Partner Name | Sturdie Trade Services |
---|
State | VIC |
---|
Date of Visit | 06/08/2024 |
---|
Technician's Name | Matt Setches |
---|
Which Company are you working for? | Sturdie Trade Services |
---|
Sturdie Job Number | 50F0017/0317 |
---|
Email | Email hidden; Javascript is required. |
---|
The Good Guys Site in VIC | maribyrnong_warehouse |
---|
|
|
---|
Location Name | Maribyrnong Warehouse |
---|
| |
---|
HTML Block |
|
---|
Test Period | Biennial Test (once every two years) |
---|
Push Button Test | - Carry out push button test for correct operation
|
---|
Carry out push button test for correct operation | |
---|
HTML Block |
|
---|
Carry out test with RCD Tester | Carry out push button test and record the results below. |
---|
RCD Details (Biennial) | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
0 Degrees |
180 Degrees |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
DB-3 |
7 |
Y |
10 |
19 |
P |
|
|
|
11 |
Y |
10 |
20 |
P |
|
|
|
---|
THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
---|
SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
- Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
|
---|
Timers | - Check timers for correct operation and timing
|
---|
Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
---|
HTML Block |
|
---|
EMERGENCY LIGHTS | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB-4 |
5 |
S |
Y |
Y |
Y |
P |
|
|
|
DB-4 |
6 |
S |
Y |
Y |
Y |
P |
|
|
|
DB-4 |
7 |
S |
Y |
Y |
Y |
P |
|
|
|
DB-4 |
8 |
R |
Y |
Y |
Y |
P |
|
|
|
DB-4 |
9 |
R |
Y |
Y |
Y |
P |
|
|
|
DB-4 |
10 |
R |
Y |
Y |
Y |
P |
|
|
|
DB-3 |
11 |
S |
Y |
Y |
Y |
P |
|
|
|
DB-3 |
12 |
S |
Y |
Y |
Y |
P |
|
|
|
DB-3 |
13 |
S |
Y |
Y |
Y |
P |
|
|
|
DB-3 |
14 |
S |
Y |
Y |
Y |
P |
|
|
|
DB-4 |
15 |
R |
Y |
Y |
Y |
P |
|
|
|
DB-4 |
16 |
R |
Y |
Y |
Y |
P |
|
|
|
|
---|
HTML Block |
|
---|
EXIT LIGHTS | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB-4 |
1 |
Y |
Y |
Y |
P |
|
|
|
DB-4 |
2 |
Y |
Y |
Y |
P |
|
|
|
DB-4 |
3 |
Y |
Y |
Y |
P |
|
|
|
DB-4 |
4 |
Y |
Y |
Y |
P |
|
|
|
DB-4 |
17 |
Y |
Y |
Y |
P |
|
|
|
|
---|
SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
---|
General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
---|
HTML Block |
|
---|
General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
---|
HTML Block |
|
---|
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
---|
Lighting Report | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
LED Hi-bay lights |
Y |
36W diffused lights |
Y |
|
---|
Are there any Warranty items needing to be repaired? | No |
---|
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
Hi-Bay |
Warehouse |
5 |
Failed to illuminate |
Y |
N |
N |
|
Lights |
Under mezzanine |
1 |
Lights turn off with emergency lights causing staff to work in darkness |
Y |
N |
N |
Separated lighting feed from emergency lighting and connected to existing office circuit. |
Unit 4 Switchboard |
Upstairs Warehouse |
14 |
Circuits not on RCD protection |
N |
N |
N |
10 x 16A RCBO's and 4 x 10A RCBO's required to replace circuit breakers. Added to fortnightly repairs list. |
Unit 3 Switchboard |
Downstairs Warehouse |
16 |
Circuits not on RCD protection |
N |
N |
N |
14 x 16A RCBO's and 2 x 10A RCBO's required to replace circuit breakers. Added to fortnightly repairs list. |
Unit 3 Switchboard |
Downstairs Warehouse |
5 x 3phase |
Circuits not on RCD protection |
N |
N |
N |
1 x 63A 3 phase, 1x 15A 3phase, 2 x 20A 3 phase and 1x 8A 3phase required to replace circuit breakers. Added to fortnightly repairs list. |
Unit 3 Switchboard |
Downstairs Warehouse |
2 |
Holes in bottom of switcboard |
N |
N |
N |
Observation |
Unit 3 Switchboard |
Downstairs Warehouse |
1 |
Fire seal missing from cable entry |
N |
N |
N |
Requires Fire Seal. Added to forntightly repairs list |
Unit 3 Switchboard |
Downstairs Warehouse |
1 |
Silicon holding mains cables into main switch |
N |
N |
N |
Observation |
|
---|
Site Status Selector | Store now fully compliant |
---|
Next Test Due in 6 months | 06/02/2025 |
---|
| |
---|
| |