Partner Name | Built Services |
---|
State | TAS |
---|
Date of Visit | 08/08/2024 |
---|
Technician's Name | Steve Ward |
---|
Which Company are you working for? | Sturdie Trade Services |
---|
Sturdie Job Number | 50F0027/0024 |
---|
Email | Email hidden; Javascript is required. |
---|
The Good Guys Site in TAS | Launceston |
---|
|
|
---|
Location Name | Launceston |
---|
| |
---|
HTML Block |
|
---|
Test Period | Biennial Test (once every two years) |
---|
Push Button Test | - Carry out push button test for correct operation
|
---|
Carry out push button test for correct operation | |
---|
HTML Block |
|
---|
Carry out test with RCD Tester | Carry out push button test and record the results below. |
---|
RCD Details (Biennial) | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
0 Degrees |
180 Degrees |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
DB |
1 |
Y |
28.8 |
19.6 |
P |
|
|
|
2 |
Y |
29.2 |
19.2 |
P |
|
|
|
3 |
Y |
29.2 |
19.6 |
P |
|
|
|
4 |
Y |
29.2 |
19.2 |
P |
|
|
|
5 |
SPARE |
SPARE |
SPARE |
P |
|
|
|
6 |
SPARE |
SPARE |
SPARE |
P |
|
|
|
7 |
Y |
26.8 |
18.8 |
P |
|
|
|
8 |
Y |
27.2 |
17.6 |
P |
|
|
|
9 |
Y |
29.2 |
19.2 |
P |
|
|
|
10 |
Y |
28 |
16 |
P |
|
|
|
11 |
Y |
28.8 |
18 |
P |
|
|
|
12 |
Y |
27.2 |
17.6 |
P |
|
|
|
13 |
3 Phase |
3 Phase |
3 Phase |
P |
|
|
|
14 |
3 Phase |
3 Phase |
3 Phase |
P |
|
|
|
15 |
3 Phase |
3 Phase |
3 Phase |
P |
|
|
|
16 |
Y |
28.4 |
19.6 |
P |
|
|
|
17 |
Y |
29.2 |
18.8 |
P |
|
|
|
18 |
Y |
29.2 |
19.6 |
P |
|
|
|
19 |
Y |
29.2 |
19.2 |
P |
|
|
|
20 |
Y |
25.6 |
19.2 |
P |
|
|
|
21 |
Y |
29.2 |
18.8 |
P |
|
|
|
22 |
Y |
26 |
19.2 |
P |
|
|
|
23 |
Y |
25.6 |
15.8 |
P |
|
|
Power DB A |
24 |
Y |
29.2 |
19.6 |
P |
|
|
|
25 |
Y |
29.2 |
19.2 |
P |
|
|
|
26 |
Y |
29.2 |
19.2 |
P |
|
|
|
27 |
Y |
32.4 |
19.2 |
P |
|
|
|
28 |
Y |
29.2 |
19.2 |
P |
|
|
|
29 |
Y |
29.2 |
19.2 |
P |
|
|
|
30 |
SPARE |
SPARE |
SPARE |
P |
|
|
|
31 |
SPARE |
SPARE |
SPARE |
P |
|
|
|
32 |
SPARE |
SPARE |
SPARE |
P |
|
|
|
33 |
SPARE |
SPARE |
SPARE |
P |
|
|
|
34 |
Y |
22.8 |
19.6 |
P |
|
|
|
35 |
Y |
28.4 |
19.2 |
P |
|
|
|
36 |
Y |
28 |
20.4 |
P |
|
|
|
37 |
Y |
31.6 |
20.8 |
P |
|
|
|
38 |
Y |
29.2 |
19.6 |
P |
|
|
|
39 |
Y |
29.2 |
19.2 |
P |
|
|
|
40 |
Y |
28.8 |
19.6 |
P |
|
|
|
41 |
Y |
28.4 |
18.4 |
P |
|
|
|
42 |
SPARE |
SPARE |
SPARE |
P |
|
|
|
43 |
Y |
29.2 |
19.6 |
P |
|
|
|
44 |
Y |
29.2 |
19.6 |
P |
|
|
|
45 |
Y |
29.2 |
19.6 |
P |
|
|
|
46 |
Y |
29.2 |
19.2 |
P |
|
|
|
47 |
Y |
29.2 |
24.8 |
P |
|
|
|
48 |
Y |
29.2 |
19.2 |
P |
|
|
|
49 |
Y |
22.8 |
17.6 |
P |
|
|
|
50 |
SPARE |
SPARE |
SPARE |
P |
|
|
|
51 |
SPARE |
SPARE |
SPARE |
P |
|
|
|
52 |
Y |
22.8 |
12.8 |
P |
|
|
|
53 |
Y |
28.8 |
18.8 |
P |
|
|
|
54 |
Y |
29.2 |
19.2 |
P |
|
|
|
55 |
Y |
28 |
18.4 |
P |
|
|
|
56 |
Y |
28.8 |
18.8 |
P |
|
|
|
57 |
Y |
29.2 |
19.6 |
P |
|
|
|
58 |
3 Phase |
3 Phase |
3 Phase |
P |
|
|
|
59 |
3 Phase |
3 Phase |
3 Phase |
P |
|
|
|
60 |
3 Phase |
3 Phase |
3 Phase |
P |
|
|
Power DB B |
61 |
Y |
27.2 |
18 |
P |
|
|
|
62 |
Y |
26.8 |
16.4 |
P |
|
|
|
63 |
Y |
22.8 |
17.6 |
P |
|
|
|
64 |
Y |
22.8 |
12.8 |
P |
|
|
|
65 |
Y |
31.6 |
19.6 |
P |
|
|
|
66 |
Y |
22.8 |
12.8 |
P |
|
|
|
67 |
Y |
22.8 |
18.4 |
P |
|
|
|
68 |
Y |
28 |
18 |
P |
|
|
|
69 |
Y |
27.2 |
18.4 |
P |
|
|
|
70 |
Y |
28.4 |
12.8 |
P |
|
|
|
71 |
Y |
22.8 |
18 |
P |
|
|
|
72 |
Y |
28.4 |
18.4 |
P |
|
|
|
73 |
Y |
26.8 |
18.8 |
P |
|
|
|
74 |
Y |
28.4 |
18 |
P |
|
|
|
75 |
Y |
26.8 |
18.4 |
P |
|
|
|
76 |
Y |
25.6 |
12.8 |
P |
|
|
|
77 |
3 Phase |
3 Phase |
3 Phase |
P |
|
|
|
78 |
3 Phase |
3 Phase |
3 Phase |
P |
|
|
|
79 |
Y |
33.4 |
33.4 |
P |
|
|
|
80 |
Y |
34.4 |
34.5 |
P |
|
|
|
81 |
Y |
34.4 |
34.3 |
P |
|
|
|
82 |
3 Phase |
3 Phase |
3 Phase |
P |
|
|
|
83 |
Y |
29.2 |
19.2 |
P |
|
|
|
84 |
Y |
29.2 |
19.6 |
P |
|
|
|
85 |
Y |
29.2 |
19.2 |
P |
|
|
|
86 |
Y |
29.2 |
19.6 |
P |
|
|
|
87 |
Y |
29.2 |
19.2 |
P |
|
|
|
88 |
Y |
28.4 |
18.8 |
P |
|
|
|
89 |
Y |
29.2 |
19.2 |
P |
|
|
|
90 |
Y |
29.2 |
19.2 |
P |
|
|
|
91 |
Y |
22.8 |
12.8 |
P |
|
|
|
92 |
Y |
29.2 |
19.6 |
P |
|
|
|
93 |
SPARE |
SPARE |
SPARE |
P |
|
|
|
94 |
Y |
28.4 |
18 |
P |
|
|
|
95 |
Y |
27.2 |
18 |
P |
|
|
|
96 |
SPARE |
SPARE |
SPARE |
P |
|
|
|
97 |
Y |
28 |
22.4 |
P |
|
|
|
98 |
Y |
28 |
18 |
P |
|
|
|
99 |
Y |
22.8 |
12.8 |
P |
|
|
|
100 |
Y |
22.8 |
18.8 |
P |
|
|
|
101 |
Y |
29.2 |
18.8 |
P |
|
|
|
102 |
Y |
28.8 |
19.6 |
P |
|
|
|
103 |
Y |
26.4 |
12.8 |
P |
|
|
|
104 |
Y |
28 |
17.6 |
P |
|
|
|
105 |
Y |
24.8 |
16 |
P |
|
|
|
106 |
Y |
28.4 |
19.6 |
P |
|
|
|
107 |
Y |
22.8 |
19.2 |
P |
|
|
|
108 |
Y |
29.2 |
19.6 |
P |
|
|
|
109 |
Y |
29.4 |
19.6 |
P |
|
|
|
110 |
Y |
22.8 |
12.8 |
P |
|
|
|
111 |
Y |
29.2 |
18.4 |
P |
|
|
|
112 |
Y |
28.4 |
19.2 |
P |
|
|
|
113 |
Y |
29.2 |
19.6 |
P |
|
|
|
114 |
Y |
22.8 |
12.8 |
P |
|
|
|
115 |
Y |
26.6 |
18 |
P |
|
|
|
116 |
Y |
22.8 |
12.8 |
P |
|
|
|
117 |
Y |
29.2 |
19.6 |
P |
|
|
|
118 |
Y |
29.2 |
19.2 |
P |
|
|
|
119 |
Y |
29.2 |
19.6 |
P |
|
|
|
120 |
Y |
29.2 |
19.2 |
P |
|
|
|
121 |
Y |
29.2 |
19.6 |
P |
|
|
|
122 |
Y |
29.2 |
19.2 |
P |
|
|
|
123 |
Y |
29.2 |
19.6 |
P |
|
|
|
124 |
Y |
29.2 |
18.8 |
P |
|
|
|
125 |
Y |
29.2 |
19.6 |
P |
|
|
|
126 |
Y |
29.2 |
19.2 |
P |
|
|
|
127 |
Y |
29.2 |
19.6 |
P |
|
|
|
128 |
SPARE |
SPARE |
SPARE |
P |
|
|
|
129 |
SPARE |
SPARE |
SPARE |
P |
|
|
|
130 |
SPARE |
SPARE |
SPARE |
P |
|
|
|
131 |
SPARE |
SPARE |
SPARE |
P |
|
|
|
132 |
SPARE |
SPARE |
SPARE |
P |
|
|
MSB - Roller Door |
3PM - 21 |
Y |
21 |
21 |
P |
|
|
|
3PM - 23 |
Y |
23 |
23 |
P |
|
|
|
R25 |
Y |
19.6 |
9.6 |
P |
|
|
|
W27 |
Y |
20 |
10.8 |
P |
|
|
Roller Door |
B29 |
Y |
20.8 |
10.8 |
P |
|
|
Roller Door |
3PM - 22 |
Y |
20.8 |
10.8 |
P |
|
|
|
R24 |
Y |
8 |
18.4 |
P |
|
|
|
W26 |
Y |
12.8 |
22.4 |
P |
|
|
|
B28 |
Y |
12.8 |
18.8 |
P |
|
|
Roller Door |
30 |
SPARE |
SPARE |
SPARE |
P |
|
|
Office A.C |
19 |
Y |
24.8 |
15.2 |
P |
|
|
|
---|
THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
---|
SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
- Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
|
---|
Timers | - Check timers for correct operation and timing
|
---|
Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
---|
HTML Block |
|
---|
EMERGENCY LIGHTS | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB A |
3 |
S |
Y |
Y |
Y |
P |
|
|
|
|
5 |
S |
Y |
Y |
Y |
P |
|
|
|
|
7 |
S |
Y |
Y |
Y |
P |
|
|
|
|
9 |
S |
Y |
Y |
Y |
P |
|
|
|
|
10 |
S |
Y |
Y |
Y |
P |
|
|
|
|
13 |
S |
Y |
Y |
Y |
P |
|
|
|
|
14 |
S |
Y |
Y |
Y |
P |
|
|
|
|
15 |
S |
Y |
Y |
Y |
P |
|
|
|
|
16 |
S |
Y |
Y |
Y |
P |
|
|
|
|
17 |
S |
Y |
Y |
Y |
P |
|
|
|
|
18 |
S |
Y |
Y |
Y |
P |
|
|
|
|
22 |
S |
Y |
Y |
Y |
P |
|
|
|
|
25 |
S |
Y |
Y |
Y |
P |
|
|
|
|
26 |
S |
Y |
Y |
Y |
P |
|
|
|
|
27 |
S |
Y |
Y |
Y |
P |
|
|
|
|
29 |
S |
Y |
Y |
Y |
P |
|
|
|
|
31 |
S |
Y |
Y |
Y |
P |
|
|
|
|
34 |
S |
Y |
Y |
Y |
P |
|
|
|
|
35 |
S |
Y |
Y |
Y |
P |
|
|
|
|
38 |
S |
Y |
Y |
Y |
P |
|
|
|
|
39 |
S |
Y |
Y |
Y |
P |
|
|
|
|
40 |
S |
Y |
Y |
Y |
P |
|
|
|
|
41 |
S |
Y |
Y |
Y |
P |
|
|
|
|
42 |
S |
Y |
Y |
Y |
P |
|
|
|
|
43 |
S |
Y |
Y |
Y |
P |
|
|
|
|
44 |
S |
Y |
Y |
Y |
P |
|
|
|
|
45 |
S |
Y |
Y |
Y |
P |
|
|
|
|
46 |
S |
Y |
Y |
Y |
P |
|
|
|
|
47 |
S |
Y |
Y |
Y |
P |
|
|
|
|
48 |
S |
Y |
Y |
Y |
P |
|
|
|
|
49 |
S |
Y |
Y |
Y |
P |
|
|
|
|
51 |
S |
Y |
Y |
Y |
P |
|
|
|
|
54 |
S |
Y |
Y |
Y |
P |
|
|
|
|
55 |
S |
Y |
Y |
Y |
P |
|
|
|
|
---|
HTML Block |
|
---|
EXIT LIGHTS | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB A |
1 |
Y |
Y |
Y |
P |
|
|
|
|
2 |
Y |
Y |
Y |
P |
|
|
|
|
4 |
Y |
Y |
Y |
P |
|
|
|
|
6 |
Y |
Y |
Y |
P |
|
|
|
|
8 |
Y |
Y |
Y |
P |
|
|
|
|
11 |
Y |
Y |
Y |
P |
|
|
|
|
12 |
Y |
Y |
Y |
P |
|
|
|
|
19 |
Y |
Y |
Y |
P |
|
|
|
|
20 |
Y |
Y |
Y |
P |
|
|
|
|
21 |
Y |
Y |
Y |
P |
|
|
|
|
23 |
Y |
Y |
Y |
P |
|
|
|
|
24 |
Y |
Y |
Y |
P |
|
|
|
|
27 |
Y |
Y |
Y |
P |
|
|
|
|
30 |
Y |
Y |
Y |
P |
|
|
|
|
32 |
Y |
Y |
Y |
P |
|
|
|
|
33 |
Y |
Y |
Y |
P |
|
|
|
|
36 |
Y |
Y |
Y |
P |
|
|
|
|
37 |
Y |
Y |
Y |
P |
|
|
|
|
50 |
Y |
Y |
Y |
P |
|
|
|
|
52 |
Y |
Y |
Y |
P |
|
|
|
|
53 |
Y |
Y |
Y |
P |
|
|
|
|
56 |
Y |
Y |
Y |
P |
|
|
|
|
57 |
Y |
Y |
Y |
P |
|
|
|
|
---|
SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
---|
General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
---|
HTML Block |
|
---|
General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
---|
HTML Block |
|
---|
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
---|
Lighting Report | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
150W LED Hibay Suspended |
Y |
35W LED Batten |
Y |
LED Track Lights |
Y |
LED Strip |
Y |
|
---|
Are there any Warranty items needing to be repaired? | Yes |
---|
WARRANTY | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault/problem |
Manufacturer |
Part Number |
Repaired on Site |
Comments |
Track Spotlights |
Shopfloor |
11 |
Not working |
StudioAll |
- |
N |
To be repaired under warranty Job #50F0027/0029 |
|
---|
Geotag photo(s) | - Have you sent the Geotag photo(s) to maintenance@sturdie.com.au, referring to the Store Location in the email, e.g. Canberra City?
|
---|
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
Site Logbook Folder |
Office |
1 |
Missing |
Y |
N |
N |
A new Site Logbook folder will be delivered to the site. |
|
---|
Site Status Selector | Store now fully compliant |
---|
Next Test Due in 6 months | 08/02/2025 |
---|
| |
---|
| |