Partner Name | Built Services |
---|
State | NSW |
---|
Date of Visit | 15/01/2025 |
---|
Technician's Name | Jamieson Cawsey |
---|
Which Company are you working for? | Sturdie Trade Services |
---|
Sturdie Job Number | 50F0015/0502 |
---|
Email | Email hidden; Javascript is required. |
---|
The Good Guys Site in NSW | tempe |
---|
|
|
---|
Location Name | Tempe |
---|
| |
---|
HTML Block |
|
---|
Test Period | 6 Monthly (90 minutes) |
---|
Push Button Test | - Carry out push button test for correct operation
|
---|
Carry out push button test for correct operation | |
---|
HTML Block |
|
---|
Carry out test with RCD Tester | Carry out push button test and record the results below. |
---|
THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
---|
RCD Details (6 Month) | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
DB1 |
1 |
Y |
P |
|
|
|
2 |
Y |
P |
|
|
|
3 |
Y |
P |
|
|
|
4 |
Y |
P |
|
|
|
5 |
Y |
P |
|
|
|
6 |
Y |
P |
|
|
|
7 |
Y |
P |
|
|
|
8 |
Y |
P |
|
|
|
9 |
Y |
P |
|
|
|
10 |
Y |
P |
|
|
|
11 |
Y |
P |
|
|
|
12 |
Y |
P |
|
|
|
13 |
Y |
P |
|
|
|
14 |
Y |
P |
|
|
|
15 |
Y |
P |
|
|
|
16 |
Y |
P |
|
|
|
17 |
Y |
P |
|
|
|
18 |
Y |
P |
|
|
|
19 |
Y |
P |
|
|
|
20 |
Y |
P |
|
|
|
21 |
Y |
P |
|
|
|
22 |
Y |
P |
|
|
|
26 |
Y |
P |
|
|
DB2 |
1 |
Y |
P |
|
|
|
2 |
Y |
P |
|
|
|
9 |
Y |
P |
|
|
|
11 |
Y |
P |
|
|
|
13 |
Y |
P |
|
|
DB2A |
27 |
Y |
P |
|
|
|
29 |
Y |
P |
|
|
|
30 |
Y |
P |
|
|
|
31 |
Y |
P |
|
|
|
32 |
Y |
P |
|
|
|
33 |
Y |
P |
|
|
|
34 |
Y |
P |
|
|
|
35 |
Y |
P |
|
|
|
36 |
Y |
P |
|
|
|
37 |
Y |
P |
|
|
|
38 |
Y |
P |
|
|
|
39 |
Y |
P |
|
|
|
40 |
Y |
P |
|
|
|
41 |
Y |
P |
|
|
|
43 |
Y |
P |
|
|
|
44 |
Y |
P |
|
|
|
45 |
Y |
P |
|
|
|
46 |
Y |
P |
|
|
|
47 |
Y |
P |
|
|
|
48 |
Y |
P |
|
|
|
49 |
Y |
P |
|
|
|
50 |
Y |
P |
|
|
|
51 |
Y |
P |
|
|
|
52 |
Y |
P |
|
|
|
53 |
Y |
P |
|
|
|
54 |
Y |
P |
|
|
|
55 |
Y |
P |
|
|
|
56 |
Y |
P |
|
|
|
---|
SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
---|
Timers | - Check timers for correct operation and timing
|
---|
Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
---|
HTML Block |
|
---|
EMERGENCY LIGHTS | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB2A CB42 |
S2 |
R |
Y |
Y |
Y |
P |
|
|
|
|
S4 |
R |
Y |
Y |
Y |
P |
|
|
|
|
S5 |
R |
Y |
Y |
Y |
P |
|
|
|
|
S6 |
R |
Y |
Y |
Y |
P |
|
|
|
|
EF7 |
4ft Twin Fluoro |
Y |
Y |
Y |
P |
|
|
|
|
EF8 |
4ft Twin Fluoro |
Y |
Y |
Y |
P |
|
|
|
|
EF10 |
4ft Twin Fluoro |
Y |
Y |
Y |
P |
|
|
|
|
EF11 |
4ft Twin Fluoro |
Y |
Y |
Y |
P |
|
|
|
|
EF14 |
4ft Twin Fluoro |
Y |
Y |
Y |
P |
|
|
|
|
EF15 |
4ft Twin Fluoro |
Y |
Y |
Y |
P |
|
|
|
|
EF18 |
4ft Twin Fluoro |
Y |
Y |
Y |
P |
|
|
|
|
EF19 |
4ft Twin Fluoro |
Y |
Y |
Y |
P |
|
|
|
|
EF20 |
4ft Twin Fluoro |
Y |
Y |
Y |
P |
|
|
|
|
EF21 |
4ft Twin Fluoro |
Y |
Y |
Y |
P |
|
|
|
|
EF24 |
4ft Twin Fluoro |
Y |
Y |
Y |
P |
|
|
|
|
EF26 |
4ft Twin Fluoro |
Y |
Y |
Y |
P |
|
|
|
|
EF29 |
4ft Twin Fluoro |
Y |
Y |
Y |
P |
|
|
|
|
EF30 |
4ft Twin Fluoro |
Y |
Y |
Y |
P |
|
|
|
|
EF31 |
4ft Twin Fluoro |
Y |
Y |
Y |
P |
|
|
|
|
EF32 |
4ft Twin Fluoro |
Y |
Y |
Y |
P |
|
|
|
|
S35 |
R |
Y |
Y |
Y |
P |
|
|
|
|
EF37 |
4ft Twin Fluoro |
Y |
Y |
Y |
P |
|
|
|
|
EF39 |
4ft Twin Fluoro |
Y |
Y |
Y |
P |
|
|
|
|
EF41 |
4ft Twin Fluoro |
Y |
Y |
Y |
P |
|
|
|
|
EF42 |
4ft Twin Fluoro |
Y |
Y |
Y |
P |
|
|
|
|
EF45 |
4ft Twin Fluoro |
Y |
Y |
Y |
P |
|
|
|
|
EF46 |
4ft Twin Fluoro |
Y |
Y |
Y |
P |
|
|
|
|
S49 |
R |
Y |
Y |
Y |
P |
|
|
|
|
S50 |
R |
Y |
Y |
Y |
P |
|
|
|
|
S51 |
R |
Y |
Y |
Y |
P |
|
|
|
|
S52 |
R |
Y |
Y |
Y |
P |
|
|
|
|
S53 |
R |
Y |
Y |
Y |
P |
|
|
|
|
S55 |
R |
Y |
Y |
Y |
P |
|
|
|
|
S56 |
R |
Y |
Y |
Y |
P |
|
|
|
|
S58 |
R |
Y |
Y |
Y |
P |
|
|
|
|
---|
HTML Block |
|
---|
EXIT LIGHTS | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB2A-CB42 |
EX1 |
Y |
Y |
Y |
P |
|
|
|
|
EX3 |
Y |
Y |
Y |
P |
|
|
|
|
EX9 |
Y |
Y |
Y |
P |
|
|
|
|
EX12 |
Y |
Y |
Y |
P |
|
|
|
|
EX13 |
Y |
Y |
Y |
P |
|
|
|
|
EX16 |
Y |
Y |
Y |
P |
|
|
|
|
EX17 |
Y |
Y |
Y |
P |
|
|
|
|
EX22 |
Y |
Y |
Y |
P |
|
|
|
|
EX23 |
Y |
Y |
Y |
P |
|
|
|
|
EX25 |
Y |
Y |
Y |
P |
|
|
|
|
EX27 |
Y |
Y |
Y |
P |
|
|
|
|
EX28 |
Y |
Y |
Y |
P |
|
|
|
|
EX33 |
Y |
Y |
Y |
P |
|
|
|
|
EX34 |
Y |
Y |
Y |
P |
|
|
|
|
EX36 |
Y |
Y |
Y |
P |
|
|
|
|
EX38 |
Y |
Y |
Y |
P |
|
|
|
|
EX40 |
Y |
Y |
Y |
P |
|
|
|
|
EX43 |
Y |
Y |
Y |
P |
|
|
|
|
EX44 |
Y |
Y |
Y |
P |
|
|
|
|
EX47 |
Y |
Y |
Y |
P |
|
|
|
|
EX48 |
Y |
Y |
Y |
P |
|
|
|
|
EX54 |
Y |
Y |
Y |
P |
|
|
|
|
EX55 |
Y |
Y |
Y |
P |
|
|
|
|
EX57 |
Y |
Y |
Y |
P |
|
|
|
|
---|
SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
---|
General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
---|
HTML Block |
|
---|
General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
---|
HTML Block |
|
---|
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
---|
Lighting Report | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
LED High Bays 150W |
Y |
LED Downlight 210mm 31W S9075DP WH |
Y |
Ledline 4ft 40W SLD4000CW |
Y |
LED Strip Display Signs DC24V |
Y |
LED Downlight 11W S9071CP WH |
Y |
|
---|
Are there any Warranty items needing to be repaired? | No |
---|
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
Switchboard Schedule |
DB1/2 |
1 |
No switchboard legend on site |
Y |
N |
N |
To be placed on site at next visit |
|
---|
Site Status Selector | Store now fully compliant |
---|
Next Test Due in 6 months | 15/07/2025 |
---|
| |
---|
| |