Partner Name | Built Services |
---|
State | NSW |
---|
Date of Visit | 24/04/2025 |
---|
Technician's Name | Aden Westaway |
---|
Which Company are you working for? | Sturdie Trade Services |
---|
Sturdie Job Number | 50F0015/0567 |
---|
Email | Email hidden; Javascript is required. |
---|
The Good Guys Site in NSW | penrith |
---|
|
|
---|
Location Name | Penrith |
---|
| |
---|
HTML Block |
|
---|
Test Period | 6 Monthly (90 minutes) |
---|
Push Button Test | - Carry out push button test for correct operation
|
---|
Carry out push button test for correct operation | |
---|
HTML Block |
|
---|
Carry out test with RCD Tester | Carry out push button test and record the results below. |
---|
THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
---|
RCD Details (6 Month) | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
DB01 |
9 |
Y |
P |
|
|
|
16 |
Y |
P |
|
|
|
67 |
Y |
P |
|
|
|
68 |
Y |
P |
|
|
|
69 |
Y |
P |
|
|
|
70 |
Y |
P |
|
|
|
71 |
Y |
P |
|
|
|
76 |
Y |
P |
|
|
|
77 |
Y |
P |
|
|
|
78 |
Y |
P |
|
|
|
79 |
Y |
P |
|
|
|
80 |
Y |
P |
|
|
|
81 |
Y |
P |
|
|
|
82 |
Y |
P |
|
|
|
83 |
Y |
P |
|
|
|
84 |
Y |
P |
|
|
|
85 |
Y |
P |
|
|
|
86 |
Y |
P |
|
|
|
87 |
Y |
P |
|
|
|
88 |
Y |
P |
|
|
|
89 |
Y |
P |
|
|
|
90 |
Y |
P |
|
|
|
91 |
Y |
P |
|
|
|
92 |
Y |
P |
|
|
|
93 |
Y |
P |
|
|
|
94 |
Y |
P |
|
|
|
95 |
Y |
P |
|
|
|
97 |
Y |
P |
|
|
|
98 |
Y |
P |
|
|
|
99 |
Y |
P |
|
|
|
100 |
Y |
P |
|
|
|
101 |
Y |
P |
|
|
|
102 |
Y |
P |
|
|
|
103 |
Y |
P |
|
|
|
104 |
Y |
P |
|
|
|
111 |
Y |
P |
|
|
|
112 |
Y |
P |
|
|
|
113 |
Y |
P |
|
|
|
114 |
Y |
P |
|
|
|
115 |
Y |
P |
|
|
|
116 |
Y |
P |
|
|
|
117 |
Y |
P |
|
|
|
118 |
Y |
P |
|
|
|
119 |
Y |
P |
|
|
|
120 |
Y |
P |
|
|
|
121 |
Y |
P |
|
|
|
122 |
Y |
P |
|
|
|
123 |
Y |
P |
|
|
|
124 |
Y |
P |
|
|
|
125 |
Y |
P |
|
|
|
127 |
Y |
P |
|
|
|
128 |
Y |
P |
|
|
|
129 |
Y |
P |
|
|
|
130 |
Y |
P |
|
|
|
131 |
Y |
P |
|
|
DB01A |
1 |
Y |
P |
|
|
|
7 |
Y |
P |
|
|
|
8 |
Y |
P |
|
|
|
9 |
Y |
P |
|
|
|
10 |
Y |
P |
|
|
|
11 |
Y |
P |
|
|
|
12 |
Y |
P |
|
|
|
13 |
Y |
P |
|
|
|
19 |
Y |
P |
|
|
|
21 |
Y |
P |
|
|
|
31 |
Y |
P |
|
|
|
33 |
Y |
P |
|
|
|
34 |
Y |
P |
|
|
|
35 |
Y |
P |
|
|
|
36 |
Y |
P |
|
|
|
41 |
Y |
P |
|
|
|
42 |
Y |
P |
|
|
|
---|
SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
---|
Timers | - Check timers for correct operation and timing
|
---|
Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
---|
HTML Block |
|
---|
EMERGENCY LIGHTS | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB01 - Test Switch |
S13 |
R |
Y |
Y |
Y |
P |
|
|
|
|
S14 |
R |
Y |
Y |
Y |
P |
|
|
|
|
S15 |
R |
Y |
Y |
Y |
P |
|
|
|
|
S16 |
R |
Y |
Y |
Y |
P |
|
|
|
|
S17 |
R |
Y |
Y |
Y |
P |
|
|
|
|
S18 |
R |
Y |
Y |
Y |
P |
|
|
|
|
S19 |
R |
Y |
Y |
Y |
P |
|
|
|
|
S20 |
R |
Y |
Y |
Y |
P |
|
|
|
|
S21 |
R |
Y |
Y |
Y |
P |
|
|
|
|
S22 |
R |
Y |
Y |
Y |
P |
|
|
|
|
S23 |
R |
Y |
Y |
Y |
P |
|
|
|
|
S35 |
R |
Y |
Y |
Y |
P |
|
|
|
DB01A - Test Switch |
S24 |
R |
Y |
Y |
Y |
P |
|
|
|
|
S25 |
R |
Y |
Y |
Y |
P |
|
|
|
|
S26 |
R |
Y |
Y |
Y |
P |
|
|
|
|
S27 |
R |
Y |
Y |
Y |
P |
|
|
|
|
EF28 |
2ft Twin Fluoro |
Y |
Y |
Y |
P |
|
|
|
|
EF29 |
2ft Twin Fluoro |
Y |
Y |
Y |
P |
|
|
|
|
EF30 |
2ft Twin Fluoro |
Y |
Y |
Y |
P |
|
|
|
|
EF31 |
4ft Twin Fluoro |
Y |
Y |
Y |
P |
|
|
|
|
EF32 |
4ft Twin Fluoro |
Y |
Y |
Y |
P |
|
|
|
|
EF31 |
4ft Twin Fluoro |
Y |
Y |
Y |
P |
|
|
|
|
EM Light |
Frogs Eyes |
Y |
Y |
Y |
P |
|
|
|
|
---|
HTML Block |
|
---|
EXIT LIGHTS | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB01 - Test Switch |
EX1 |
Y |
Y |
Y |
P |
|
|
|
|
EX2 |
Y |
Y |
Y |
P |
|
|
|
|
EX6 |
Y |
Y |
Y |
P |
|
|
|
|
EX12 |
Y |
Y |
Y |
P |
|
|
|
|
EX36 |
Y |
Y |
Y |
P |
|
|
|
DB01A - Test Switch |
EX3 |
Y |
Y |
Y |
P |
|
|
|
|
EX4 |
Y |
Y |
Y |
P |
|
|
|
|
EX5 |
Y |
Y |
Y |
P |
|
|
|
|
EX7 |
Y |
Y |
Y |
P |
|
|
|
|
EX8 |
Y |
Y |
Y |
P |
|
|
|
|
EX9 |
Y |
Y |
Y |
P |
|
|
|
|
EX10 |
Y |
Y |
Y |
P |
|
|
|
|
EX11 |
Y |
Y |
Y |
P |
|
|
|
|
---|
SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
---|
General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
---|
HTML Block |
|
---|
General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
---|
HTML Block |
|
---|
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
---|
Lighting Report | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
4ft Twin Fluoro 840 |
Y |
2ft Twin Fluoro 840 |
Y |
Highbays LED 150W |
Y |
35W 865 T5 Single Lights Shop |
Y |
4ft Light x 3 Lamps 36W 860 |
Y |
4ft Twin Lights 840 |
Y |
4ft Twin T5 28W Lamps 865 |
Y |
2 x 3ft LED Strips LPF-40D-12 |
Y |
Entry Circular Long Life ES20W 865 |
Y |
|
---|
Are there any Warranty items needing to be repaired? | No |
---|
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
35W/865 Lamp |
4x Audio + 3x Games |
7 |
Not illuminated. |
Y |
N |
N |
|
|
---|
Site Status Selector | Store now fully compliant |
---|
Next Test Due in 6 months | 24/10/2025 |
---|
| |
---|
| |