Partner Name | Built Services |
---|
State | NSW |
---|
Date of Visit | 30/07/2024 |
---|
Technician's Name | Jamieson Cawsey |
---|
Which Company are you working for? | Sturdie Trade Services |
---|
Sturdie Job Number | 50F0015/0351 |
---|
Email | Email hidden; Javascript is required. |
---|
The Good Guys Site in NSW | blacktown |
---|
|
|
---|
Location Name | Blacktown |
---|
| |
---|
HTML Block |
|
---|
Test Period | Biennial Test (once every two years) |
---|
Push Button Test | - Carry out push button test for correct operation
|
---|
Carry out push button test for correct operation | |
---|
HTML Block |
|
---|
Carry out test with RCD Tester | Carry out push button test and record the results below. |
---|
RCD Details (Biennial) | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
0 Degrees |
180 Degrees |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
DB1 |
17 |
Y |
19 |
19 |
P |
|
|
|
18 |
Y |
119 |
79 |
P |
|
|
|
19 |
Y |
51 |
31 |
P |
|
|
|
20 |
Y |
19 |
19 |
P |
|
|
|
21 |
Y |
169 |
119 |
P |
|
|
|
22 |
Y |
45 |
46 |
P |
|
|
|
23 |
Y |
19 |
39 |
P |
|
|
|
24 |
Y |
19 |
19 |
P |
|
|
|
25 |
Y |
21 |
21 |
P |
|
|
|
26 |
Y |
19 |
29 |
P |
|
|
|
27 |
Y |
21 |
25 |
P |
|
|
|
28 |
Y |
72 |
31 |
P |
|
|
|
29 |
Y |
19 |
19 |
P |
|
|
|
32 |
Y |
19 |
100 |
P |
|
|
|
33 |
Y |
19 |
19 |
P |
|
|
|
34 |
Y |
75 |
63 |
P |
|
|
DB1b |
1 |
Y |
212 |
222 |
P |
|
|
|
2 |
Y |
32 |
32 |
P |
|
|
|
3 |
Y |
76 |
72 |
P |
|
|
|
4 |
Y |
97 |
92 |
P |
|
|
|
5 |
Y |
129 |
139 |
P |
|
|
|
6 |
Y |
149 |
151 |
P |
|
|
|
7 |
Y |
48 |
81 |
P |
|
|
|
8 |
Y |
172 |
162 |
P |
|
|
|
9 |
Y |
82 |
80 |
P |
|
|
|
10 |
Y |
70 |
78 |
P |
|
|
|
11 |
Y |
130 |
112 |
P |
|
|
|
12 |
Y |
91 |
100 |
P |
|
|
|
13 |
Y |
87 |
80 |
P |
|
|
DB2 |
3 |
Y |
28 |
18 |
P |
|
|
|
5 |
Y |
28 |
18 |
P |
|
|
|
7 |
Y |
48 |
18 |
P |
|
|
|
10 |
Y |
108 |
38 |
P |
|
|
|
12 |
Y |
48 |
38 |
P |
|
|
|
14 |
Y |
28 |
17 |
P |
|
|
|
22 |
Y |
28 |
37 |
P |
|
|
|
24 |
Y |
28 |
18 |
P |
|
|
Db3 |
4 |
Y |
29 |
218 |
P |
|
|
|
6 |
Y |
48 |
38 |
P |
|
|
|
8 |
Y |
46 |
159 |
P |
|
|
|
10 |
Y |
28 |
17 |
P |
|
|
|
15 |
Y |
50 |
34 |
P |
|
|
|
16 |
Y |
149 |
38 |
P |
|
|
|
18 |
Y |
28 |
18 |
P |
|
|
|
20 |
Y |
24 |
17 |
P |
|
|
|
22 |
Y |
28 |
38 |
P |
|
|
|
24 |
Y |
48 |
18 |
P |
|
|
|
30 |
Y |
25 |
19 |
P |
|
|
|
---|
THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
---|
SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
- Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
|
---|
Timers | - Check timers for correct operation and timing
|
---|
Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
---|
HTML Block |
|
---|
EMERGENCY LIGHTS | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB1 |
S1 |
R |
Y |
Y |
Y |
P |
|
|
|
|
S2 |
R |
Y |
Y |
Y |
P |
|
|
|
|
S3 |
R |
Y |
Y |
Y |
P |
|
|
|
|
S4 |
R |
Y |
Y |
Y |
P |
|
|
|
|
S5 |
R |
Y |
Y |
Y |
P |
|
|
|
|
S6 |
R |
Y |
Y |
Y |
P |
|
|
|
|
S7 |
R |
Y |
Y |
Y |
P |
|
|
|
|
S8 |
R |
Y |
Y |
Y |
P |
|
|
|
|
E1 |
S |
Y |
Y |
Y |
P |
|
|
|
|
E2 |
S |
Y |
Y |
Y |
P |
|
|
|
|
E3 |
S |
Y |
Y |
Y |
P |
|
|
|
|
E4 |
S |
Y |
Y |
Y |
P |
|
|
|
|
E5 |
S |
Y |
Y |
Y |
P |
|
|
|
|
E6 |
S |
Y |
Y |
Y |
P |
|
|
|
|
E7 |
S |
Y |
Y |
Y |
P |
|
|
|
|
E8 |
S |
Y |
Y |
Y |
P |
|
|
|
|
E9 |
S |
Y |
Y |
Y |
P |
|
|
|
|
E10 |
S |
Y |
Y |
Y |
P |
|
|
|
|
E11 |
S |
Y |
Y |
Y |
P |
|
|
|
|
E12 |
S |
Y |
Y |
Y |
P |
|
|
|
|
E13 |
S |
Y |
Y |
Y |
P |
|
|
|
|
E14 |
S |
Y |
Y |
Y |
P |
|
|
|
|
E15 |
S |
Y |
Y |
Y |
P |
|
|
|
|
E16 |
S |
Y |
Y |
Y |
P |
|
|
|
|
E17 |
S |
Y |
Y |
Y |
P |
|
|
|
|
E18 |
S |
Y |
Y |
Y |
P |
|
|
|
|
E19 |
S |
Y |
Y |
Y |
P |
|
|
|
|
E20 |
S |
Y |
Y |
Y |
P |
|
|
|
|
---|
HTML Block |
|
---|
EXIT LIGHTS | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB1 |
1 |
Y |
Y |
Y |
P |
|
|
|
|
2 |
Y |
Y |
Y |
P |
|
|
|
|
3 |
Y |
Y |
Y |
P |
|
|
|
|
4 |
Y |
Y |
Y |
P |
|
|
|
|
5 |
Y |
Y |
Y |
P |
|
|
|
|
6 |
Y |
Y |
Y |
P |
|
|
|
|
7 |
Y |
Y |
Y |
P |
|
|
|
|
8 |
Y |
Y |
Y |
P |
|
|
|
|
9 |
Y |
Y |
Y |
P |
|
|
|
|
10 |
Y |
Y |
Y |
P |
|
|
|
|
11 |
Y |
Y |
Y |
P |
|
|
|
|
12 |
Y |
Y |
Y |
P |
|
|
|
|
13 |
Y |
Y |
Y |
P |
|
|
|
|
14 |
Y |
Y |
Y |
P |
|
|
|
|
15 |
Y |
Y |
Y |
P |
|
|
|
|
---|
SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
---|
General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
---|
HTML Block |
|
---|
General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
---|
HTML Block |
|
---|
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
---|
Lighting Report | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
Halo High Bays |
Y |
Pelmet Lights 21W and 28W T5 Light Boxes |
Y |
2 x 28W Plastic Diffused Fluoro Fitting |
Y |
2 x 28W Caged Fluoro Fitting |
Y |
5W LED Downlight 50mm Fitting |
Y |
150mm LED Downlight |
Y |
|
---|
Are there any Warranty items needing to be repaired? | No |
---|
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
Tripping Circuit |
Cooking area |
1 |
Overloading Circuit |
N |
N |
N |
Added to Fortnightly Repair Report |
|
---|
Site Status Selector | Store now fully compliant |
---|
Next Test Due in 6 months | 29/01/2025 |
---|
| |
---|
| |