| Partner Name | Built Services |
|---|
| State | NSW |
|---|
| Date of Visit | 16/07/2024 |
|---|
| Technician's Name | Jamieson Cawsey |
|---|
| Which Company are you working for? | Sturdie Trade Services |
|---|
| Sturdie Job Number | 50F0015/0348 |
|---|
| Email | Email hidden; Javascript is required. |
|---|
| The Good Guys Site in NSW | tempe |
|---|
|
|
|---|
| Location Name | Tempe |
|---|
| |
|---|
| HTML Block |
|
|---|
| Test Period | Biennial Test (once every two years) |
|---|
| Push Button Test | - Carry out push button test for correct operation
|
|---|
| Carry out push button test for correct operation | |
|---|
| HTML Block |
|
|---|
| Carry out test with RCD Tester | Carry out push button test and record the results below. |
|---|
| RCD Details (Biennial) | | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
0 Degrees |
180 Degrees |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
| DB 1 |
1 |
Y |
9 |
19 |
P |
|
|
| DB1 |
2 |
Y |
90 |
20 |
P |
|
|
| DB1 |
3 |
Y |
29 |
20 |
P |
|
|
| DB1 |
4 |
Y |
29 |
20 |
P |
|
|
| DB1 |
5 |
Y |
8 |
18 |
P |
|
|
| DB1 |
6 |
Y |
9 |
22 |
P |
|
|
| DB1 |
7 |
Y |
8 |
18 |
P |
|
|
| DB1 |
8 |
Y |
8 |
18 |
P |
|
|
| DB1 |
9 |
Y |
8 |
18 |
P |
|
|
| DB1 |
9 |
Y |
8 |
19 |
P |
|
|
| DB1 |
10 |
Y |
8 |
14 |
P |
|
|
| DB1 |
11 |
Y |
8 |
18 |
P |
|
|
| DB1 |
12 |
Y |
10 |
16 |
P |
|
|
| DB1 |
13 |
Y |
30 |
20 |
P |
|
|
| DB1 |
14 |
Y |
14 |
24 |
P |
|
|
| DB1 |
16 |
Y |
28 |
18 |
P |
|
|
| DB1 |
17 |
Y |
10 |
15 |
P |
|
|
| DB1 |
18 |
Y |
24 |
154 |
P |
|
|
| DB1 |
19 |
Y |
30 |
21 |
P |
|
|
| DB1 |
20 |
Y |
10 |
20 |
P |
|
|
| DB1 |
21 |
Y |
47 |
16 |
P |
|
|
| DB1 |
22 |
Y |
28 |
17 |
P |
|
|
| DB1 |
23 |
Y |
32 |
22 |
P |
|
|
| DB1 |
26 |
Y |
48 |
18 |
P |
|
|
| DB2 |
3 |
Y |
18 |
28 |
P |
|
|
| DB2 |
4 |
Y |
18 |
28 |
P |
|
|
| DB2 |
5 |
Y |
13 |
24 |
P |
|
|
| DB2 |
6 |
Y |
34 |
24 |
P |
|
|
| DB2 |
7 |
Y |
45 |
18 |
P |
|
|
| DB2 |
8 |
Y |
13 |
32 |
P |
|
|
| DB2 |
9 |
Y |
18 |
28 |
P |
|
|
| DB2 |
10 |
Y |
19 |
29 |
P |
|
|
| DB2 |
11 |
Y |
14 |
23 |
P |
|
|
| DB2 |
12 |
Y |
18 |
27 |
P |
|
|
| DB2 |
13 |
Y |
35 |
25 |
P |
|
|
| DB2 |
14 |
Y |
20 |
30 |
P |
|
|
| DB2 |
15 |
Y |
58 |
27 |
P |
|
|
| DB2 |
16 |
Y |
17 |
30 |
P |
|
|
| DB2 |
17 |
Y |
19 |
30 |
P |
|
|
| DB2 |
18 |
Y |
14 |
24 |
P |
|
|
| DB2 |
19 |
Y |
13 |
23 |
P |
|
|
| DB2 |
20 |
Y |
147 |
24 |
P |
|
|
| DB2 |
21 |
Y |
49 |
21 |
P |
|
|
| DB2 |
22 |
Y |
44 |
17 |
P |
|
|
| DB2 |
23 |
Y |
48 |
21 |
P |
|
|
| DB2 |
24 |
Y |
18 |
28 |
P |
|
|
| DB2 |
25 |
Y |
17 |
27 |
P |
|
|
| DB2 |
26 |
Y |
73 |
31 |
P |
|
|
| DB2 |
27 |
Y |
18 |
28 |
P |
|
|
| DB2 |
28 |
Y |
18 |
27 |
P |
|
|
| DB2 |
29 |
Y |
17 |
27 |
P |
|
|
| DB2 |
30 |
Y |
19 |
29 |
P |
|
|
| DB2 |
31 |
Y |
97 |
26 |
P |
|
|
| DB2 |
32 |
Y |
36 |
29 |
P |
|
|
| DB2 |
33 |
Y |
16 |
27 |
P |
|
|
| DB2 |
34 |
Y |
15 |
25 |
P |
|
|
|
|---|
| THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
|---|
| SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
|---|
| Timers | - Check timers for correct operation and timing
|
|---|
| Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
|---|
| HTML Block |
|
|---|
| HTML Block |
|
|---|
| SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
|---|
| General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
|---|
| HTML Block |
|
|---|
| General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
|---|
| HTML Block |
|
|---|
| Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
|---|
| Lighting Report | | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
| LED High Bays 150W |
Y |
| LED Downlight 210mm 31W S9075DP WH |
Y |
| Ledline 4ft 40W SLD4000CW |
Y |
| LED Strip Display Signs DC24V |
Y |
| LED Downlight 11W S9071CP WH |
Y |
|
|---|
| Are there any Warranty items needing to be repaired? | No |
|---|
| Site Status Selector | Store now fully compliant |
|---|
| Next Test Due in 6 months | 16/01/2025 |
|---|
| |
|---|
| |