Partner Name | Built Services |
---|
State | NSW |
---|
Date of Visit | 17/07/2024 |
---|
Technician's Name | Jamieson Cawsey |
---|
Which Company are you working for? | Sturdie Trade Services |
---|
Sturdie Job Number | 50F0015/0349 |
---|
Email | Email hidden; Javascript is required. |
---|
The Good Guys Site in NSW | artarmon |
---|
|
|
---|
Location Name | Artarmon |
---|
| |
---|
HTML Block |
|
---|
Test Period | Biennial Test (once every two years) |
---|
Push Button Test | - Carry out push button test for correct operation
|
---|
Carry out push button test for correct operation | |
---|
HTML Block |
|
---|
Carry out test with RCD Tester | Carry out push button test and record the results below. |
---|
RCD Details (Biennial) | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
0 Degrees |
180 Degrees |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
DB1 |
1 |
Y |
45 |
50 |
P |
|
|
DB1 |
2 |
Y |
40 |
45 |
P |
|
|
DB1 |
3 |
Y |
65 |
50 |
P |
|
|
DB1 |
4 |
Y |
44 |
40 |
P |
|
|
DB1 |
5 |
Y |
55 |
45 |
P |
|
|
DB1 |
6 |
Y |
25 |
35 |
P |
|
|
DB1 |
6 |
Y |
60 |
56 |
P |
|
|
DB1 |
7 |
Y |
55 |
45 |
P |
|
|
DB1 |
8 |
Y |
45 |
40 |
P |
|
|
DB1 |
9 |
Y |
45 |
54 |
P |
|
|
DB1 |
10 |
Y |
14 |
27 |
P |
|
|
DB1 |
11 |
Y |
65 |
40 |
P |
|
|
DB1 |
12 |
Y |
50 |
45 |
P |
|
|
DB1 |
13 |
Y |
30 |
45 |
P |
|
|
DB1 |
14 |
Y |
45 |
40 |
P |
|
|
DB1 |
15 |
Y |
30 |
35 |
P |
|
|
DB1 |
16 |
Y |
30 |
45 |
P |
|
|
DB1 |
17 |
Y |
45 |
40 |
P |
|
|
DB1 |
18 |
Y |
50 |
45 |
P |
|
|
DB1 |
19 |
Y |
15 |
25 |
P |
|
|
DB1 |
16 |
Y |
55 |
70 |
P |
|
|
DB1 |
17 |
Y |
30 |
55 |
P |
|
|
DB1 |
18 |
Y |
55 |
45 |
P |
|
|
DB1 |
19 |
Y |
70 |
85 |
P |
|
|
DB1 |
20 |
Y |
80 |
75 |
P |
|
|
DB1 |
21 |
Y |
70 |
65 |
P |
|
|
DB1 |
22 |
Y |
65 |
40 |
P |
|
|
DB1 |
23 |
Y |
50 |
45 |
P |
|
|
DB1 |
24 |
Y |
60 |
75 |
P |
|
|
DB1 |
25 |
Y |
85 |
90 |
P |
|
|
DB1 |
26 |
Y |
120 |
65 |
P |
|
|
DB1 |
27 |
Y |
78 |
82 |
P |
|
|
DB1 |
28 |
Y |
30 |
45 |
P |
|
|
DB1 |
29 |
Y |
55 |
30 |
P |
|
|
DB1 |
30 |
Y |
45 |
40 |
P |
|
|
DB1 |
31 |
Y |
60 |
55 |
P |
|
|
DB1 |
32 |
Y |
90 |
76 |
P |
|
|
DB2 |
1 |
Y |
45 |
55 |
P |
|
|
DB2 |
2 |
Y |
50 |
56 |
P |
|
|
DB2 |
3 |
Y |
55 |
45 |
P |
|
|
DB2 |
4 |
Y |
50 |
45 |
P |
|
|
DB2 |
5 |
Y |
55 |
45 |
P |
|
|
DB2 |
6 |
Y |
50 |
35 |
P |
|
|
DB2 |
6 |
Y |
35 |
45 |
P |
|
|
DB2 |
7 |
Y |
75 |
55 |
P |
|
|
DB2 |
8 |
Y |
45 |
55 |
P |
|
|
DB2 |
9 |
Y |
65 |
45 |
P |
|
|
DB2 |
10 |
Y |
67 |
45 |
P |
|
|
DB2 |
11 |
Y |
45 |
55 |
P |
|
|
DB2 |
12 |
Y |
76 |
74 |
P |
|
|
DB2 |
13 |
Y |
45 |
54 |
P |
|
|
DB2 |
14 |
Y |
60 |
45 |
P |
|
|
DB2 |
15 |
Y |
67 |
56 |
P |
|
|
DB2 |
16 |
Y |
56 |
45 |
P |
|
|
DB2 |
17 |
Y |
80 |
70 |
P |
|
|
DB2 |
18 |
Y |
65 |
45 |
P |
|
|
DB2 |
19 |
Y |
45 |
54 |
P |
|
|
DB2 |
20 |
Y |
75 |
65 |
P |
|
|
DB2 |
21 |
Y |
46 |
64 |
P |
|
|
DB2 |
22 |
Y |
75 |
65 |
P |
|
|
DB2 |
23 |
Y |
55 |
65 |
P |
|
|
DB2 |
24 |
Y |
65 |
55 |
P |
|
|
DB2 |
25 |
Y |
35 |
45 |
P |
|
|
DB2 |
26 |
Y |
65 |
55 |
P |
|
|
DB2 |
27 |
Y |
85 |
75 |
P |
|
|
DB2 |
28 |
Y |
65 |
55 |
P |
|
|
DB2 |
29 |
Y |
75 |
30 |
P |
|
|
DB2 |
30 |
Y |
85 |
77 |
P |
|
|
DB2 |
31 |
Y |
45 |
54 |
P |
|
|
DB2 |
32 |
Y |
55 |
45 |
P |
|
|
DB2 |
33 |
Y |
54 |
45 |
P |
|
|
DB2 |
34 |
Y |
85 |
57 |
P |
|
|
DB2 |
35 |
Y |
85 |
75 |
P |
|
|
DB2 |
36 |
Y |
75 |
65 |
P |
|
|
DB2 |
37 |
Y |
45 |
54 |
P |
|
|
DB2 |
38 |
Y |
45 |
55 |
P |
|
|
DB2 |
39 |
Y |
65 |
70 |
P |
|
|
DB2 |
40 |
Y |
54 |
66 |
P |
|
|
|
---|
THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
---|
SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
---|
Timers | - Check timers for correct operation and timing
|
---|
Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
---|
HTML Block |
|
---|
HTML Block |
|
---|
SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
---|
General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
---|
HTML Block |
|
---|
General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
---|
HTML Block |
|
---|
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
---|
Lighting Report | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
Hi-Bay Single Globe |
Y |
Hi-Bay 300mm LED |
Y |
Low-Bay Single Globe |
Y |
200mm Metal Halide Downlight |
Y |
9W LED Downlight |
Y |
2x36W Maintained Emergency fluro diffused |
Y |
1 x 36W Fluoro Diffused |
Y |
Folded Compact Fluoro Downlight |
Y |
|
---|
Are there any Warranty items needing to be repaired? | No |
---|
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
High Bays |
Throughout store |
5 |
Failed highbay |
Y |
N |
N |
|
|
---|
Next Test Due in 6 months | 17/01/2025 |
---|
| |
---|
| |