| Partner Name | Built Services |
|---|
| State | VIC |
|---|
| Date of Visit | 08/07/2024 |
|---|
| Technician's Name | Liam Burns |
|---|
| Which Company are you working for? | Sturdie Trade Services |
|---|
| Sturdie Job Number | 50F0017/0302 |
|---|
| Email | Email hidden; Javascript is required. |
|---|
| The Good Guys Site in VIC | traralgon |
|---|
|
|
|---|
| Location Name | Traralgon |
|---|
| |
|---|
| HTML Block |
|
|---|
| Test Period | Biennial Test (once every two years) |
|---|
| Push Button Test | - Carry out push button test for correct operation
|
|---|
| Carry out push button test for correct operation | |
|---|
| HTML Block |
|
|---|
| Carry out test with RCD Tester | Carry out push button test and record the results below. |
|---|
| RCD Details (Biennial) | | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
0 Degrees |
180 Degrees |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
| MSB 1 |
4 |
Y |
37.9 |
32.2 |
P |
|
|
|
6 |
Y |
30.3 |
30.1 |
P |
|
|
|
8 |
Y |
38.3 |
29.4 |
P |
|
|
|
10 |
Y |
32.2 |
30.5 |
P |
|
|
|
12 |
Y |
29.7 |
30.7 |
P |
|
|
|
14 |
Y |
31.6 |
31.1 |
P |
|
|
|
16 |
Y |
31.6 |
39.9 |
P |
|
|
|
18 |
Y |
31.6 |
33.7 |
P |
|
|
|
20 |
Y |
33.9 |
32.6 |
P |
|
|
|
22 |
Y |
7.80 |
13.1 |
P |
|
|
|
24 |
Y |
31.4 |
30.5 |
P |
|
|
|
26 |
Y |
38.3 |
31.1 |
P |
|
|
|
28 |
Y |
27.9 |
29.0 |
P |
|
|
|
30 |
Y |
37.9 |
37.9 |
P |
|
|
|
32 |
Y |
36.9 |
30.3 |
P |
|
|
|
34 |
Y |
36.9 |
37.7 |
P |
|
|
|
36 |
Y |
39.0 |
37.9 |
P |
|
|
|
38 |
Y |
39.6 |
31.6 |
P |
|
|
|
40 |
Y |
32.0 |
38.1 |
P |
|
|
|
42 |
Y |
37.5 |
31.8 |
P |
|
|
|
44 |
Y |
38.7 |
37.5 |
P |
|
|
|
46 |
Y |
32.0 |
29.0 |
P |
|
|
|
48 |
Y |
19.3 |
18.6 |
P |
|
|
|
50 |
Y |
18.2 |
18.6 |
P |
|
|
|
52 |
Y |
18.6 |
39.0 |
P |
|
|
|
54 |
Y |
29.7 |
39.0 |
P |
|
|
|
56 |
Y |
30.1 |
29.1 |
P |
|
|
|
58 |
Y |
38.2 |
31.4 |
P |
|
|
|
60 |
Y |
36.4 |
31.1 |
P |
|
|
|
62 |
N |
N/A |
N/A |
Spare |
|
|
| MSB-2 |
64 |
N |
N/A |
N/A |
Spare |
|
|
|
66 |
N |
N/A |
N/A |
Circuit Breaker |
|
|
|
68 |
Y |
6.60 |
16.3 |
P |
|
|
|
7 |
Y |
28.8 |
29.0 |
P |
|
|
|
13 |
Y |
22.2 |
22.2 |
P |
|
|
|
19 |
Y |
19.0 |
22.9 |
P |
|
|
|
25 |
Y |
N/A |
N/A |
Locked Out |
|
|
|
31 |
Y |
22.2 |
22.7 |
P |
|
|
|
37 |
Y |
32.0 |
30.7 |
P |
|
|
|
39 |
Y |
6.80 |
17.2 |
P |
|
|
|
41 |
Y |
31.6 |
29.1 |
P |
|
|
|
43 |
Y |
30.1 |
39.0 |
P |
|
|
|
45 |
Y |
31.1 |
32.0 |
P |
|
|
|
47 |
Y |
35.8 |
48.1 |
P |
|
|
|
49 |
Y |
30.9 |
39.2 |
P |
|
|
|
51 |
Y |
30.9 |
39.2 |
P |
|
|
|
53 |
Y |
38.3 |
37.3 |
P |
|
|
|
55 |
Y |
33.5 |
41.7 |
P |
|
|
|
57 |
Y |
6.10 |
12.7 |
P |
|
|
|
59 |
Y |
29.7 |
39.2 |
P |
|
|
|
61 |
N |
N/A |
N/A |
Circuit Breaker |
|
|
|
63 |
Y |
39.0 |
31.4 |
P |
|
|
|
65 |
Y |
30.7 |
38.1 |
P |
|
|
|
67 |
Y |
31.4 |
37.9 |
P |
|
|
|
69 |
N |
N/A |
N/A |
Circuit Breaker |
|
|
|
71 |
Y |
8.10 |
17.1 |
P |
|
|
|
73 |
N |
N/A |
N/A |
Spare |
|
|
|
75 |
N |
N/A |
N/A |
Circuit Breaker |
|
|
|
77 |
Y |
4.00 |
12.3 |
P |
|
|
|
78 |
Y |
21.8 |
21.6 |
P |
|
|
|
81 |
Y |
29.2 |
29.0 |
P |
|
|
| DB-2 |
15 |
Y |
41.9 |
38.1 |
P |
|
|
|
17 |
Y |
37.9 |
31.1 |
P |
|
|
|
2 |
Y |
38.7 |
41.1 |
P |
|
|
|
4 |
Y |
35.2 |
30.1 |
P |
|
|
|
6 |
Y |
38.1 |
38.6 |
P |
|
|
|
8 |
Y |
28.6 |
28.1 |
P |
|
|
|
10 |
Y |
29.7 |
29.7 |
P |
|
|
|
12 |
Y |
32.4 |
30.7 |
P |
|
|
|
14 |
Y |
34.1 |
41.9 |
P |
|
|
|
16 |
Y |
33.3 |
42.4 |
P |
|
|
|
18 |
Y |
33.3 |
42.4 |
P |
|
|
|
20 |
Y |
34.3 |
44.5 |
P |
|
|
|
22 |
Y |
36.0 |
30.5 |
P |
|
|
|
24 |
Y |
32.4 |
32.0 |
P |
|
|
|
26 |
Y |
34.3 |
30.5 |
P |
|
|
|
28 |
Y |
30.3 |
29.9 |
P |
|
|
|
30 |
N |
N/A |
N/A |
Circuit Breaker |
|
|
|
32 |
Y |
43.2 |
44.5 |
P |
|
|
|
34 |
Y |
30.5 |
29.9 |
P |
|
|
|
36 |
N |
N/A |
N/A |
Circuit Breaker |
|
|
|
38 |
Y |
31.1 |
31.1 |
P |
|
|
|
40 |
Y |
29.7 |
29.0 |
P |
|
|
|
42 |
Y |
33.3 |
30.9 |
P |
|
|
|
44 |
Y |
32.4 |
31.4 |
P |
|
|
|
46 |
Y |
30.7 |
31.6 |
P |
|
|
|
48 |
Y |
39.6 |
39.2 |
P |
|
|
|
|---|
| THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
|---|
| SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
|---|
| Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
|
|---|
| Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
- Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
|
|---|
| Timers | - Check timers for correct operation and timing
|
|---|
| Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
|---|
| HTML Block |
|
|---|
| EMERGENCY LIGHTS | | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
| MSB 1 |
4 |
S |
N |
N |
N |
F |
Failed 90min discharge test |
Y |
N |
| MSB 1 |
5 |
S |
Y |
Y |
Y |
P |
|
|
|
| MSB 1 |
6 |
S |
N |
N |
N |
F |
Failed 90min discharge test |
Y |
N |
| MSB 2 |
7 |
S |
Y |
Y |
Y |
P |
|
|
|
| MSB 2 |
11 |
R |
N |
N |
N |
F |
Failed 90min discharge test |
Y |
N |
| MSB 2 |
12 |
R |
Y |
Y |
Y |
P |
|
|
|
| MSB 2 |
15 |
R |
Y |
Y |
Y |
P |
|
|
|
| MSB 1 |
16 |
R |
Y |
Y |
Y |
P |
|
|
|
|
|---|
| HTML Block |
|
|---|
| EXIT LIGHTS | | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
| MSB 1 |
1 |
Y |
Y |
Y |
P |
|
|
|
| MSB 1 |
2 |
N |
N |
N |
F |
Failed 90min discharge test |
Y |
N |
| MSB 1 |
3 |
Y |
Y |
Y |
P |
|
|
|
| MSB 1 |
8 |
Y |
Y |
Y |
P |
|
|
|
| MSB 2 |
9 |
Y |
Y |
Y |
P |
|
|
|
| MSB 2 |
10 |
Y |
Y |
Y |
P |
|
|
|
| MSB 2 |
14 |
Y |
Y |
Y |
P |
|
|
|
| MSB 2 |
17 |
Y |
Y |
Y |
P |
|
|
|
|
|---|
| SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
|---|
| General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
|---|
| HTML Block |
|
|---|
| General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
|---|
| HTML Block |
|
|---|
| Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
|---|
| Lighting Report | | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
| Twin 4ft LED Fluorescent Lights |
Y |
| Batten lights |
Y |
| Recessed halogen downlights |
Y |
| 2ft display fluorescent lights |
Y |
|
|---|
| Are there any Warranty items needing to be repaired? | No |
|---|
| LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
| Jumbo Exit Light No.2 |
Fire Door Exit |
1 |
Failed 90min discharge test |
Y |
N |
N |
|
| Recessed Emergency Light No.11 |
Store |
1 |
Failed 90min discharge test |
Y |
N |
N |
|
| Emegency Batten No.4 |
Store |
1 |
Failed 90min discharge test |
Y |
N |
N |
Replaced with 1 x new Surface Mount Emergency Light |
| Emegency Batten No.6 |
Store |
1 |
Failed 90min discharge test |
Y |
N |
N |
Replaced with 1 x new Surface Mount Emergency Light |
|
|---|
| Site Status Selector | Store now fully compliant |
|---|
| Next Test Due in 6 months | 08/01/2025 |
|---|
| |
|---|
| |