Partner Name | Built Services |
---|
State | NSW |
---|
Date of Visit | 28/03/2025 |
---|
Technician's Name | Jamieson Cawsey |
---|
Which Company are you working for? | Sturdie Trade Services |
---|
Sturdie Job Number | 50F0015/0546 |
---|
Email | Email hidden; Javascript is required. |
---|
The Good Guys Site in NSW | chatswood |
---|
|
|
---|
Location Name | Chatswood |
---|
| |
---|
HTML Block |
|
---|
Test Period | 6 Monthly (90 minutes) |
---|
Push Button Test | - Carry out push button test for correct operation
|
---|
Carry out push button test for correct operation | |
---|
HTML Block |
|
---|
Carry out test with RCD Tester | Carry out push button test and record the results below. |
---|
THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
---|
RCD Details (6 Month) | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
DB1 |
1 |
Y |
P |
|
|
|
2 |
Y |
P |
|
|
|
3 |
Y |
P |
|
|
|
4 |
Y |
P |
|
|
|
5 |
Y |
P |
|
|
|
6 |
Y |
P |
|
|
|
7 |
Y |
P |
|
|
|
8 |
Y |
P |
|
|
|
9 |
Y |
P |
|
|
|
10 |
Y |
P |
|
|
|
11 |
Y |
P |
|
|
|
12 |
Y |
P |
|
|
|
13 |
Y |
P |
|
|
|
14 |
Y |
P |
|
|
|
15 |
Y |
P |
|
|
|
16 |
Y |
P |
|
|
|
17 |
Y |
P |
|
|
|
18 |
Y |
P |
|
|
|
19 |
Y |
P |
|
|
|
20 |
Y |
P |
|
|
|
21 |
Y |
P |
|
|
|
22 |
Y |
P |
|
|
|
23 |
Y |
P |
|
|
|
24 |
Y |
P |
|
|
|
25 |
Y |
P |
|
|
|
26 |
Y |
P |
|
|
|
27 |
Y |
P |
|
|
|
28 |
Y |
P |
|
|
|
29 |
Y |
P |
|
|
|
30 |
Y |
P |
|
|
|
31 |
Y |
P |
|
|
|
32 |
Y |
P |
|
|
|
33 |
Y |
P |
|
|
|
34 |
Y |
P |
|
|
|
36 |
Y |
P |
|
|
|
37 |
Y |
P |
|
|
|
38 |
Y |
P |
|
|
|
39 |
Y |
P |
|
|
|
40 |
Y |
P |
|
|
|
41 |
Y |
P |
|
|
|
42 |
Y |
P |
|
|
|
43 |
Y |
P |
|
|
|
44 |
Y |
P |
|
|
|
46 |
Y |
P |
|
|
|
47 |
Y |
P |
|
|
|
48 |
Y |
P |
|
|
|
49 |
Y |
P |
|
|
|
50 |
Y |
P |
|
|
|
51 |
Y |
P |
|
|
|
52 |
Y |
P |
|
|
|
53 |
Y |
P |
|
|
|
54 |
Y |
P |
|
|
|
55 |
Y |
P |
|
|
|
57 |
Y |
P |
|
|
|
59 |
Y |
P |
|
|
DB01 |
1 |
Y |
P |
|
|
|
2 |
Y |
P |
|
|
|
3 |
Y |
P |
|
|
|
4 |
Y |
P |
|
|
|
5 |
Y |
P |
|
|
|
6 |
Y |
P |
|
|
|
7 |
Y |
P |
|
|
|
8 |
Y |
P |
|
|
|
9 |
Y |
P |
|
|
|
10 |
Y |
P |
|
|
|
11 |
Y |
P |
|
|
|
12 |
Y |
P |
|
|
|
13 |
Y |
P |
|
|
|
14 |
Y |
P |
|
|
|
16 |
Y |
P |
|
|
|
18 |
Y |
P |
|
|
|
28 |
Y |
P |
|
|
DB02 |
15 |
Y |
P |
|
|
|
16 |
Y |
P |
|
|
|
---|
SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
---|
Timers | - Check timers for correct operation and timing
|
---|
Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
---|
HTML Block |
|
---|
EMERGENCY LIGHTS | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB1 |
EM1 |
S |
Y |
Y |
Y |
P |
|
|
|
DB1 |
EM2 |
S |
Y |
Y |
Y |
P |
|
|
|
DB1 |
EM3 |
S |
Y |
Y |
Y |
P |
|
|
|
DB1 |
EM4 |
S |
Y |
Y |
Y |
P |
|
|
|
DB1 |
EM5 |
S |
Y |
Y |
Y |
P |
|
|
|
DB1 |
EM6 |
S |
Y |
Y |
Y |
P |
|
|
|
DB1 |
EM7 |
S |
Y |
Y |
Y |
P |
|
|
|
DB1 |
EM8 |
S |
Y |
Y |
Y |
P |
|
|
|
DB1 |
EM9 |
S |
Y |
Y |
Y |
P |
|
|
|
DB1 |
EM10 |
S |
Y |
Y |
Y |
P |
|
|
|
DB1 |
EM11 |
S |
Y |
Y |
Y |
P |
|
|
|
DB1 |
EM8a |
S |
Y |
Y |
Y |
P |
|
|
|
DB1 |
EM9a |
R |
Y |
Y |
Y |
P |
|
|
|
DB1 |
EM10a |
R |
Y |
Y |
Y |
P |
|
|
|
DB1 |
EM11a |
R |
Y |
Y |
Y |
P |
|
|
|
DB1 |
EM12a |
R |
Y |
Y |
Y |
P |
|
|
|
DB1 |
EM13a |
R |
Y |
Y |
Y |
P |
|
|
|
DB1 |
EM14a |
R |
Y |
Y |
Y |
P |
|
|
|
DB1 |
EM15a |
R |
Y |
Y |
Y |
P |
|
|
|
DB1 |
EM16a |
R |
Y |
Y |
Y |
P |
|
|
|
|
---|
HTML Block |
|
---|
EXIT LIGHTS | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB1 |
EX1 |
Y |
Y |
Y |
P |
|
|
|
DB1 |
EX2 |
Y |
Y |
Y |
P |
|
|
|
DB1 |
EX3 |
Y |
Y |
Y |
P |
|
|
|
DB1 |
EX4 |
Y |
Y |
Y |
P |
|
|
|
DB1 |
EX5 |
Y |
Y |
Y |
P |
|
|
|
DB1 |
EX6 |
Y |
Y |
Y |
P |
|
|
|
DB1 |
EX7 |
Y |
Y |
Y |
P |
|
|
|
DB1 |
EX8 |
Y |
Y |
Y |
P |
|
|
|
DB1 |
EX12 |
Y |
Y |
Y |
P |
|
|
|
DB1 |
EX16 |
Y |
Y |
Y |
P |
|
|
|
|
---|
SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
---|
General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
---|
HTML Block |
|
---|
General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
---|
HTML Block |
|
---|
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
---|
Lighting Report | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
High Bays Halo Globe |
Y |
2 x 8W Fluoro |
Y |
50mm LED Downlight |
Y |
1200mm Fluoro Troffer |
Y |
Fluorescent T5 Fluoro Pelmet Lights |
Y |
|
---|
Are there any Warranty items needing to be repaired? | No |
---|
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
Highbay |
Adjacent switchboard |
1 |
Faulty fitting |
Y |
N |
N |
Scissor lift is required to replace light fittings |
|
---|
Site Status Selector | Store now fully compliant |
---|
Next Test Due in 6 months | 26/09/2025 |
---|
| |
---|
| |