Partner NameBuilt Services
StateNSW
Date of Visit16/07/2024
Technician's NameJamieson Cawsey
Which Company are you working for?Sturdie Trade Services
Sturdie Job Number50F0015/0348
EmailEmail hidden; Javascript is required.
The Good Guys Site in NSWtempe

Location NameTempe
HTML Block
Test PeriodBiennial Test (once every two years)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

RCD Details (Biennial)
Distribution Board No. Circuit No. Push Button (YorN) 0 Degrees 180 Degrees Pass / Fail (PorF) Fault? Repaired on Site (YorN)
DB 1 1 Y 9 19 P
DB1 2 Y 90 20 P
DB1 3 Y 29 20 P
DB1 4 Y 29 20 P
DB1 5 Y 8 18 P
DB1 6 Y 9 22 P
DB1 7 Y 8 18 P
DB1 8 Y 8 18 P
DB1 9 Y 8 18 P
DB1 9 Y 8 19 P
DB1 10 Y 8 14 P
DB1 11 Y 8 18 P
DB1 12 Y 10 16 P
DB1 13 Y 30 20 P
DB1 14 Y 14 24 P
DB1 16 Y 28 18 P
DB1 17 Y 10 15 P
DB1 18 Y 24 154 P
DB1 19 Y 30 21 P
DB1 20 Y 10 20 P
DB1 21 Y 47 16 P
DB1 22 Y 28 17 P
DB1 23 Y 32 22 P
DB1 26 Y 48 18 P
DB2 3 Y 18 28 P
DB2 4 Y 18 28 P
DB2 5 Y 13 24 P
DB2 6 Y 34 24 P
DB2 7 Y 45 18 P
DB2 8 Y 13 32 P
DB2 9 Y 18 28 P
DB2 10 Y 19 29 P
DB2 11 Y 14 23 P
DB2 12 Y 18 27 P
DB2 13 Y 35 25 P
DB2 14 Y 20 30 P
DB2 15 Y 58 27 P
DB2 16 Y 17 30 P
DB2 17 Y 19 30 P
DB2 18 Y 14 24 P
DB2 19 Y 13 23 P
DB2 20 Y 147 24 P
DB2 21 Y 49 21 P
DB2 22 Y 44 17 P
DB2 23 Y 48 21 P
DB2 24 Y 18 28 P
DB2 25 Y 17 27 P
DB2 26 Y 73 31 P
DB2 27 Y 18 28 P
DB2 28 Y 18 27 P
DB2 29 Y 17 27 P
DB2 30 Y 19 29 P
DB2 31 Y 97 26 P
DB2 32 Y 36 29 P
DB2 33 Y 16 27 P
DB2 34 Y 15 25 P
THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
HTML Block
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Check with Store Manager to ensure there are no other issues
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auYes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten) Existing (YorN)
LED High Bays 150W Y
LED Downlight 210mm 31W S9075DP WH Y
Ledline 4ft 40W SLD4000CW Y
LED Strip Display Signs DC24V Y
LED Downlight 11W S9071CP WH Y
Are there any Warranty items needing to be repaired?No
Site Status SelectorStore now fully compliant
Next Test Due in 6 months16/01/2025