Partner NameBuilt Services
StateNSW
Date of Visit17/09/2024
Technician's NameMitch Cutts
Which Company are you working for?Sturdie Trade Services
Sturdie Job Number50F0015/0421
EmailEmail hidden; Javascript is required.
The Good Guys Site in NSWerina

Location NameErina Fair
HTML Block
Test PeriodBiennial Test (once every two years)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

RCD Details (Biennial)
Distribution Board No. Circuit No. Push Button (YorN) 0 Degrees 180 Degrees Pass / Fail (PorF) Fault? Repaired on Site (YorN)
DB1 1 Y 29 18 P
3 Y 29 18 P
5 Y 29 17 P
7 Y 28 20 P
8 Y 28 19 P
9 Y 27 17 F Failed Trip time test Y
10 Y 30 17 P
11 Y 29 19 P
12 Y 29 18 P
13 Y 27 19 P
14 Y 27 18 P
15 Y 28 18 P
16 Y 30 17 P
17 Y 30 19 P
18 Y 29 20 P
19 Y 28 17 P
20 Y 28 18 P
21 Y 27 19 F Failed Trip time test Y
22 Y 29 20 P
23 Y 28 19 P
24 Y 28 17 P
25 Y 30 18 P
26 Y 30 18 P
27 Y 29 19 F Failed Trip time test Y
28 Y 29 20 P
29 Y 29 18 P
30 Y 30 17 P
31 Y 27 18 P
32 Y 29 17 P
33 Y 27 19 P
34 Y 28 19 P
35 Y 28 20 P
36 Y 30 20 P
37 Y 27 18 P
38 Y 28 17 P
39 Y 29 17 P
40 Y 29 19 P
41 Y 29 19 P
42 Y 29 18 P
43 Y 28 20 P
44 Y 29 17 P
48 Y 27 18 P
52 Y 30 20 P
DB2 1 Y 24 17 P
2 Y 26 16 P
3 Y 28 20 P
4 Y 28 19 P
5 Y 30 18 P
6 Y 27 18 P
7 Y 29 17 P
8 Y 25 19 P
9 Y 27 17 P
10 Y 27 17 P
11 Y 27 16 P
12 Y 29 18 P
13 Y 28 20 P
14 Y 28 20 P
15 Y 26 16 P
16 Y 24 19 P
17 Y 25 19 P
18 Y 27 18 F Failed Trip time test Y
THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
  • Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB2 4 S Y Y Y P
DB2 5 S Y Y Y P
DB2 6 S Y Y Y P
DB1 7 S Y Y Y P
DB1 8 S Y Y Y P
DB1 9 S Y Y Y P
DB1 10 S Y Y Y P
DB1 11 S Y Y Y P
DB1 13 S Y Y Y P
DB1 14 S Y Y Y P
DB1 17 R Y Y Y P
DB1 18 R Y Y Y P
DB1 19 R Y Y Y P
DB1 20 R Y Y Y P
DB1 21 R Y Y Y P
DB1 22 R Y Y Y P
DB1 23 R Y Y Y P
DB1 24 S Y Y Y P Not linked to emergency test station N/A N/A
DB1 25 S Y Y Y P Not linked to emergency test station N/A N/A
HTML Block
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB2 1 Y Y Y P
DB2 2 Y Y Y P
DB2 3 Y Y Y P
DB1 15 Y Y Y P
DB1 16 Y Y Y P
DB1 26 Y Y Y P
DB1 27 Y Y Y P
DB1 28 Y Y Y P
DB1 29 Y Y Y P Not linked to emergency test station N/A N/A
DB1 30 Y Y Y P
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Check with Store Manager to ensure there are no other issues
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auYes
Are there any Warranty items needing to be repaired?No
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
RCBO 9 Switchboard 1 Failed Trip time test Y N N
RCBO18 Switchboard 1 Failed Trip time test Y N N
RCBO 21 Switchboard 1 Failed Trip time test Y N N
RCBO 27 Switchboard 1 Failed Trip time test Y N N
Switchboard Locks DB1 3 Broken Y N N
Switchboard Locks DB2 3 Broken Y N N
Site Status SelectorStore now fully compliant
Next Test Due in 6 months17/03/2025