Partner NameBuilt Services
StateSA
Date of Visit22/08/2024
Technician's NameGlenn Rowe
Which Company are you working for?Sturdie Trade Services
Sturdie Job Number50F0021/0058
EmailEmail hidden; Javascript is required.
The Good Guys Site in SAmarion

Location NameMarion
HTML Block
Test PeriodBiennial Test (once every two years)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

RCD Details (Biennial)
Distribution Board No. Circuit No. Push Button (YorN) 0 Degrees 180 Degrees Pass / Fail (PorF) Fault? Repaired on Site (YorN)
MBD.T2 R5 Y 033 033 P
W5 Y 029 030 P
B5 Y 041 042 P
W6 Y 030 030 P
B6 Y 032 030 P
R7 Y 030 032 P
W7 Y 034 033 P
R8 Y 031 033 P
R19 Y 029 039 P
W19 Y 031 039 P
B19 Y 032 032 P
W20 Y 031 031 P
R21 Y 030 030 P
W21 Y 034 036 P
W23 Y 030 048 P
B23 Y 032 034 P
R25 Y 036 030 P
W25 Y 037 038 P
B25 Y 030 043 P
R27 Y 030 031 P
W27 Y 034 033 P
MDB.T3 W5 Y 029 040 P
B5 Y 030 031 P
R6 Y 031 032 P
R7 Y 030 030 P
W7 Y 030 030 P
B7 Y 031 031 P
W19 Y 027 033 P
B19 Y 031 042 P
R20 Y 031 041 P
W20 Y 033 030 P
B20 Y 065 034 P
R21 Y 032 033 P
W21 Y 032 043 P
B21 Y 031 042 P
R22 Y 019 029 P
W22 Y 040 047 P
B22 Y 047 091 P
R23 Y 030 040 P
W23 Y 030 030 P
B23 Y 038 034 P
R25 Y 032 024 P
W25 Y 029 040 P
R26 Y 024 018 P
W26 Y 029 040 P
B26 Y 024 020 P
R28 Y 038 030 P
W28 Y 030 030 P
DB.T2-2 R1 Y 039 029 P
W1 Y 026 024 P
B1 Y 030 030 P
W2 Y 032 039 P
B2 Y 028 021 P
R21 Y 033 033 P
W21 Y 029 030 P
B21 Y 032 041 P
R22 Y 034 043 P
W22 Y 030 033 P
B22 Y 032 034 P
R23 Y 031 043 P
W23 Y 050 033 P
B23 Y 034 037 P
R24 Y 033 64 P
W24 Y 024 020 P
B24 Y 046 052 P
R25 Y 038 030 P
W25 Y 038 030 P
B25 Y 032 030 P
R26 Y 030 030 P
W26 Y 029 032 P
B26 Y 023 033 P
R27 Y 028 044 P
W27 Y 025 020 P
B27 Y 024 017 P
R28 Y 025 021 P
W28 Y 025 021 P
B28 Y 027 020 P
R29 Y 023 032 P
W29 Y 020 029 P
B29 Y 040 025 P
R30 Y 032 042 P
W30 Y 030 030 P
B30 Y 030 030 P
R32 Y 030 030 P
3 PHASE R31 Y 021 020 P
3 PHASE W31 Y 022 022 P
3 PHASE B31 Y 028 028 P
DB.T3-2 R8 Y 030 063 P
W8 Y 032 030 P
B8 Y 036 030 P
R10 Y 042 036 P
W10 Y 030 030 P
B10 Y 031 032 P
R11 Y 033 032 P
W11 Y 032 032 P
B11 Y 031 074 P
R12 Y 067 034 P
W12 Y 041 040 P
B12 Y 032 031 P
R14 Y 031 030 P
W14 Y 030 032 P
B14 Y 030 031 P
R16 Y 031 032 P
W16 Y 034 033 P
B16 Y 030 030 P
R18 Y 030 031 P
W18 Y 029 029 P
THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
  • Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
1 S Y Y Y P
2 S Y Y Y P
3 S Y Y Y P
4 S Y Y Y P
5 S Y Y Y P
6 S Y Y Y P
7 S Y Y Y P
8 S Y Y Y P
9 S Y Y Y P
10 S Y Y Y P
11 S Y Y Y P
12 S Y Y Y P
13 S Y Y Y P
14 S Y Y Y P
15 R Y Y Y P
16 R Y Y Y P
17 R Y Y Y P
18 R Y Y Y P
19 R Y Y Y P
20 R Y Y Y P
21 S Y Y Y P
HTML Block
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
1 Y Y Y P
2 Y Y Y P
3 Y N Y F Battery Failed Y N
3A Y Y Y P
4 Y Y Y P
5 Y Y Y P
6 Y Y Y P
7 Y Y Y P
8 Y Y Y P
9 Y Y Y P
10 Y Y Y P
11 Y Y Y P
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Check with Store Manager to ensure there are no other issues
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auYes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten) Existing (YorN)
28w Fluoro Troffers Y
Highbay Lights Y
10w Downlights Y
Are there any Warranty items needing to be repaired?No
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
Jumbo Exit Light #3 Warehouse 1 Battery Failed Y N N
Site Status SelectorStore now fully compliant
Next Test Due in 6 months24/02/2025