Partner NameBuilt Services
StateSA
Date of Visit13/09/2024
Technician's NameGlenn Rowe
Which Company are you working for?Sturdie Trade Services
Sturdie Job Number50F0021/0065
EmailEmail hidden; Javascript is required.
The Good Guys Site in SAhectorville

Location NameHectorville
HTML Block
Test PeriodBiennial Test (once every two years)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

RCD Details (Biennial)
Distribution Board No. Circuit No. Push Button (YorN) 0 Degrees 180 Degrees Pass / Fail (PorF) Fault? Repaired on Site (YorN)
DB.C W1 Y 030 029 P
B1 Y 033 034 P
R2 Y 067 031 P
W2 Y 034 037 P
B2 Y 028 029 P
R3 Y 030 030 P
W3 Y 048 048 P
B3 Y 046 048 P
R4 Y 050 049 P
W4 Y 031 032 P
B4 Y 050 034 P
R5 Y 020 027 P
W5 Y 075 036 P
B5 Y 033 032 P
R6 Y 029 029 P
W6 Y 041 031 P
B6 Y 031 032 P
R7 Y 029 041 P
W7 Y 034 036 P
B7 Y 031 030 P
R8 Y 026 027 P
W8 Y 031 032 P
B8 Y 030 030 P
R9 Y 043 076 P
W9 Y 030 039 P
B9 Y 036 036 P
R10 Y 032 030 P
W10 Y 051 053 P
B10 Y 024 019 P
R11 Y 090 044 P
W11 Y 031 043 P
B11 Y 029 039 P
W12 Y 023 018 P
W18 Y 033 032 P
B18 Y 033 034 P
R19 Y 030 032 P
W19 Y 033 032 P
B19 Y 032 031 P
R20 Y 033 032 P
W20 Y 041 043 P
B20 Y 032 032 P
R21 Y 032 032 P
W21 Y 032 030 P
B21 Y 031 031 P
R22 Y 030 032 P
W22 Y 030 030 P
B22 Y 031 030 P
R23 Y 034 041 P
W23 Y 032 033 P
B23 Y 032 033 P
R24 Y 032 030 P
W24 Y 042 044 P
B24 Y 042 041 P
R25 Y 036 036 P
B25 Y 127 075 P
B26 Y 032 042 P
R27 Y 044 026 P
DB.A W9 Y 029 040 P
B9 Y 030 032 P
R10 Y 039 039 P
W10 Y 031 030 P
B10 Y 032 032 P
W14 Y 043 043 P
B14 Y 038 038 P
R15 Y 039 048 P
W15 Y 045 052 P
B15 Y 030 059 P
R16 Y 031 037 P
W16 Y 040 046 P
B16 Y 045 047 P
R17 Y 030 029 P
W17 Y 037 046 P
B17 Y 031 030 P
R18 Y 031 039 P
W18 Y 033 042 P
B18 Y 030 030 P
R19 Y 043 032 P
W19 Y 029 040 P
B19 Y 029 040 P
R25 Y 042 032 P
W25 Y 034 030 P
B25 Y 031 031 P
B26 Y 032 031 P
R29 Y 029 021 P
DB.B B1 Y 034 033 P
R2 Y 029 030 P
W2 Y 098 039 P
B2 Y 208 153 P
R3 Y 034 032 P
W3 Y 030 033 P
B3 Y 034 051 P
R4 Y 030 042 P
W4 Y 029 029 P
B4 Y 031 030 P
R5 Y 038 078 P
W5 Y 030 032 P
B5 Y 030 039 P
R6 Y 030 038 P
W6 Y 036 038 P
B6 Y 031 034 P
R7 Y 030 030 P
W7 Y 030 029 P
B7 Y 030 031 P
R8 Y 029 030 P
W8 Y 029 029 P
B8 Y 038 032 P
W9 Y 063 071 P
B9 Y 031 029 P
THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
  • Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB 1 S Y Y Y P
2 S Y Y Y P
3 S Y Y Y P
4 S Y Y Y P
5 S Y Y Y P
6 S Y Y Y P
7 R Y Y Y P
8 S Y Y Y P
9 S Y Y Y P
10 S Y Y Y P
11 S Y Y Y P
12 S (BATTEN) Y Y Y P
13 R Y Y Y P
14 R Y Y Y P
15 R Y Y Y P
HTML Block
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB 1 Y Y Y P
2 Y Y Y P
3 Y Y Y P
4 Y Y Y P
5 Y Y Y P
6 Y Y Y P
7 Y Y Y P
8 Y Y Y P
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Check with Store Manager to ensure there are no other issues
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auYes
Are there any Warranty items needing to be repaired?No
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
-
Site Status SelectorStore now fully compliant
Next Test Due in 6 months13/03/2025