Partner Name | Built Services |
---|
State | NSW |
---|
Date of Visit | 05/12/2024 |
---|
Technician's Name | Joshua Ryan |
---|
Which Company are you working for? | Sturdie Trade Services |
---|
Sturdie Job Number | 50F0015/0484 |
---|
Email | Email hidden; Javascript is required. |
---|
The Good Guys Site in NSW | wagga_wagga |
---|
|
|
---|
Location Name | Wagga Wagga |
---|
| |
---|
HTML Block |
|
---|
Test Period | Biennial Test (once every two years) |
---|
Push Button Test | - Carry out push button test for correct operation
|
---|
Carry out push button test for correct operation | |
---|
HTML Block |
|
---|
Carry out test with RCD Tester | Carry out push button test and record the results below. |
---|
RCD Details (Biennial) | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
0 Degrees |
180 Degrees |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
DB.1 |
34 |
Y |
14 |
11 |
P |
|
|
|
32 |
Y |
32 |
37 |
P |
|
|
|
36 |
Y |
45 |
46 |
P |
|
|
|
40 |
Y |
18 |
17 |
P |
|
|
|
42 |
Y |
37 |
11 |
P |
|
|
|
46 |
Y |
12 |
12 |
P |
|
|
|
26 |
Y |
21 |
20 |
P |
|
|
|
31 |
Y |
SPARE |
SPARE |
P |
|
|
|
24 |
Y |
18 |
19 |
P |
|
|
|
30 |
Y |
22 |
23 |
P |
|
|
|
38 |
Y |
SPARE |
SPARE |
P |
|
|
|
44 |
Y |
SPARE |
SPARE |
P |
|
|
|
48 |
Y |
SPARE |
SPARE |
P |
|
|
|
50 |
Y |
SPARE |
SPARE |
P |
|
|
DB.2 |
10 |
Y |
10 |
24 |
P |
|
|
|
12 |
Y |
24 |
19 |
P |
|
|
|
11 |
Y |
22 |
22 |
P |
|
|
|
27 |
Y |
16 |
15 |
P |
|
|
|
28 |
Y |
41 |
45 |
P |
|
|
|
13 |
Y |
9 |
9 |
P |
|
|
|
16 |
Y |
13 |
26 |
P |
|
|
|
2 |
Y |
14 |
22 |
P |
|
|
|
15 |
Y |
15 |
18 |
P |
|
|
|
9 |
Y |
19 |
23 |
P |
|
|
|
5 |
Y |
18 |
26 |
P |
|
|
|
4 |
Y |
14 |
22 |
P |
|
|
|
6 |
Y |
13 |
24 |
P |
|
|
|
7 |
Y |
25 |
24 |
P |
|
|
|
8 |
Y |
11 |
10 |
P |
|
|
|
3 |
Y |
17 |
20 |
P |
|
|
|
19 |
Y |
SPARE |
SPARE |
P |
|
|
|
21 |
Y |
SPARE |
SPARE |
P |
|
|
|
23 |
Y |
SPARE |
SPARE |
P |
|
|
|
25 |
Y |
SPARE |
SPARE |
P |
|
|
|
27 |
Y |
SPARE |
SPARE |
P |
|
|
|
29 |
Y |
SPARE |
SPARE |
P |
|
|
|
14 |
Y |
SPARE |
SPARE |
P |
|
|
|
18 |
Y |
SPARE |
SPARE |
P |
|
|
|
20 |
Y |
SPARE |
SPARE |
P |
|
|
|
22 |
Y |
SPARE |
SPARE |
P |
|
|
|
24 |
Y |
SPARE |
SPARE |
P |
|
|
|
26 |
Y |
SPARE |
SPARE |
P |
|
|
|
---|
THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
---|
SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
- Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
|
---|
Timers | - Check timers for correct operation and timing
|
---|
Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
---|
HTML Block |
|
---|
EMERGENCY LIGHTS | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB.1 |
1 |
S |
Y |
Y |
Y |
P |
|
|
|
|
2 |
S |
Y |
Y |
Y |
P |
|
|
|
|
3 |
S |
Y |
Y |
Y |
P |
|
|
|
|
4 |
S |
Y |
Y |
Y |
P |
|
|
|
|
5 |
S |
Y |
Y |
Y |
P |
|
|
|
|
6 |
S |
Y |
Y |
Y |
P |
|
|
|
|
7 |
S |
Y |
Y |
Y |
P |
|
|
|
|
8 |
S |
Y |
Y |
Y |
P |
|
|
|
|
9 |
S |
Y |
Y |
Y |
P |
|
|
|
|
10 |
S |
Y |
Y |
Y |
P |
|
|
|
|
11 |
S |
Y |
Y |
Y |
P |
|
|
|
|
12 |
S |
Y |
Y |
Y |
P |
|
|
|
|
13 |
S |
Y |
Y |
Y |
P |
|
|
|
|
---|
HTML Block |
|
---|
EXIT LIGHTS | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB.1 |
1 |
Y |
Y |
Y |
P |
|
|
|
|
2 |
Y |
Y |
Y |
P |
|
|
|
|
3 |
Y |
Y |
Y |
P |
|
|
|
|
4 |
Y |
Y |
Y |
P |
|
|
|
|
5 |
Y |
Y |
Y |
P |
|
|
|
|
6 |
Y |
Y |
Y |
P |
|
|
|
|
7 |
Y |
Y |
Y |
P |
|
|
|
|
---|
SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
---|
General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
---|
HTML Block |
|
---|
General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
---|
HTML Block |
|
---|
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
---|
Lighting Report | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
High Bay |
Y |
Fluoro Emergency Light |
Y |
LED Emergency Light |
Y |
Shop Fitters |
Y |
36W Diffused Batten |
Y |
2x36W Diffused Batten |
Y |
2x36W Wire Cage |
Y |
2x58W Wire Cage |
Y |
Bayonet Fitting |
Y |
36W Fluoro |
Y |
Double LED Display Light |
Y |
Twin Spotlight Emergency Light |
Y |
|
---|
Are there any Warranty items needing to be repaired? | No |
---|
Site Status Selector | Store now fully compliant |
---|
Next Test Due in 6 months | 05/06/2025 |
---|
| |
---|
| |