| Partner Name | Transit Electrical Pty Ltd |
|---|
| State | WA |
|---|
| Date of Visit | 02/04/2025 |
|---|
| Technician's Name | Connor Stevens |
|---|
| Which Company are you working for? | Sturdie Trade Services |
|---|
| Sturdie Job Number | 50F0023/0224 |
|---|
| Email | Email hidden; Javascript is required. |
|---|
| The Good Guys Site in WA | malaga |
|---|
|
|
|---|
| Location Name | Malaga |
|---|
| |
|---|
| HTML Block |
|
|---|
| Test Period | 6 Monthly (90 minutes) |
|---|
| Push Button Test | - Carry out push button test for correct operation
|
|---|
| Carry out push button test for correct operation | |
|---|
| HTML Block |
|
|---|
| Carry out test with RCD Tester | Carry out push button test and record the results below. |
|---|
| THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
|---|
| RCD Details (6 Month) | | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
| DB 01 |
3W |
Y |
P |
|
|
| DB 01 |
3B |
Y |
P |
|
|
| DB 01 |
5W |
Y |
P |
|
|
| DB 01 |
6B |
Y |
P |
|
|
| DB 01 |
7R |
Y |
P |
|
|
| DB 01 |
8B |
Y |
P |
|
|
| DB 01 |
9R |
Y |
P |
|
|
| DB 01 |
9W |
Y |
P |
|
|
| DB 01 |
10R |
Y |
P |
|
|
| DB 01 |
10W |
Y |
P |
|
|
| DB 01 |
10B |
Y |
P |
|
|
| DB 01 |
11R |
Y |
P |
|
|
| DB 01 |
11W |
Y |
P |
|
|
| DB 01 |
11B |
Y |
P |
|
|
| DB 01 |
12R |
Y |
P |
|
|
| DB 01 |
12W |
Y |
P |
|
|
| DB 01 |
12B |
Y |
P |
|
|
| DB 01 |
13R |
Y |
P |
|
|
| DB 01 |
13W |
Y |
P |
|
|
| DB 01 |
14R |
Y |
P |
|
|
| DB 01 |
15R |
Y |
P |
|
|
| DB 01 |
15W |
Y |
P |
|
|
| DB 01 |
19R |
Y |
P |
|
|
| DB 01 |
19W |
Y |
P |
|
|
| DB 01 |
20W |
Y |
P |
|
|
| DB 01 |
20B |
Y |
P |
|
|
| DB 01 |
23R |
Y |
P |
|
|
| DB 01 |
23W |
Y |
P |
|
|
| DB 01 |
24W |
Y |
P |
|
|
| DB 01 |
24B |
Y |
P |
|
|
| DB 01 |
RWB28 |
Y |
P |
|
|
| DB 01 |
27R |
Y |
P |
|
|
| DB 01 |
30R |
Y |
P |
|
|
| DB 01 |
30B |
Y |
P |
|
|
| DB 01 |
31R |
Y |
P |
|
|
| DB 01 |
32R |
Y |
P |
|
|
| DB 01 |
32W |
Y |
P |
|
|
| DB 01 |
32B |
Y |
P |
|
|
| DB 01 |
33R |
Y |
P |
|
|
| DB 01 |
33W |
Y |
P |
|
|
| DB 01 |
33B |
Y |
P |
|
|
| DB 01 |
34R |
Y |
P |
|
|
| DB 01 |
34W |
Y |
P |
|
|
| DB 01 |
34B |
Y |
P |
|
|
| DB 02 |
3W |
Y |
P |
|
|
| DB 02 |
3B |
Y |
P |
|
|
| DB 02 |
5R |
Y |
P |
|
|
| DB 02 |
W5 |
Y |
P |
|
|
| DB 02 |
B5 |
Y |
P |
|
|
| DB 02 |
6R |
Y |
P |
|
|
| DB 02 |
6W |
Y |
P |
|
|
| DB 02 |
6B |
Y |
P |
|
|
| DB 02 |
7R |
Y |
P |
|
|
| DB 02 |
7W |
Y |
P |
|
|
| DB 02 |
7B |
Y |
P |
|
|
| DB 02 |
8R |
Y |
P |
|
|
| DB 02 |
8W |
Y |
P |
|
|
| DB 02 |
8B |
Y |
P |
|
|
| DB 02 |
9R |
Y |
P |
|
|
| DB 02 |
9W |
Y |
P |
|
|
| DB 02 |
9B |
Y |
P |
|
|
| DB 02 |
13W |
Y |
P |
|
|
| DB 02 |
17R |
Y |
P |
|
|
| DB 02 |
17W |
Y |
P |
|
|
| DB 02 |
18W |
Y |
P |
|
|
| DB 02 - B |
1R |
Y |
P |
|
|
| DB 02 - B |
1B |
Y |
P |
|
|
| DB 02 - B |
2R |
Y |
P |
|
|
| DB 02 - B |
2W |
Y |
P |
|
|
| DB 02 - B |
4W |
Y |
P |
|
|
| DB 02 - B |
4B |
Y |
P |
|
|
| DB 02 - B |
RWB11 |
Y |
P |
|
|
|
|---|
| SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
|---|
| Timers | - Check timers for correct operation and timing
|
|---|
| Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
|---|
| HTML Block |
|
|---|
| EMERGENCY LIGHTS | | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
| DB 01 |
2 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB 01 |
3 |
S |
Y |
Y |
Y |
P |
|
|
|
| DB 01 |
4 |
S |
Y |
Y |
Y |
P |
|
|
|
| DB 01 |
5 |
S |
Y |
Y |
Y |
P |
|
|
|
| DB 01 |
6 |
S |
Y |
Y |
Y |
P |
|
|
|
| DB 01 |
7 |
S |
Y |
Y |
Y |
P |
|
|
|
| DB 01 |
8 |
S |
Y |
Y |
Y |
P |
|
|
|
| DB 01 |
9 |
S |
Y |
Y |
Y |
P |
|
|
|
| DB 01 |
10 |
Twin tubed batten |
Y |
Y |
Y |
P |
|
|
|
| DB 01 |
11 |
S |
Y |
Y |
Y |
P |
|
|
|
| DB 01 |
12 |
Twin tubed batten |
Y |
Y |
Y |
P |
|
|
|
| DB 02 |
13 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB 02 |
14 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB 02 |
15 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB 02 |
17 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB 02 |
19 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB 02 |
20 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB 02 |
22 |
S |
Y |
Y |
Y |
P |
|
|
|
| DB 02 |
23 |
S |
Y |
Y |
Y |
P |
|
|
|
| DB 02 |
24 |
S |
Y |
Y |
Y |
P |
|
|
|
| DB 02 |
25 |
S |
Y |
Y |
Y |
P |
|
|
|
|
|---|
| HTML Block |
|
|---|
| EXIT LIGHTS | | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
| DB 01 |
1 |
Y |
Y |
Y |
P |
|
|
|
| DB 01 |
16 |
Y |
Y |
Y |
P |
|
|
|
| DB 02 |
18 |
Y |
Y |
Y |
P |
|
|
|
| DB 02 |
21 |
Y |
Y |
Y |
P |
|
|
|
| DB 02 |
22 |
Y |
Y |
Y |
P |
|
|
|
| DB 02 |
26 |
Y |
Y |
Y |
P |
|
|
|
|
|---|
| SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
|---|
| General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
|---|
| HTML Block |
|
|---|
| General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
|---|
| HTML Block |
|
|---|
| Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
|---|
| Lighting Report | | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
| 400w Lowbay |
Y |
| 40w Oyster Light |
Y |
| LED Batten Lights |
Y |
| LED Hibays |
Y |
| Exit Lights |
Y |
| Surface Mount Emergency Lights |
Y |
| Recessed Emergency Lights |
Y |
| LED Track Lights |
Y |
| LED Spot Lights |
Y |
| LED Bunker Lights |
Y |
| Par 38 Twin Spots |
Y |
| LED Downlights |
Y |
|
|---|
| Are there any Warranty items needing to be repaired? | No |
|---|
| LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
| Lighting Control |
DB01 |
1 |
Not operating correctly |
Y |
N |
N |
|
|
|---|
| Site Status Selector | Store now fully compliant |
|---|
| Next Test Due in 6 months | 02/10/2025 |
|---|
| |
|---|
| |