Partner NameBuilt Services
StateTAS
Date of Visit08/08/2024
Technician's NameSteve Ward
Which Company are you working for?Sturdie Trade Services
Sturdie Job Number50F0027/0024
EmailEmail hidden; Javascript is required.
The Good Guys Site in TASLaunceston

Location NameLaunceston
HTML Block
Test PeriodBiennial Test (once every two years)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

RCD Details (Biennial)
Distribution Board No. Circuit No. Push Button (YorN) 0 Degrees 180 Degrees Pass / Fail (PorF) Fault? Repaired on Site (YorN)
DB 1 Y 28.8 19.6 P
2 Y 29.2 19.2 P
3 Y 29.2 19.6 P
4 Y 29.2 19.2 P
5 SPARE SPARE SPARE P
6 SPARE SPARE SPARE P
7 Y 26.8 18.8 P
8 Y 27.2 17.6 P
9 Y 29.2 19.2 P
10 Y 28 16 P
11 Y 28.8 18 P
12 Y 27.2 17.6 P
13 3 Phase 3 Phase 3 Phase P
14 3 Phase 3 Phase 3 Phase P
15 3 Phase 3 Phase 3 Phase P
16 Y 28.4 19.6 P
17 Y 29.2 18.8 P
18 Y 29.2 19.6 P
19 Y 29.2 19.2 P
20 Y 25.6 19.2 P
21 Y 29.2 18.8 P
22 Y 26 19.2 P
23 Y 25.6 15.8 P
Power DB A 24 Y 29.2 19.6 P
25 Y 29.2 19.2 P
26 Y 29.2 19.2 P
27 Y 32.4 19.2 P
28 Y 29.2 19.2 P
29 Y 29.2 19.2 P
30 SPARE SPARE SPARE P
31 SPARE SPARE SPARE P
32 SPARE SPARE SPARE P
33 SPARE SPARE SPARE P
34 Y 22.8 19.6 P
35 Y 28.4 19.2 P
36 Y 28 20.4 P
37 Y 31.6 20.8 P
38 Y 29.2 19.6 P
39 Y 29.2 19.2 P
40 Y 28.8 19.6 P
41 Y 28.4 18.4 P
42 SPARE SPARE SPARE P
43 Y 29.2 19.6 P
44 Y 29.2 19.6 P
45 Y 29.2 19.6 P
46 Y 29.2 19.2 P
47 Y 29.2 24.8 P
48 Y 29.2 19.2 P
49 Y 22.8 17.6 P
50 SPARE SPARE SPARE P
51 SPARE SPARE SPARE P
52 Y 22.8 12.8 P
53 Y 28.8 18.8 P
54 Y 29.2 19.2 P
55 Y 28 18.4 P
56 Y 28.8 18.8 P
57 Y 29.2 19.6 P
58 3 Phase 3 Phase 3 Phase P
59 3 Phase 3 Phase 3 Phase P
60 3 Phase 3 Phase 3 Phase P
Power DB B 61 Y 27.2 18 P
62 Y 26.8 16.4 P
63 Y 22.8 17.6 P
64 Y 22.8 12.8 P
65 Y 31.6 19.6 P
66 Y 22.8 12.8 P
67 Y 22.8 18.4 P
68 Y 28 18 P
69 Y 27.2 18.4 P
70 Y 28.4 12.8 P
71 Y 22.8 18 P
72 Y 28.4 18.4 P
73 Y 26.8 18.8 P
74 Y 28.4 18 P
75 Y 26.8 18.4 P
76 Y 25.6 12.8 P
77 3 Phase 3 Phase 3 Phase P
78 3 Phase 3 Phase 3 Phase P
79 Y 33.4 33.4 P
80 Y 34.4 34.5 P
81 Y 34.4 34.3 P
82 3 Phase 3 Phase 3 Phase P
83 Y 29.2 19.2 P
84 Y 29.2 19.6 P
85 Y 29.2 19.2 P
86 Y 29.2 19.6 P
87 Y 29.2 19.2 P
88 Y 28.4 18.8 P
89 Y 29.2 19.2 P
90 Y 29.2 19.2 P
91 Y 22.8 12.8 P
92 Y 29.2 19.6 P
93 SPARE SPARE SPARE P
94 Y 28.4 18 P
95 Y 27.2 18 P
96 SPARE SPARE SPARE P
97 Y 28 22.4 P
98 Y 28 18 P
99 Y 22.8 12.8 P
100 Y 22.8 18.8 P
101 Y 29.2 18.8 P
102 Y 28.8 19.6 P
103 Y 26.4 12.8 P
104 Y 28 17.6 P
105 Y 24.8 16 P
106 Y 28.4 19.6 P
107 Y 22.8 19.2 P
108 Y 29.2 19.6 P
109 Y 29.4 19.6 P
110 Y 22.8 12.8 P
111 Y 29.2 18.4 P
112 Y 28.4 19.2 P
113 Y 29.2 19.6 P
114 Y 22.8 12.8 P
115 Y 26.6 18 P
116 Y 22.8 12.8 P
117 Y 29.2 19.6 P
118 Y 29.2 19.2 P
119 Y 29.2 19.6 P
120 Y 29.2 19.2 P
121 Y 29.2 19.6 P
122 Y 29.2 19.2 P
123 Y 29.2 19.6 P
124 Y 29.2 18.8 P
125 Y 29.2 19.6 P
126 Y 29.2 19.2 P
127 Y 29.2 19.6 P
128 SPARE SPARE SPARE P
129 SPARE SPARE SPARE P
130 SPARE SPARE SPARE P
131 SPARE SPARE SPARE P
132 SPARE SPARE SPARE P
MSB - Roller Door 3PM - 21 Y 21 21 P
3PM - 23 Y 23 23 P
R25 Y 19.6 9.6 P
W27 Y 20 10.8 P
Roller Door B29 Y 20.8 10.8 P
Roller Door 3PM - 22 Y 20.8 10.8 P
R24 Y 8 18.4 P
W26 Y 12.8 22.4 P
B28 Y 12.8 18.8 P
Roller Door 30 SPARE SPARE SPARE P
Office A.C 19 Y 24.8 15.2 P
THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
  • Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB A 3 S Y Y Y P
5 S Y Y Y P
7 S Y Y Y P
9 S Y Y Y P
10 S Y Y Y P
13 S Y Y Y P
14 S Y Y Y P
15 S Y Y Y P
16 S Y Y Y P
17 S Y Y Y P
18 S Y Y Y P
22 S Y Y Y P
25 S Y Y Y P
26 S Y Y Y P
27 S Y Y Y P
29 S Y Y Y P
31 S Y Y Y P
34 S Y Y Y P
35 S Y Y Y P
38 S Y Y Y P
39 S Y Y Y P
40 S Y Y Y P
41 S Y Y Y P
42 S Y Y Y P
43 S Y Y Y P
44 S Y Y Y P
45 S Y Y Y P
46 S Y Y Y P
47 S Y Y Y P
48 S Y Y Y P
49 S Y Y Y P
51 S Y Y Y P
54 S Y Y Y P
55 S Y Y Y P
HTML Block
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB A 1 Y Y Y P
2 Y Y Y P
4 Y Y Y P
6 Y Y Y P
8 Y Y Y P
11 Y Y Y P
12 Y Y Y P
19 Y Y Y P
20 Y Y Y P
21 Y Y Y P
23 Y Y Y P
24 Y Y Y P
27 Y Y Y P
30 Y Y Y P
32 Y Y Y P
33 Y Y Y P
36 Y Y Y P
37 Y Y Y P
50 Y Y Y P
52 Y Y Y P
53 Y Y Y P
56 Y Y Y P
57 Y Y Y P
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Check with Store Manager to ensure there are no other issues
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auYes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten) Existing (YorN)
150W LED Hibay Suspended Y
35W LED Batten Y
LED Track Lights Y
LED Strip Y
Are there any Warranty items needing to be repaired?Yes
WARRANTY
Defect Item Location of Item (on premises) Quantity Details of fault/problem Manufacturer Part Number Repaired on Site Comments
Track Spotlights Shopfloor 11 Not working StudioAll - N To be repaired under warranty Job #50F0027/0029
Geotag photo(s)
  • Have you sent the Geotag photo(s) to maintenance@sturdie.com.au, referring to the Store Location in the email, e.g. Canberra City?
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
Site Logbook Folder Office 1 Missing Y N N A new Site Logbook folder will be delivered to the site.
Site Status SelectorStore now fully compliant
Next Test Due in 6 months08/02/2025