Partner Name | Built Electrical QLD |
---|
State | QLD |
---|
Date of Visit | 25/09/2024 |
---|
Technician's Name | Gregory Jones (169766) |
---|
Which Company are you working for? | Sturdie Trade Services |
---|
Sturdie Job Number | 50F0019/0256 |
---|
Email | Email hidden; Javascript is required. |
---|
The Good Guys Site in QLD | ipswich |
---|
|
|
---|
Location Name | Ipswich |
---|
| |
---|
HTML Block |
|
---|
Test Period | Biennial Test (once every two years) |
---|
Push Button Test | - Carry out push button test for correct operation
|
---|
Carry out push button test for correct operation | |
---|
HTML Block |
|
---|
Carry out test with RCD Tester | Carry out push button test and record the results below. |
---|
RCD Details (Biennial) | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
0 Degrees |
180 Degrees |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
DB1 |
1-11 |
Y |
28 |
18 |
P |
|
|
|
13-21 |
Y |
120 |
120 |
P |
|
|
|
29 |
Y |
28 |
18 |
P |
|
|
|
31 |
Y |
28 |
18 |
P |
|
|
|
37 |
Y |
28 |
18 |
P |
|
|
DB2 |
6 |
Y |
28 |
19 |
P |
|
|
|
8 |
Y |
28 |
14 |
P |
|
|
|
10 |
Y |
28 |
18 |
P |
|
|
|
12 |
Y |
28 |
18 |
P |
|
|
|
14 |
Y |
29 |
12 |
P |
|
|
|
16 |
Y |
27 |
12 |
P |
|
|
|
18 |
Y |
28 |
12 |
P |
|
|
|
33 |
Y |
28 |
18 |
P |
|
|
|
35 |
Y |
28 |
19 |
P |
|
|
|
37 |
Y |
28 |
12 |
P |
|
|
|
38 |
Y |
30 |
20 |
P |
|
|
|
39 |
Y |
28 |
14 |
P |
|
|
|
40 |
Y |
38 |
21 |
P |
|
|
|
41 |
Y |
23 |
22 |
P |
|
|
|
42 |
Y |
28 |
27 |
P |
|
|
|
43 |
Y |
28 |
18 |
P |
|
|
|
44 |
Y |
32 |
22 |
P |
|
|
|
45 |
Y |
32 |
22 |
P |
|
|
|
46 |
Y |
43 |
23 |
P |
|
|
|
47 |
Y |
32 |
22 |
P |
|
|
|
48 |
Y |
32 |
22 |
P |
|
|
|
49 |
Y |
32 |
22 |
P |
|
|
|
50 |
Y |
33 |
23 |
P |
|
|
|
51 |
Y |
32 |
23 |
P |
|
|
|
52 |
Y |
23 |
22 |
P |
|
|
|
53 |
Y |
23 |
22 |
P |
|
|
|
54 |
Y |
34 |
22 |
P |
|
|
|
55 |
Y |
33 |
23 |
P |
|
|
|
56 |
Y |
23 |
22 |
P |
|
|
|
57 |
Y |
23 |
33 |
P |
|
|
|
58 |
Y |
23 |
22 |
P |
|
|
|
59 |
Y |
35 |
19 |
P |
|
|
|
60 |
Y |
32 |
23 |
P |
|
|
|
61 |
Y |
32 |
21 |
P |
|
|
|
62 |
Y |
43 |
22 |
P |
|
|
|
63 |
Y |
23 |
22 |
P |
|
|
|
64 |
Y |
28 |
16 |
P |
|
|
|
65 |
Y |
32 |
20 |
P |
|
|
|
66 |
Y |
32 |
21 |
P |
|
|
|
67 |
Y |
32 |
18 |
P |
|
|
|
68 |
Y |
32 |
21 |
P |
|
|
|
70 |
Y |
23 |
21 |
P |
|
|
|
72 |
Y |
31 |
22 |
P |
|
|
|
73 |
Y |
34 |
18 |
P |
|
|
|
74 |
Y |
43 |
19 |
P |
|
|
|
75 |
Y |
32 |
22 |
P |
|
|
|
76 |
Y |
23 |
43 |
P |
|
|
|
77 |
Y |
36 |
25 |
P |
|
|
|
79 |
Y |
34 |
21 |
P |
|
|
|
81 |
Y |
34 |
21 |
P |
|
|
|
83 |
Y |
32 |
23 |
P |
|
|
DB3 |
6 |
Y |
36 |
21 |
P |
|
|
|
37 |
Y |
43 |
22 |
P |
|
|
|
39 |
Y |
23 |
19 |
P |
|
|
|
45 |
Y |
43 |
22 |
P |
|
|
|
47 |
Y |
34 |
22 |
P |
|
|
|
49 |
Y |
34 |
21 |
P |
|
|
|
51 |
Y |
35 |
22 |
P |
|
|
|
53 |
Y |
32 |
32 |
P |
|
|
|
55 |
Y |
34 |
22 |
P |
|
|
|
57 |
Y |
43 |
22 |
P |
|
|
|
59 |
Y |
33 |
21 |
P |
|
|
|
61 |
Y |
32 |
21 |
P |
|
|
|
63 |
Y |
33 |
21 |
P |
|
|
|
65 |
Y |
34 |
21 |
P |
|
|
|
67 |
Y |
23 |
16 |
P |
|
|
|
69 |
Y |
33 |
22 |
P |
|
|
|
70 |
Y |
35 |
22 |
P |
|
|
|
71 |
Y |
23 |
21 |
P |
|
|
|
84 |
Y |
32 |
23 |
P |
|
|
|
---|
THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
---|
SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
- Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
|
---|
Timers | - Check timers for correct operation and timing
|
---|
Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
---|
HTML Block |
|
---|
EMERGENCY LIGHTS | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB 1 |
1 |
S - 2 x 36w (4ft batten |
Y |
Y |
Y |
P |
|
|
|
|
2 |
S - 2 x 36w (4ft batten) |
Y |
Y |
Y |
P |
|
|
|
|
3 |
S |
Y |
Y |
Y |
P |
|
|
|
|
4 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 3 |
5 |
R |
Y |
Y |
Y |
P |
|
|
|
|
6 |
S |
Y |
Y |
Y |
P |
|
|
|
|
7 |
S |
Y |
Y |
Y |
P |
|
|
|
|
8 |
S |
Y |
Y |
Y |
P |
|
|
|
|
9 |
S |
Y |
Y |
Y |
P |
|
|
|
|
10 |
S |
Y |
Y |
Y |
P |
|
|
|
|
11 |
S |
Y |
Y |
Y |
P |
|
|
|
|
12 |
S |
Y |
Y |
Y |
P |
|
|
|
|
13 |
R |
Y |
Y |
Y |
P |
|
|
|
|
14 |
R |
Y |
Y |
Y |
P |
|
|
|
|
15 |
S |
Y |
Y |
Y |
P |
|
|
|
|
16 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 2 |
17 |
S |
Y |
Y |
Y |
P |
|
|
|
|
18 |
S |
Y |
Y |
Y |
P |
|
|
|
|
19 |
R |
Y |
Y |
Y |
P |
|
|
|
|
20 |
R |
Y |
Y |
Y |
P |
|
|
|
|
21 |
S |
Y |
Y |
Y |
P |
|
|
|
|
22 |
R |
Y |
Y |
Y |
P |
|
|
|
|
---|
HTML Block |
|
---|
EXIT LIGHTS | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB 1 |
1 |
Y |
Y |
Y |
P |
|
|
|
DB 3 |
2 (40m) |
Y |
Y |
Y |
P |
|
|
|
|
3 |
Y |
Y |
Y |
P |
|
|
|
|
4 |
Y |
Y |
Y |
P |
|
|
|
|
5 (40m) |
Y |
Y |
Y |
P |
|
|
|
|
6 |
N |
N |
N |
F |
Not illuminated |
Y |
N |
|
7 |
Y |
Y |
Y |
P |
|
|
|
DB 2 |
8 |
Y |
Y |
Y |
P |
|
|
|
|
9 |
Y |
Y |
Y |
P |
|
|
|
|
10 |
N |
N |
N |
F |
Not illuminated |
Y |
N |
|
---|
SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
---|
General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
---|
HTML Block |
|
---|
General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
---|
HTML Block |
|
---|
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
---|
Lighting Report | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
LED Hi-bays |
Y |
LED Panels |
Y |
2 x 36W Diffused Battens |
Y |
2 x 36W Caged Battens |
Y |
LED Diffused Lighting Batten |
Y |
LED Downlights 70mm Cut Out |
Y |
LED Downlights 90mm |
Y |
|
---|
Are there any Warranty items needing to be repaired? | No |
---|
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
Exit Light |
Stairwell |
1 |
Not Illuminated |
Y |
N |
N |
|
Exit Light |
Fridges |
1 |
Not Illuminated |
Y |
N |
N |
|
Emergency Lighting Plan |
Office |
1 |
Old / Incorrect |
Y |
N |
N |
Quote Recommendation Added To Fortnightly Repairs List |
|
---|
Site Status Selector | QLD - Maintenance has been completed in accordance to ASS2293.2 and QDC MP6.1. - Store now fully compliant |
---|
Next Test Due in 6 months | 25/03/2025 |
---|
| |
---|
| |