| Partner Name | Sturdie Trade Services |
|---|
| State | VIC |
|---|
| Date of Visit | 12/09/2024 |
|---|
| Technician's Name | Amaz Tari |
|---|
| Which Company are you working for? | Sturdie Trade Services |
|---|
| Sturdie Job Number | 50F0017/0350 |
|---|
| Email | Email hidden; Javascript is required. |
|---|
| The Good Guys Site in VIC | chadstone_t6 |
|---|
|
|
|---|
| Location Name | Chadstone T6 |
|---|
| |
|---|
| HTML Block |
|
|---|
| Test Period | Biennial Test (once every two years) |
|---|
| Push Button Test | - Carry out push button test for correct operation
|
|---|
| Carry out push button test for correct operation | |
|---|
| HTML Block |
|
|---|
| Carry out test with RCD Tester | Carry out push button test and record the results below. |
|---|
| RCD Details (Biennial) | | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
0 Degrees |
180 Degrees |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
| DB - Tenancy 6 |
1 |
Y |
18 |
28 |
P |
|
|
|
3 |
Y |
18 |
26 |
P |
|
|
|
5 |
Y |
18 |
28 |
P |
|
|
|
7 |
Y |
15 |
24 |
P |
|
|
|
8 |
Y |
20 |
30 |
P |
|
|
|
9 |
Y |
19 |
29 |
P |
|
|
|
10 |
Y |
20 |
29 |
P |
|
|
|
11 |
Y |
18 |
26 |
P |
|
|
|
12 |
Y |
19 |
29 |
P |
|
|
|
13 |
Y |
21 |
31 |
P |
|
|
|
14 |
Y |
19 |
29 |
P |
|
|
|
15 |
Y |
28 |
18 |
P |
|
|
|
16 |
Y |
20 |
29 |
P |
|
|
|
17 |
Y |
30 |
19 |
P |
|
|
|
18 |
Y |
20 |
30 |
P |
|
|
|
19 |
Y |
20 |
30 |
P |
|
|
|
20 |
Y |
20 |
29 |
P |
|
|
|
21 |
Y |
18 |
28 |
P |
|
|
|
22 |
Y |
19 |
29 |
P |
|
|
|
23 |
Y |
28 |
18 |
P |
|
|
|
24 |
Y |
20 |
30 |
P |
|
|
|
25 |
Y |
19 |
28 |
P |
|
|
|
26 |
Y |
20 |
30 |
P |
|
|
|
27 |
Y |
18 |
28 |
P |
|
|
|
28 |
Y |
20 |
30 |
P |
|
|
|
29 |
Y |
15 |
27 |
P |
|
|
|
30 |
Y |
20 |
30 |
P |
|
|
|
31 |
Y |
106 |
32 |
P |
|
|
|
32 |
Y |
22 |
30 |
P |
|
|
|
33 |
Y |
18 |
28 |
P |
|
|
|
34 |
Y |
19 |
29 |
P |
|
|
|
35 |
Y |
18 |
28 |
P |
|
|
|
36 |
Y |
25 |
35 |
P |
|
|
|
37 |
Y |
14 |
23 |
P |
|
|
|
38 |
Y |
37 |
47 |
P |
|
|
|
39 |
Y |
16 |
24 |
P |
|
|
|
40 |
Y |
18 |
28 |
P |
|
|
|
41 |
Y |
18 |
25 |
P |
|
|
|
42 |
Y |
18 |
28 |
P |
|
|
|
43 |
Y |
28 |
18 |
P |
|
|
|
44 |
Y |
19 |
28 |
P |
|
|
|
45 |
Y |
18 |
28 |
P |
|
|
|
46 |
Y |
18 |
28 |
P |
|
|
|
47 |
Y |
58 |
28 |
P |
|
|
|
48 |
Y |
18 |
28 |
P |
|
|
|
49 |
Y |
24 |
14 |
P |
|
|
|
50 |
Y |
28 |
18 |
P |
|
|
|
51 |
Y |
42 |
32 |
P |
|
|
|
52 |
Y |
28 |
18 |
P |
|
|
|
53 |
Y |
24 |
15 |
P |
|
|
|
54 |
Y |
28 |
17 |
P |
|
|
|
55 |
Y |
33 |
24 |
P |
|
|
|
57 |
Y |
71 |
58 |
P |
|
|
|
59 |
Y |
27 |
81 |
P |
|
|
|
61 |
Y |
22 |
12 |
P |
|
|
|
63 |
Y |
23 |
13 |
P |
|
|
|
65 |
Y |
23 |
14 |
P |
|
|
|
67 |
Y |
42 |
31 |
P |
|
|
|
68 |
Y |
28 |
18 |
P |
|
|
|
69 |
Y |
32 |
22 |
P |
|
|
|
71 |
Y |
28 |
18 |
P |
|
|
|
72 |
Y |
25 |
17 |
P |
|
|
|
73 |
Y |
34 |
67 |
P |
|
|
|
75 |
Y |
28 |
18 |
P |
|
|
|
77 |
Y |
28 |
18 |
P |
|
|
|
79 |
N |
28 |
18 |
F |
Failed Trip Test |
Y |
|
81 |
Y |
21 |
18 |
P |
|
|
|
83 |
Y |
28 |
18 |
P |
|
|
|
85 |
Y |
28 |
18 |
P |
|
|
|
87 |
Y |
28 |
18 |
P |
|
|
|
94 |
Y |
20 |
30 |
P |
|
|
|
|---|
| THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
|---|
| SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
|---|
| Timers | - Check timers for correct operation and timing
|
|---|
| Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
|---|
| HTML Block |
|
|---|
| HTML Block |
|
|---|
| SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
|---|
| General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
|---|
| HTML Block |
|
|---|
| General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
|---|
| HTML Block |
|
|---|
| Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
|---|
| Lighting Report | | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
| LED panel lights |
Y |
| Hi bays |
Y |
| LED batten |
Y |
| LED linkable |
Y |
|
|---|
| Are there any Warranty items needing to be repaired? | No |
|---|
| LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
| RCBO No. 79 |
DB Tenancy 6 |
1 |
Failed Trip Test |
Y |
N |
N |
|
| 12W Vibe LED Linkable |
Fisher and Paykel ovens |
1 |
Failed to illuminate |
Y |
N |
N |
|
| LED Driver |
Bosch Washers |
1 |
Faulty |
Y |
N |
N |
|
| Signage |
Bosch Washers |
1 |
Failed to illuminate |
Y |
N |
N |
Signage was unplugged. Dis-assembled stand and connected |
|
|---|
| Site Status Selector | Store now fully compliant |
|---|
| Next Test Due in 6 months | 12/03/2025 |
|---|
| |
|---|
| |