Partner NameTransit Electrical Pty Ltd
StateWA
Date of Visit15/05/2025
Technician's NameConnor Stevens
Which Company are you working for?Sturdie Trade Services
Sturdie Job Number50F0023/0241
EmailEmail hidden; Javascript is required.
The Good Guys Site in WAmandurah

Location NameMandurah
HTML Block
Test Period6 Monthly (90 minutes)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

RCD Details (6 Month)
Distribution Board No. Circuit No. Push Button (YorN) Pass / Fail (PorF) Fault? Repaired on Site (YorN)
DB 01 R1 Y P
DB 01 W1 Y P
DB 01 B1 Y P
DB 01 R2 Y P
DB 01 W2 Y P
DB 01 B2 Y P
DB 01 R3 Y P
DB 01 W3 Y P
DB 01 B3 Y P
DB 01 R4 Y P
DB 01 W4 Y P
DB 01 B4 Y P
DB 01 R5 Y P
DB 01 W5 Y P
DB 01 B5 Y P
DB 01 R6 Y P
DB 01 W6 Y P
DB 01 B6 Y P
DB 01 R7 Y P
DB 01 R8 Y P
DB 01 W8 Y P
DB 01 B8 Y P
DB 01 W9 Y P
DB 01 R10 Y P
DB 01 W10 Y P
DB 01 B10 Y P
DB 01 R11 Y P
DB 01 W11 Y P
DB 01 B11 Y P
DB 01 R12 Y P
DB 01 W12 Y P
DB 01 B12 Y P
DB 01 R13 Y P
DB 01 W13 Y P
DB 01 B13 Y P
DB 01 R14 Y P
DB 01 W14 Y P
DB 01 B14 Y P
DB 01 R15 Y P
DB 01 W15 Y P
DB 01 B15 Y P
DB 01 R16 Y P
DB 01 W16 Y P
DB 01 B16 Y P
DB 01 R17 Y P
DB 01 W17 Y P
DB 01 B17 Y P
DB 01 R18 Y P
DB 01 W18 Y P
DB 01 B18 Y P
DB 01 B19 Y P
DB 01 R20 Y P
DB 01 RWB21, RW23 Y P
DB 01 B23 Y P
DB 01 R26 Y P
DB 01 W26 Y P
DB 01 B26 Y P
DB 01 R28 Y P
DB 01 W28 Y P
DB 01 B28 Y P
DB 01 R33 Y P
DB 01 W33 Y P
DB 01 B33 Y P
DB 01 R34 Y P
DB 01 W34 Y P
DB 01 B34 Y P
DB 01 R35 Y P
DB 01 W35 Y P
DB 01 B35 Y P
DB 01 R36 Y P
DB 01 W36 Y P
DB 01 B36 Y P
DB 01 R37 Y P
DB 01 W37 Y P
DB 01 B37 Y P
DB 01 R45 Y P
DB 01 W45 Y P
DB 01 B45 Y P
DB 01 R46 Y P
DB 01 W46 Y P
DB 01 B46 Y P
DB 01 R47 Y P
DB 01 W47 Y P
DB 01 B47 Y P
DB 01 R48 Y P
DB 01 W48 Y P
DB 01 B48 Y P
DB 01 R49 Y P
DB 01 W49 Y P
DB 01 B49 Y P
DB 01 R50 Y P
DB 01 W50 Y P
DB 01 B50 Y P
DB 01 R46 Y P
DB 01 W46 Y P
DB 01 B46 Y P
DB 01 R48 Y P
DB 01 W48 Y P
DB 01 B48 Y P
DB 02 CB01 Y P
DB 02 CB02 Y P
DB 02 CB03 Y P
DB 02 CB04 Y P
DB 02 CB05 Y P
DB 02 CB06 Y P
DB 02 CB08 Y P
DB 02 CB09 Y P
DB 02 CB10 Y P
DB 02 CB11 Y P
DB 02 CB12 Y P
DB 02 CB13 Y P
DB 02 CB14 Y P
DB 02 CB15 Y P
DB 02 CB16 Y P
DB 02 CB17 Y P
DB 02 CB18 Y P
DB 02 CB19 Y P
DB 02 CB21 Y P
DB 02 CB22 Y P
DB 02 CB23 Y P
DB 02 CB25 Y P
DB 02 CB26 Y P
DB 02 CB27 Y P
DB 02 CB28 Y P
DB 02 CB29 Y P
DB 02 CB30 Y P
DB 02 CB31 Y P
DB 02 CB33 Y P
DB 02 CB35 Y P
SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB 01 3 S Y Y Y P
7 S Y Y Y P
9 S Y Y Y P
11 S Y Y Y P
14 S Y Y Y P
16 S Y Y Y P
18 S Y Y Y P
20 S Y Y Y P
25 S Y Y Y P
27 S Y Y Y P
30 S Y Y Y P
32 R Y Y Y P
34 R Y Y Y P
36 S Y Y Y P
40 S Y Y Y P
44 S Y Y Y P
45 S N N N F Failed 90 minute test Y N
46 S Y Y Y P
50 R Y Y Y P
51 R Y Y Y P
53 R Y Y Y P
54 R Y Y Y P
55 R Y Y Y P
56 R Y Y Y P
57 R Y Y Y P
58 R Y Y Y P
59 S Y Y Y P
60 S Y Y Y P
61 S Y Y Y P
62 S Y Y Y P
63 S Y Y Y P
64 S Y Y Y P
65 S Y Y Y P
66 S Y Y Y P
HTML Block
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB 01 1 Y Y Y P
2 Y Y Y P
4 Y Y Y P
5 Y Y Y P
6 Y Y Y P
7 Y Y Y P
10 Y Y Y P
12 Y Y Y P
13 Y Y Y P
15 Y Y Y P
17 Y Y Y P
19 Y Y Y P
21 Y Y Y P
23 Y Y Y P
24 Y Y Y P
26 Y Y Y P
28 Y Y Y P
29 Y Y Y P
31 Y Y Y P
33 Y Y Y P
35 Y Y Y P
37 Y Y Y P
39 Y Y Y P
41 Y Y Y P
42 Y Y Y P
43 Y Y Y P
47 Y Y Y P
48 Y Y Y P
49 Y Y Y P
52 Y Y Y P
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Check with Store Manager to ensure there are no other issues
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auYes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten) Existing (YorN)
400w Hibay Y
400w Lowbay Y
400w Lowbay Defused Y
LED Downlight SAL Y
Jumbo Exit Y
2 by PAR 38 Spot Y
LED Oyster Light Y
150w Round MH Shoplight Y
Exits Y
Recessed Emergency Spitfire Y
Surface Mount Emergency Spitfire Y
40w LED Batten - DAVIS Y
Are there any Warranty items needing to be repaired?No
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
Hibay 1x Coffee, 1x Samsung Fridges, 3x BOH 5 Not Illuminated Y N N Scissor Lift was Required
LG Washers and Samsung Washers CB18 Front of Store Washers 2 2 x Displays need to have their circuits split Y N N Scissor Lift was required to split LG & Samsung Washing Machine Displays. CB18 was split allowing LG to remain on CB18 and a new RCD was installed to power Samsung Washers Display
Surface Mount Emergency Light #45 BOH 1 Failed 90 minute test Y N N Scissor Lift was Required
Site Status SelectorStore now fully compliant
Next Test Due in 6 months10/11/2025