Partner NameBuilt Services
StateNSW
Date of Visit26/08/2024
Technician's NameTony Refalo
Which Company are you working for?Sturdie Trade Services
Sturdie Job Number50F0015/0372
EmailEmail hidden; Javascript is required.
The Good Guys Site in NSWtamworth

Location NameTamworth
HTML Block
Test PeriodBiennial Test (once every two years)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

RCD Details (Biennial)
Distribution Board No. Circuit No. Push Button (YorN) 0 Degrees 180 Degrees Pass / Fail (PorF) Fault? Repaired on Site (YorN)
DB2 1 Y 03 03 P
2 Y 037 037 P
3 Y 038 039 P
4 Y 038 038 P
5 Y 037 037 P
6 Y 028 029 P
7 Y 034 036 P
8 Y 030 039 P
9 Y 031 029 P
10 Y 038 038 P
11 Y 040 048 P
12 Y 029 028 P
13 Y 038 038 P
15 Y 039 039 P
16 Y 028 029 P
17 Y 037 038 P
18 Y 039 039 P
21 Y 019 028 P
22 Y 015 09 P
23 Y 015 025 P
24 Y 020 030 P
DB1 7 Y 008 018 P
8 Y 010 0019 P
9 Y 008 018 P
10 Y 008 019 P
11 Y 008 009 P
12 Y 009 019 P
13 Y 012 022 P
14 Y 009 019 P
15 Y 009 018 P
16 Y 008 018 P
17 Y 01 019 P
18 Y 008 019 P
19 Y 009 018 P
20 Y 009 018 P
21 Y 009 019 P
22 Y 008 017 P
23 Y 008 019 P
24 Y 016 026 P
25 Y 026 020 P
26 Y 013 022 P
33 Y 009 019 P
34 Y 009 019 P
35 Y 009 018 P
36 Y 009 018 P
37 Y 009 009 P
38 Y 009 019 P
39 Y 019 009 P
40 Y 012 021 P
41 Y 009 018 P
43 Y 018 009 P
44 Y 007 017 P
45 Y 028 038 P
46 Y 029 039 P
47 Y 008 018 P
1/2 26 Y 008 019 P
27 Y 009 019 P
29 Y 008 019 P
THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
  • Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB2 3 S Y Y Y P
4 S Y Y Y P
5 S Y Y Y P
6 S Y Y Y P
7 S Y Y Y P
8 S Y Y Y P
9 S Y Y Y P
10 S Y Y Y P
11 S Y Y Y P
12 S Y Y Y P
13 S Y Y Y P
14 S Y Y Y P
15 R Y Y Y P
17 R Y Y Y P
20 R Y Y Y P
21 S Y Y Y P
22 S Y Y Y P
23 S Y Y Y P
24 S Y Y Y P
HTML Block
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB1 2 Y Y Y P
16 Y Y Y P
18 Y Y Y P
19 Y Y Y P
21 Y Y Y P
25 Y Y Y P
26 Y Y Y P
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Check with Store Manager to ensure there are no other issues
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auYes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten) Existing (YorN)
LED Panel Y
LED HiBay Y
Are there any Warranty items needing to be repaired?No
Site Status SelectorStore now fully compliant
Next Test Due in 6 months26/02/2025