| Partner Name | Built Services |
|---|
| State | NSW |
|---|
| Date of Visit | 11/12/2024 |
|---|
| Technician's Name | Jamieson Cawsey |
|---|
| Which Company are you working for? | Sturdie Trade Services |
|---|
| Sturdie Job Number | 50f0015/0464 |
|---|
| Email | Email hidden; Javascript is required. |
|---|
| The Good Guys Site in NSW | wetherill_park |
|---|
|
|
|---|
| Location Name | Wetherill Park |
|---|
| |
|---|
| HTML Block |
|
|---|
| Test Period | Biennial Test (once every two years) |
|---|
| Push Button Test | - Carry out push button test for correct operation
|
|---|
| Carry out push button test for correct operation | |
|---|
| HTML Block |
|
|---|
| Carry out test with RCD Tester | Carry out push button test and record the results below. |
|---|
| RCD Details (Biennial) | | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
0 Degrees |
180 Degrees |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
| DB1 |
1 |
Y |
45 |
54 |
P |
|
|
|
2 |
y |
44 |
56 |
p |
|
|
|
3 |
y |
76 |
66 |
p |
|
|
|
4 |
y |
56 |
45 |
p |
|
|
|
5 |
y |
45 |
55 |
p |
|
|
|
6 |
y |
76 |
87 |
p |
|
|
|
7 |
y |
78 |
77 |
p |
|
|
|
8 |
y |
45 |
66 |
p |
|
|
|
9 |
y |
56 |
65 |
p |
|
|
|
10 |
y |
45 |
67 |
p |
|
|
|
11 |
y |
66 |
56 |
p |
|
|
|
12 |
y |
56 |
55 |
p |
|
|
|
13 |
y |
34 |
45 |
p |
|
|
|
14 |
y |
76 |
45 |
p |
|
|
|
15 |
y |
76 |
45 |
p |
|
|
|
16 |
N |
- |
- |
F |
Not tripping |
Y |
|
17 |
y |
43 |
23 |
p |
|
|
|
18 |
y |
23 |
33 |
p |
|
|
|
19 |
y |
43 |
34 |
p |
|
|
|
20 |
y |
43 |
23 |
p |
|
|
|
21 |
y |
55 |
45 |
p |
|
|
|
22 |
y |
65 |
66 |
p |
|
|
|
23 |
y |
54 |
45 |
p |
|
|
|
24 |
y |
65 |
66 |
p |
|
|
|
25 |
y |
54 |
34 |
p |
|
|
|
26 |
y |
54 |
45 |
p |
|
|
|
27 |
y |
54 |
44 |
p |
|
|
|
30 |
y |
34 |
22 |
p |
|
|
|
35 |
y |
45 |
34 |
p |
|
|
|
36 |
y |
45 |
44 |
p |
|
|
|
37 |
y |
54 |
66 |
p |
|
|
|
38 |
y |
78 |
78 |
p |
|
|
|
43 |
y |
56 |
56 |
p |
|
|
|
44 |
y |
45 |
65 |
p |
|
|
|
45 |
y |
56 |
45 |
p |
|
|
|
46 |
y |
43 |
33 |
p |
|
|
|
47 |
y |
65 |
56 |
p |
|
|
|
48 |
y |
65 |
77 |
p |
|
|
|
49 |
y |
76 |
76 |
p |
|
|
|
50 |
y |
55 |
55 |
p |
|
|
|
51 |
y |
45 |
56 |
p |
|
|
|
54 |
y |
54 |
34 |
p |
|
|
|
55 |
y |
43 |
43 |
p |
|
|
|
56 |
y |
65 |
44 |
p |
|
|
|
57 |
y |
65 |
77 |
p |
|
|
|
58 |
y |
67 |
54 |
p |
|
|
| DB 2 |
1 |
y |
54 |
45 |
p |
|
|
|
|
y |
76 |
87 |
p |
|
|
|
|
y |
45 |
67 |
p |
|
|
|
|
y |
54 |
45 |
p |
|
|
|
|---|
| THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
|---|
| SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
|---|
| Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
|
|---|
| Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
- Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
|
|---|
| Timers | - Check timers for correct operation and timing
|
|---|
| Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
|---|
| HTML Block |
|
|---|
| EMERGENCY LIGHTS | | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
| DB GG1 |
L1 |
R |
Y |
Y |
Y |
P |
|
|
|
|
L2 |
R |
Y |
Y |
Y |
P |
|
|
|
|
L3 |
R |
Y |
Y |
Y |
P |
|
|
|
|
L4 |
R |
Y |
Y |
Y |
P |
|
|
|
|
L5 |
R |
Y |
Y |
Y |
P |
|
|
|
|
L6 |
R |
Y |
Y |
Y |
P |
|
|
|
|
L7 |
R |
Y |
Y |
Y |
P |
|
|
|
|
L8 |
R |
Y |
Y |
Y |
P |
|
|
|
|
L9 |
R |
Y |
Y |
Y |
P |
|
|
|
|
L11 |
R |
Y |
Y |
Y |
P |
|
|
|
|
L11A |
R |
Y |
Y |
Y |
P |
|
|
|
|
EM2 |
S |
Y |
Y |
Y |
P |
|
|
|
|
EM3 |
S |
Y |
Y |
Y |
P |
|
|
|
|
EM4 |
S |
Y |
Y |
Y |
P |
|
|
|
|
EM5 |
S |
Y |
Y |
Y |
P |
|
|
|
|
EM6 |
S |
Y |
Y |
Y |
P |
|
|
|
|
EM7 |
S |
Y |
Y |
Y |
P |
|
|
|
|
EM8 |
S |
Y |
Y |
Y |
P |
|
|
|
|
EM9 |
S |
Y |
Y |
Y |
P |
|
|
|
|
|---|
| HTML Block |
|
|---|
| EXIT LIGHTS | | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
| DB GG1 |
E1 |
Y |
Y |
Y |
P |
|
|
|
|
E2 |
Y |
Y |
Y |
P |
|
|
|
|
E3 |
Y |
Y |
Y |
P |
|
|
|
|
E4 |
Y |
Y |
Y |
P |
|
|
|
|
E5 |
Y |
Y |
Y |
P |
|
|
|
|
E6 |
Y |
Y |
Y |
P |
|
|
|
|
E7 |
Y |
Y |
Y |
P |
|
|
|
|
E8 |
Y |
Y |
N |
F |
Missing half of the signage |
Y |
N |
|
E9 |
Y |
Y |
Y |
P |
|
|
|
|
E10 |
Y |
Y |
Y |
P |
|
|
|
|
E11 |
Y |
Y |
Y |
P |
|
|
|
|
E12 |
Y |
Y |
Y |
P |
|
|
|
|
E13 |
Y |
Y |
Y |
P |
|
|
|
|
E14 |
Y |
Y |
Y |
P |
|
|
|
|
E15 |
Y |
Y |
Y |
P |
|
|
|
|
E16 |
Y |
Y |
Y |
P |
|
|
|
|
E17 |
Y |
Y |
Y |
P |
|
|
|
|
E18 |
Y |
Y |
Y |
P |
|
|
|
|
E19 |
Y |
Y |
Y |
P |
|
|
|
|
E20 |
Y |
Y |
Y |
P |
|
|
|
|
E21 |
Y |
Y |
Y |
P |
|
|
|
|
|---|
| SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
|---|
| General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
|---|
| HTML Block |
|
|---|
| General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
|---|
| HTML Block |
|
|---|
| Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
|---|
| Lighting Report | | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
| High Bay Halo Globe |
Y |
| 2x30w Diffused Fluoro Fitting |
Y |
| 50mm LED Downlight |
Y |
| Fluoro Pelmet Light Boxes |
Y |
| Low Bay Lights |
Y |
|
|---|
| Are there any Warranty items needing to be repaired? | No |
|---|
| LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
| Exit light |
E8 - fridges |
1 |
Missing half of the exit light signage |
Y |
N |
N |
Replaced exit light |
| LED HIGHBAY |
Monitors |
1 |
Faulty light fitting |
Y |
N |
N |
Replaced |
| CB14 |
DB1 |
1 |
Failed trip test |
Y |
N |
N |
Replace onsite |
|
|---|
| Next Test Due in 6 months | 11/06/2024 |
|---|
| |
|---|
| |