluoro Y Y Y P
EF14 4ft Twin Fluoro Y Y Y P
EF15 4ft Twin Fluoro Y Y Y P
EF16 4ft Twin Fluoro Y Y Y P
EF17 4ft Twin Fluoro Y Y Y P
EF18 4ft Twin Fluoro Y Y Y P
S19 R Y Y Y P
S20 R Y Y Y P
S21 R Y Y Y P
S22 R Y Y Y P
S23 R Y Y Y P
S24 R Y Y Y P
S25 R Y Y Y P
S26 R Y Y Y P
HTML Block
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB-T12 EX1 Y Y Y P
EX2 N N N F Failed 90min test Y N
EX3 Y Y Y P
EX4 Y Y Y P
EX5 Y Y Y P
EX6 Y Y Y P
EX7 Y Y Y P
EX8 N N N F Failed 90min test Y N
EX9 Y Y Y P
EX10 Y Y Y P
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Check with Store Manager to ensure there are no other issues
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auYes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten) Existing (YorN)
Low Bay YML 150W Y
Fluoro High Bay 200W Y
2 x 3ft LED Strips & LED Panel LPF-40D-12 Y
4ft Fluoro T5 28W Lamps Y
Green Tomorrow Downlight 12W GT-DLSW12 Y
Are there any Warranty items needing to be repaired?No
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
Exit light 2 Staff entry front door 1 Failed 90min test Y N N Replaced exit at front door while onsite
Exit light 8 Kitchen Area 1 Failed 90min test Y N N Replace Exit light
Highbays Retail floor 6 Not turning on Y N N Re-Terminate cable in contactor as one of the coils was burnt
Site Status SelectorStore now fully compliant
Next Test Due in 6 months10/01/2025