| Partner Name | Built Services |
|---|
| State | ACT |
|---|
| Date of Visit | 16/07/2024 |
|---|
| Technician's Name | Ian Summerfield |
|---|
| Which Company are you working for? | Sturdie Trade Services |
|---|
| Sturdie Job Number | 50F0015/0339 |
|---|
| Email | Email hidden; Javascript is required. |
|---|
| The Good Guys Site in ACT | fyshwick |
|---|
|
|
|---|
| Location Name | Fyshwick |
|---|
| |
|---|
| HTML Block |
|
|---|
| Test Period | Biennial Test (once every two years) |
|---|
| Push Button Test | - Carry out push button test for correct operation
|
|---|
| Carry out push button test for correct operation | |
|---|
| HTML Block |
|
|---|
| Carry out test with RCD Tester | Carry out push button test and record the results below. |
|---|
| RCD Details (Biennial) | | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
0 Degrees |
180 Degrees |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
| Light & Power |
01 |
Y |
32.0 |
31.2 |
P |
|
|
|
02 |
Y |
32.0 |
32.0 |
P |
|
|
|
03 |
Y |
32.0 |
31.6 |
P |
|
|
|
04 |
Y |
31.2 |
24.4 |
P |
|
|
|
05 |
Y |
31.6 |
31.2 |
P |
|
|
|
06 |
Y |
29.6 |
32.8 |
P |
|
|
|
07 |
Y |
32.0 |
32.0 |
P |
|
|
|
08 |
Y |
30.8 |
32.0 |
P |
|
|
|
09 |
Y |
31.2 |
31.2 |
P |
|
|
|
10 |
Y |
29.6 |
30.4 |
P |
|
|
|
11 |
Y |
31.6 |
31.6 |
P |
|
|
|
12 |
Y |
30.0 |
30.4 |
P |
|
|
|
13 |
Y |
32.0 |
32.0 |
P |
|
|
|
14 |
Y |
36.4 |
32.0 |
P |
|
|
|
15 |
Y |
31.2 |
31.6 |
P |
|
|
|
16 |
Y |
30.4 |
29.6 |
P |
|
|
|
17 |
Y |
30.8 |
31.6 |
P |
|
|
|
18 |
Y |
31.2 |
31.2 |
P |
|
|
|
19 |
Y |
30.6 |
30.4 |
P |
|
|
|
20 |
Y |
29.2 |
29.2 |
P |
|
|
|
21 |
Y |
32.0 |
30.8 |
P |
|
|
|
22 |
Y |
31.6 |
34.8 |
P |
|
|
|
23 |
Y |
30.8 |
30.8 |
P |
|
|
|
24 |
Y |
32.8 |
31.2 |
P |
|
|
|
25 |
Y |
30.0 |
30.0 |
P |
|
|
|
26 |
Y |
30.8 |
30.4 |
P |
|
|
|
27 |
Y |
30.8 |
30.8 |
P |
|
|
|
28 |
Y |
31.6 |
31.4 |
P |
|
|
|
29 |
Y |
32.8 |
30.4 |
P |
|
|
|
30 |
Y |
31.0 |
34.4 |
P |
|
|
|
31 |
Y |
31.2 |
30.4 |
P |
|
|
|
32 |
Y |
31.2 |
32.0 |
P |
|
|
|
33 |
Y |
31.7 |
31.2 |
P |
|
|
|
34 |
Y |
31.6 |
30.8 |
P |
|
|
|
35 |
Y |
32.8 |
31.2 |
P |
|
|
|
36 |
Y |
40.4 |
31.2 |
P |
|
|
|
37 |
Y |
31.6 |
30.0 |
P |
|
|
|
38 |
Y |
30.8 |
30.4 |
P |
|
|
|
39 |
Y |
34.1 |
32.0 |
P |
|
|
|
40 |
Y |
31.6 |
30.4 |
P |
|
|
|
41 |
Y |
30.0 |
30.1 |
P |
|
|
|
42 |
Y |
28.8 |
22.4 |
P |
|
|
|
43 |
Y |
34.8 |
34.8 |
P |
|
|
|
44 |
Y |
20.8 |
23.2 |
P |
|
|
|
45 |
Y |
34.0 |
32.4 |
P |
|
|
|
46 |
Y |
28.8 |
29.2 |
P |
|
|
|
47 |
Y |
30.0 |
30.1 |
P |
|
|
|
48 |
Y |
31.2 |
31.2 |
P |
|
|
|
50 |
Y |
30.4 |
31.6 |
P |
|
|
|
51 |
Y |
28.9 |
29.6 |
P |
|
|
|
52 |
Y |
31.2 |
31.6 |
P |
|
|
|
53 |
Y |
36.8 |
30.0 |
P |
|
|
|
54 |
Y |
32.0 |
31..2 |
P |
|
|
|
55 |
Y |
30.4 |
30.4 |
P |
|
|
|
56 |
Y |
31.6 |
31.6 |
P |
|
|
|
57 |
Y |
30.4 |
30.4 |
P |
|
|
|
58 |
Y |
30.8 |
32.4 |
P |
|
|
|
59 |
Y |
30.4 |
30.8 |
P |
|
|
|
60 |
Y |
40.0 |
31.6 |
P |
|
|
|
61 |
Y |
30.8 |
30.8 |
P |
|
|
|
62 |
Y |
30.8 |
30.8 |
P |
|
|
|
63 |
Y |
30.0 |
30.4 |
P |
|
|
|
64 |
Y |
32.0 |
36.0 |
P |
|
|
|
65 |
Y |
30.0 |
31.2 |
P |
|
|
|
66 |
Y |
34.4 |
40.0 |
P |
|
|
|
67 |
Y |
30.0 |
30.4 |
P |
|
|
|
68 |
Y |
30.8 |
30.0 |
P |
|
|
|
69 |
Y |
30.0 |
30.4 |
P |
|
|
|
70 |
Y |
32.0 |
30.0 |
P |
|
|
|
71 |
Y |
33.6 |
34.0 |
P |
|
|
|
72 |
Y |
29.6 |
26.8 |
P |
|
|
| MSSB - 1 |
14 |
SPARE |
SPARE |
SPARE |
P |
|
|
|
36 |
Y |
30.8 |
30.8 |
P |
|
|
| DB 2 |
2 |
Y |
23.2 |
20.4 |
P |
|
|
|
4 |
Y |
29.2 |
19.6 |
P |
|
|
|
6 |
Y |
22.8 |
21.6 |
P |
|
|
|
7 |
Y |
22.8 |
21.2 |
P |
|
|
|
8 |
Y |
29.6 |
22.4 |
P |
|
|
|
9 |
Y |
22.8 |
20.4 |
P |
|
|
|
10 |
Y |
22.8 |
18.8 |
P |
|
|
|
11 |
Y |
29.6 |
20.4 |
P |
|
|
|
12 |
Y |
22.8 |
20.4 |
P |
|
|
|
13 |
Y |
22.8 |
18.8 |
P |
|
|
|
14 |
Y |
28.8 |
21.2 |
P |
|
|
|
15 |
Y |
28.4 |
38.4 |
P |
|
|
|
16 |
Y |
28.4 |
19.6 |
P |
|
|
|
18 |
Y |
28.8 |
20.4 |
P |
|
|
|
|---|
| THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
|---|
| SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
|---|
| Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
- Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
|
|---|
| Timers | - Check timers for correct operation and timing
|
|---|
| Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
|---|
| HTML Block |
|
|---|
| EMERGENCY LIGHTS | | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
| DB 1 |
1 |
S |
Y |
Y |
Y |
P |
|
|
|
|
3 |
S |
Y |
Y |
Y |
P |
|
|
|
|
4 |
S |
Y |
Y |
Y |
P |
|
|
|
|
10 |
S |
Y |
Y |
Y |
P |
|
|
|
|
13 |
R |
Y |
Y |
Y |
P |
|
|
|
|
14 |
R |
Y |
Y |
Y |
P |
|
|
|
|
16 |
S |
Y |
Y |
Y |
P |
|
|
|
|
18 |
R |
Y |
Y |
Y |
P |
|
|
|
|
19 |
R |
Y |
Y |
Y |
P |
|
|
|
|
20 |
S |
Y |
Y |
Y |
P |
|
|
|
|
21 |
S |
Y |
Y |
Y |
P |
|
|
|
|
22 |
S |
Y |
Y |
Y |
P |
|
|
|
|
|---|
| HTML Block |
|
|---|
| EXIT LIGHTS | | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
|
2 |
Y |
Y |
Y |
P |
|
|
|
|
5 |
Y |
Y |
Y |
P |
|
|
|
|
6 |
Y |
Y |
Y |
P |
|
|
|
|
7 |
Y |
Y |
Y |
P |
|
|
|
|
8 |
Y |
Y |
Y |
P |
|
|
|
|
9 |
Y |
Y |
Y |
P |
|
|
|
|
11 |
Y |
Y |
Y |
P |
|
|
|
|
12 |
Y |
Y |
Y |
P |
|
|
|
|
15 |
Y |
Y |
Y |
P |
|
|
|
|
17 |
Y |
Y |
Y |
P |
|
|
|
|
23 |
Y |
Y |
Y |
P |
|
|
|
|
|---|
| SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
|---|
| General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
|---|
| HTML Block |
|
|---|
| General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
|---|
| HTML Block |
|
|---|
| Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
|---|
| Lighting Report | | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
| 1200mm LED Panel Light |
Y |
| LED HiBay Light |
Y |
| 90mm LED Downlight |
Y |
| 120mm LED Downlight |
Y |
| 11w LED Linkable Light |
Y |
| 4ft LED Batten |
Y |
|
|---|
| Are there any Warranty items needing to be repaired? | No |
|---|
| Site Status Selector | Store now fully compliant |
|---|
| Next Test Due in 6 months | 16/01/2025 |
|---|
| |
|---|
| |