Partner Name | Built Services |
---|
State | NSW |
---|
Date of Visit | 22/10/2024 |
---|
Technician's Name | James Graham |
---|
Which Company are you working for? | Sturdie Trade Services |
---|
Sturdie Job Number | 50F0015/0442 |
---|
Email | Email hidden; Javascript is required. |
---|
The Good Guys Site in NSW | coffs_harbour |
---|
|
|
---|
Location Name | Coffs Harbour |
---|
| |
---|
HTML Block |
|
---|
Test Period | Biennial Test (once every two years) |
---|
Push Button Test | - Carry out push button test for correct operation
|
---|
Carry out push button test for correct operation | |
---|
HTML Block |
|
---|
Carry out test with RCD Tester | Carry out push button test and record the results below. |
---|
RCD Details (Biennial) | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
0 Degrees |
180 Degrees |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
DB1 |
14 |
Y |
31.8 |
34.1 |
P |
|
|
|
16 |
Y |
32.5 |
29.8 |
P |
|
|
|
18 |
Y |
33.1 |
29.9 |
P |
|
|
|
44 |
Y |
39.8 |
40.0 |
P |
|
|
|
46 |
Y |
39.8 |
40.0 |
P |
|
|
|
48 |
Y |
39.9 |
40.0 |
P |
|
|
|
50 |
Y |
39.9 |
40.0 |
P |
|
|
|
52 |
Y |
39.8 |
39.9 |
P |
|
|
|
54 |
Y |
39.9 |
40.0 |
P |
|
|
|
56 |
Y |
50.6 |
50.9 |
P |
|
|
|
58 |
Y |
39.9 |
40.0 |
P |
|
|
|
60 |
Y |
50.9 |
48.8 |
P |
|
|
|
62 |
Y |
39.8 |
40.0 |
P |
|
|
|
64 |
Y |
39.8 |
40.0 |
P |
|
|
|
66 |
Y |
39.9 |
40.0 |
P |
|
|
|
67 |
Y |
30.8 |
40.6 |
P |
|
|
|
68 |
Y |
39.8 |
40.0 |
P |
|
|
|
70 |
Y |
39.9 |
40.0 |
P |
|
|
|
72 |
Y |
30.6 |
40.3 |
P |
|
|
DB2 |
2 |
Y |
39.8 |
39.9 |
P |
|
|
|
4 |
Y |
39.8 |
50.6 |
P |
|
|
|
6 |
Y |
39.9 |
39.9 |
P |
|
|
|
8 |
Y |
39.8 |
39.9 |
P |
|
|
|
12 |
Y |
39.8 |
39.9 |
P |
|
|
|
16 |
Y |
49.3 |
44.0 |
P |
|
|
|
18 |
Y |
50.0 |
50.1 |
P |
|
|
|
22 |
Y |
54.6 |
55.1 |
P |
|
|
DB3 |
2 |
Y |
39.9 |
40.0 |
P |
|
|
|
4 |
Y |
40.0 |
40.0 |
P |
|
|
|
6 |
Y |
39.9 |
40.0 |
P |
|
|
|
8 |
Y |
39.9 |
40.0 |
P |
|
|
|
10 |
Y |
39.8 |
40.0 |
P |
|
|
|
12 |
Y |
39.9 |
40.0 |
P |
|
|
|
13 |
Y |
39.9 |
40.0 |
P |
|
|
|
14 |
Y |
39.8 |
40.0 |
P |
|
|
|
15 |
Y |
30.4 |
40.6 |
P |
|
|
|
16 |
Y |
30.1 |
40.3 |
P |
|
|
|
17 |
Y |
30.9 |
30.0 |
P |
|
|
|
18 |
Y |
39.9 |
40.0 |
P |
|
|
|
19 |
Y |
30.5 |
40.4 |
P |
|
|
|
20 |
Y |
39.9 |
40.0 |
P |
|
|
|
21 |
Y |
30.2 |
40.5 |
P |
|
|
|
22 |
Y |
39.8 |
40.0 |
P |
|
|
|
23 |
Y |
31.2 |
41.4 |
P |
|
|
|
24 |
Y |
39.9 |
39.9 |
P |
|
|
DB4 |
1 |
Y |
36.2 |
46.9 |
P |
|
|
|
2 |
Y |
39.2 |
46.5 |
P |
|
|
|
3 |
Y |
39.9 |
40.0 |
P |
|
|
|
4 |
Y |
39.8 |
39.9 |
P |
|
|
|
5 |
Y |
50.8 |
50.9 |
P |
|
|
|
6 |
Y |
39.8 |
39.9 |
P |
|
|
|
7 |
Y |
39.9 |
39.9 |
P |
|
|
|
8 |
Y |
39.9 |
39.9 |
P |
|
|
|
9 |
Y |
39.8 |
40.0 |
P |
|
|
|
10 |
Y |
39.8 |
39.9 |
P |
|
|
|
11 |
Y |
39.8 |
40.0 |
P |
|
|
|
12 |
Y |
31.6 |
41.3 |
P |
|
|
|
13 |
Y |
34.9 |
44.8 |
P |
|
|
|
14 |
Y |
31.8 |
41.8 |
P |
|
|
|
15 |
Y |
33.4 |
44.0 |
P |
|
|
|
16 |
Y |
39.9 |
39.9 |
P |
|
|
|
17 |
Y |
39.8 |
40.0 |
P |
|
|
|
18 |
Y |
39.9 |
39.9 |
P |
|
|
|
19 |
Y |
32.4 |
42.1 |
P |
|
|
|
20 |
Y |
33.2 |
24.5 |
P |
|
|
|
21 |
Y |
39.9 |
40.0 |
P |
|
|
|
22 |
Y |
39.9 |
40.0 |
P |
|
|
|
24 |
Y |
34.6 |
44.4 |
P |
|
|
|
26 |
Y |
30.0 |
29.9 |
P |
|
|
|
28 |
Y |
33.0 |
33.9 |
P |
|
|
|
27 |
Y |
33.6 |
43.7 |
P |
|
|
|
29 |
Y |
28.9 |
29.8 |
P |
|
|
|
30 |
Y |
32.6 |
42.5 |
P |
|
|
|
31 |
Y |
32.6 |
42.8 |
P |
|
|
|
32 |
Y |
29.6 |
39.6 |
P |
|
|
|
33 |
Y |
35.6 |
45.3 |
P |
|
|
|
34 |
Y |
22.8 |
45.5 |
P |
|
|
|
---|
THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
---|
SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
- Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
|
---|
Timers | - Check timers for correct operation and timing
|
---|
Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
---|
HTML Block |
|
---|
EMERGENCY LIGHTS | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB1 |
2 |
S |
Y |
Y |
Y |
P |
|
|
|
|
3 |
S |
Y |
Y |
Y |
P |
|
|
|
|
5 |
S |
Y |
Y |
Y |
P |
|
|
|
|
7 |
S |
Y |
Y |
Y |
P |
|
|
|
|
8 |
S |
Y |
Y |
Y |
P |
|
|
|
|
9 |
S |
Y |
Y |
Y |
P |
|
|
|
|
10 |
S |
Y |
Y |
Y |
P |
|
|
|
|
12 |
S |
Y |
Y |
Y |
P |
|
|
|
|
13 |
S |
Y |
Y |
Y |
P |
|
|
|
|
17 |
S |
Y |
Y |
Y |
P |
|
|
|
DB2 |
18 |
R |
Y |
Y |
Y |
P |
|
|
|
|
20 |
R |
Y |
Y |
Y |
P |
|
|
|
|
21 |
R |
Y |
Y |
Y |
P |
|
|
|
|
22 |
R |
Y |
Y |
Y |
P |
|
|
|
|
23 |
R |
Y |
Y |
Y |
P |
|
|
|
|
25 |
R |
Y |
Y |
Y |
P |
|
|
|
|
---|
HTML Block |
|
---|
EXIT LIGHTS | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB1 |
1 |
Y |
Y |
Y |
P |
|
|
|
|
4 |
Y |
Y |
Y |
P |
|
|
|
|
6 |
Y |
Y |
Y |
P |
|
|
|
|
11 |
Y |
Y |
Y |
P |
|
|
|
|
14 |
Y |
Y |
Y |
P |
|
|
|
|
15 |
Y |
Y |
Y |
P |
|
|
|
|
16 |
Y |
Y |
Y |
P |
|
|
|
DB2 |
19 |
Y |
Y |
Y |
P |
|
|
|
|
24 |
Y |
Y |
Y |
P |
|
|
|
|
26 |
Y |
Y |
Y |
P |
|
|
|
|
---|
SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
---|
General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
---|
HTML Block |
|
---|
General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
---|
HTML Block |
|
---|
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
---|
Lighting Report | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
2x36w Lamps |
Y |
Hi Bays |
Y |
18W PL Lamp |
Y |
1x36W Lamps |
Y |
LED Down Lights |
Y |
1x18w Lamps |
Y |
2x18w Lamps |
Y |
|
---|
Are there any Warranty items needing to be repaired? | No |
---|
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
Strip Light |
Air Care Sign |
1 |
Faulty Driver |
Y |
N |
N |
|
Strip Light |
Fridges |
1 |
Faulty Driver |
Y |
N |
N |
|
Strip Light |
Bar Fridge |
1 |
Faulty Driver |
Y |
N |
N |
|
LED Hibay |
Shopfloor |
1 |
Faulty |
Y |
N |
N |
A scissor lift was required |
DB3 (19) |
Switchboard |
1 |
Tripping |
Y |
N |
N |
Added to fortnightly repairs list. |
|
---|
Site Status Selector | Store now fully compliant |
---|
Next Test Due in 6 months | 22/04/2025 |
---|
| |
---|
| |