State | ACT |
---|
Date of Visit | 28/01/2025 |
---|
Technician's Name | Will Andrews |
---|
Which Company are you working for? | Sturdie Trade Services |
---|
Sturdie Job Number | 50F0015/0495 |
---|
Email | Email hidden; Javascript is required. |
---|
The Good Guys Site in ACT | tuggeranong |
---|
|
|
---|
Location Name | Tuggeranong |
---|
| |
---|
HTML Block |
|
---|
Test Period | 6 Monthly (90 minutes) |
---|
Push Button Test | - Carry out push button test for correct operation
|
---|
Carry out push button test for correct operation | |
---|
HTML Block |
|
---|
Carry out test with RCD Tester | Carry out push button test and record the results below. |
---|
THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
---|
RCD Details (6 Month) | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
DB01 |
1 |
Y |
P |
|
|
DB01 |
2 |
Y |
P |
|
|
DB01 |
3 |
Y |
P |
|
|
DB01 |
4 |
Y |
P |
|
|
DB01 |
5 |
Y |
P |
|
|
DB01 |
6 |
Y |
P |
|
|
DB01 |
7 |
Y |
P |
|
|
DB01 |
8 |
Y |
P |
|
|
DB01 |
9 |
Y |
P |
|
|
DB01 |
10 |
Y |
P |
|
|
DB01 |
11 |
Y |
P |
|
|
DB01 |
12 |
Y |
P |
|
|
DB01 |
16 |
Y |
P |
|
|
DB01 |
17 |
Y |
P |
|
|
DB01 |
18 |
Y |
P |
|
|
DB01 |
19 |
Y |
P |
|
|
DB01 |
20 |
Y |
P |
|
|
DB01 |
21 |
Y |
P |
|
|
DB01 |
22 |
Y |
P |
|
|
DB01 |
23 |
Y |
P |
|
|
DB01 |
24 |
Y |
P |
|
|
DB 1A |
1 |
Y |
P |
|
|
DB 1A |
2 |
Y |
P |
|
|
DB 1A |
3 |
Y |
P |
|
|
DB 1A |
4 |
Y |
P |
|
|
DB 1A |
5 |
Y |
P |
|
|
DB 1A |
6 |
Y |
P |
|
|
DB 1A |
7 |
Y |
P |
|
|
DB 1A |
8 |
Y |
P |
|
|
DB 1A |
9 |
Y |
P |
|
|
DB 1A |
10 |
Y |
P |
|
|
DB 1A |
11 |
Y |
P |
|
|
DB 1A |
12 |
Y |
P |
|
|
DB 1A |
14 |
Y |
P |
|
|
DBT3 |
1 |
Y |
P |
|
|
DBT3 |
2 |
Y |
P |
|
|
DBT3 |
3 |
Y |
P |
|
|
DBT3 |
4 |
Y |
P |
|
|
DBT3 |
5 |
Y |
P |
|
|
DBT3 |
6 |
Y |
P |
|
|
DBT3 |
7 |
Y |
P |
|
|
DBT3 |
8 |
Y |
P |
|
|
DBT3 |
9 |
Y |
P |
|
|
DBT3 |
10 |
Y |
P |
|
|
DBT3 |
11 |
Y |
P |
|
|
DBT3 |
13 |
Y |
P |
|
|
DBT3 |
13 |
Y |
P |
|
|
DBT3 |
14 |
Y |
P |
|
|
DBT3 |
14 |
Y |
P |
|
|
DBT3 |
15 |
Y |
P |
|
|
DBT3 |
16 |
Y |
P |
|
|
DBT3 |
17 |
Y |
P |
|
|
DBT3 |
18 |
Y |
P |
|
|
DBT3 |
19 |
Y |
P |
|
|
DBT3 |
20 |
Y |
P |
|
|
DBT3 |
21 |
Y |
P |
|
|
DBT3 |
22 |
Y |
P |
|
|
DBT3 |
23 |
Y |
P |
|
|
DBT3 |
24 |
Y |
P |
|
|
DBT3 |
25 |
Y |
P |
|
|
DBT3 |
26 |
Y |
P |
|
|
DBT3 |
27 |
Y |
P |
|
|
DBT3 |
28 |
Y |
P |
|
|
DBT3 |
29 |
Y |
P |
|
|
DBT3 |
30 |
Y |
P |
|
|
DBT3 |
32 |
Y |
P |
|
|
DBT3 |
34 |
Y |
P |
|
|
DBT3 |
36 |
Y |
P |
|
|
DBT3 |
38 |
Y |
P |
|
|
DBT3 |
40 |
Y |
P |
|
|
DBT3 |
42 |
Y |
P |
|
|
DBT3 |
44 |
Y |
P |
|
|
DBT3 |
49 |
Y |
P |
|
|
DBT3 |
51 |
Y |
P |
|
|
DBT3 |
53 |
Y |
P |
|
|
DBT3 |
55 |
Y |
P |
|
|
DBT3 |
57 |
Y |
P |
|
|
DBT3 |
59 |
Y |
P |
|
|
DBT3 |
61 |
Y |
P |
|
|
DBT3 |
63 |
Y |
P |
|
|
DBT3 |
65 |
Y |
P |
|
|
DBT4 |
37 |
Y |
P |
|
|
DBT4 |
38 |
Y |
P |
|
|
DBT4 |
39 |
Y |
P |
|
|
DBT4 |
25 |
Y |
P |
|
|
DBT4 |
26 |
Y |
P |
|
|
|
---|
SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
---|
Timers | - Check timers for correct operation and timing
|
---|
Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
---|
HTML Block |
|
---|
EMERGENCY LIGHTS | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DBT3 |
1 |
S |
Y |
Y |
Y |
P |
|
|
|
DBT3 |
2 |
S |
Y |
Y |
Y |
P |
|
|
|
DBT3 |
3 |
S |
Y |
Y |
Y |
P |
|
|
|
DBT3 |
5 |
S |
Y |
Y |
Y |
P |
|
|
|
DBT3 |
6 |
S |
Y |
Y |
Y |
P |
|
|
|
DBT3 |
7 |
S |
Y |
Y |
Y |
P |
|
|
|
DBT3 |
8 |
S |
Y |
Y |
Y |
P |
|
|
|
DBT3 |
9 |
S |
Y |
Y |
Y |
P |
|
|
|
DBT3 |
10 |
S |
Y |
Y |
Y |
P |
|
|
|
DBT3 |
11 |
S |
Y |
Y |
Y |
P |
|
|
|
DBT3 |
12 |
S |
Y |
Y |
Y |
P |
|
|
|
DBT3 |
13 |
R |
Y |
Y |
Y |
P |
|
|
|
DBT3 |
14 |
S |
Y |
Y |
Y |
P |
|
|
|
DBT3 |
15 |
S |
Y |
Y |
Y |
P |
|
|
|
DBT3 |
17 |
R |
Y |
Y |
Y |
P |
|
|
|
DBT3 |
18 |
R |
Y |
Y |
Y |
P |
|
|
|
DBT3 |
15 |
R |
Y |
Y |
Y |
P |
|
|
|
DBT3 |
28 |
R |
Y |
Y |
Y |
P |
|
|
|
DBT3 |
29 |
R |
Y |
Y |
Y |
P |
|
|
|
|
---|
HTML Block |
|
---|
EXIT LIGHTS | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DBT3 |
1 |
Y |
Y |
Y |
P |
|
|
|
DBT3 |
2 |
Y |
Y |
Y |
P |
|
|
|
DBT3 |
3 |
Y |
Y |
Y |
P |
|
|
|
DBT3 |
4 |
Y |
Y |
Y |
P |
|
|
|
DBT3 |
6 |
Y |
Y |
Y |
P |
|
|
|
DBT3 |
9 |
Y |
Y |
Y |
P |
|
|
|
DBT4 |
6 |
Y |
Y |
Y |
P |
|
|
|
DBT4 |
7 |
Y |
Y |
Y |
P |
|
|
|
DBT4 |
8 |
Y |
Y |
Y |
P |
|
|
|
|
---|
SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
---|
General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
---|
HTML Block |
|
---|
General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
---|
HTML Block |
|
---|
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
---|
Lighting Report | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
LED High Bay |
Y |
4ft LED Batten |
Y |
1200mm LED Panel Light |
Y |
12w LED Linkable Light |
Y |
|
---|
Are there any Warranty items needing to be repaired? | No |
---|
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
Light Boxes x 6 |
Throughout Store |
6 |
Blown Lights |
N |
N |
Y |
Quote #2161 has been submitted to The Good Guys Head Office and has since been approved. Works in progress under Parent Job ID: 2599932. |
|
---|
Site Status Selector | Store now fully compliant |
---|
Next Test Due in 6 months | 28/07/2025 |
---|
| |
---|
| |