| Partner Name | Transit Electrical Pty Ltd |
|---|
| State | WA |
|---|
| Date of Visit | 31/01/2025 |
|---|
| Technician's Name | Josh Back |
|---|
| Which Company are you working for? | Sturdie Trade Services |
|---|
| Sturdie Job Number | 50F0023/0206 |
|---|
| Email | Email hidden; Javascript is required. |
|---|
| The Good Guys Site in WA | joondalup_warehouse |
|---|
|
|
|---|
| Location Name | Joondalup Warehouse |
|---|
| |
|---|
| HTML Block |
|
|---|
| Test Period | 6 Monthly (90 minutes) |
|---|
| Push Button Test | - Carry out push button test for correct operation
|
|---|
| Carry out push button test for correct operation | |
|---|
| HTML Block |
|
|---|
| Carry out test with RCD Tester | Carry out push button test and record the results below. |
|---|
| THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
|---|
| RCD Details (6 Month) | | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
| DB 01 |
3 |
Y |
P |
|
|
| DB 01 |
5 |
Y |
P |
|
|
| DB 01 |
7 |
Y |
P |
|
|
| DB 01 |
9 |
Y |
P |
|
|
| DB 01 |
11 |
Y |
P |
|
|
| DB 01 |
13 |
Y |
P |
|
|
| DB 01 |
15 |
Y |
P |
|
|
| DB 01 |
17 |
Y |
P |
|
|
| DB 01 |
18 |
Y |
P |
|
|
| DB 01 |
19 |
Y |
P |
|
|
| DB 01 |
21 |
Y |
P |
|
|
| DB 01 |
23 |
Y |
P |
|
|
| DB 01 |
37 |
Y |
P |
|
|
| DB 01 |
39 |
Y |
P |
|
|
|
|---|
| SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
|---|
| Timers | - Check timers for correct operation and timing
|
|---|
| Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
|---|
| HTML Block |
|
|---|
| EMERGENCY LIGHTS | | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
| DB 01 |
EM 01 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB 01 |
EM 02 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB 01 |
EM 03 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB 01 |
EM 04 |
S |
Y |
Y |
Y |
P |
|
|
|
| DB 01 |
EM 05 |
S |
Y |
Y |
Y |
P |
|
|
|
| DB01 |
EM 06 |
S |
Y |
Y |
Y |
P |
|
|
|
| DB01 |
EM 07 |
S |
Y |
Y |
Y |
P |
|
|
|
| DB01 |
EM 08 |
S |
Y |
Y |
Y |
P |
|
|
|
| DB01 |
EM 09 |
S |
Y |
Y |
Y |
P |
|
|
|
| DB01 |
EM 10 |
S |
Y |
Y |
Y |
P |
|
|
|
| DB01 |
EM 11 |
S |
Y |
Y |
Y |
P |
|
|
|
|
|---|
| HTML Block |
|
|---|
| EXIT LIGHTS | | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
| DB 01 |
EX 1 |
Y |
Y |
Y |
P |
|
|
|
| DB 01 |
EX 2 |
Y |
Y |
Y |
P |
|
|
|
| DB01 |
EX 3 |
Y |
Y |
Y |
P |
|
|
|
| DB01 |
EX 4 |
Y |
Y |
Y |
P |
|
|
|
| DB01 |
EX 5 |
Y |
Y |
Y |
P |
|
|
|
| DB01 |
EX 6 |
Y |
Y |
Y |
P |
|
|
|
|
|---|
| SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
|---|
| General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
|---|
| HTML Block |
|
|---|
| General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
|---|
| HTML Block |
|
|---|
| Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
|---|
| Lighting Report | | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
| Exit Signs |
Y |
| LED Emergency Spitfires |
Y |
| Twin LED Emergency Spitfire Surface Mount |
Y |
| Surface Lowbay |
Y |
| LED HiBay |
Y |
| LED Batten Light |
Y |
|
|---|
| Are there any Warranty items needing to be repaired? | No |
|---|
| LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
| LED Hibay |
Processing Area |
1 |
Not illuminated |
Y |
N |
N |
Scissor Lift was Required |
| Surface Lowbay |
Front awning of warehouse |
1 |
Not illuminated |
Y |
N |
N |
Scissor Lift was Required |
|
|---|
| Site Status Selector | Store now fully compliant |
|---|
| Next Test Due in 6 months | 31/07/2025 |
|---|
| |
|---|
| |