Carry out push button test and record the results below.
THERMOGRAPHIC TEST RESULTS
THERMOGRAPHIC TEST RESULTS
RCD Details (6 Month)
Distribution Board No.
Circuit No.
Push Button (YorN)
Pass / Fail (PorF)
Fault?
Repaired on Site (YorN)
DB1
12
Y
P
DB1
13
Y
P
DB1
14
Y
P
DB1
15
Y
P
DB1
16
Y
P
DB1
17
Y
P
DB1
18
Y
P
DB1
19
Y
P
DB1
20
Y
P
DB1
21
Y
P
DB1
22
Y
P
DB1
23
Y
P
DB1
24
Y
P
DB1
25
Y
P
DB1
26
Y
P
DB1
27
Y
P
DB1
28
Y
P
DB1
29
Y
P
DB1
30
Y
P
DB1
31
Y
P
DB1
32
Y
P
DB1
33
Y
P
DB1
34
Y
P
DB1
35
Y
P
DB1
36
Y
P
DB1
37
Y
P
DB1
38
Y
P
DB1
39
Y
P
DB1
40
Y
P
DB1
41
Y
P
DB1
42
Y
P
DB1
43
Y
P
DB1
44
Y
P
DB1
45
Y
P
DB1
46
Y
P
DB1
47
Y
P
DB1
49
Y
P
DB1
51
Y
P
DB1
53
Y
P
DB1
54
Y
P
DB1
55
Y
P
DB1
56
Y
P
DB1
57
Y
P
DB1
58
Y
P
DB1
59
Y
P
DB1
60
Y
P
DB1
61
Y
P
DB1
62
Y
P
DB1
63
Y
P
DB1
64
Y
P
DB1
65
Y
P
DB1
66
Y
P
DB1
67
Y
P
DB1
68
Y
P
DB1
69
Y
P
DB1
70
Y
P
DB1
71
Y
P
DB1
72
Y
P
DB1
73
Y
P
DB1
74
Y
P
DB1
75
Y
P
DB1
76
Y
P
DB1
78
Y
P
DB1
80
Y
P
DB1
82
Y
P
DB1
84
Y
P
DB1A
7
Y
P
DB1A
9
Y
P
DB2
1
Y
P
DB2
2
Y
P
DB2
3
Y
P
DB2
4
Y
P
DB2
5
Y
P
DB2
6
Y
P
DB2
7
Y
P
DB2
8
Y
P
DB2
9
Y
P
DB2
10
Y
P
DB2
11
Y
P
DB2
12
Y
P
DB2
13
Y
P
DB2
14
Y
P
DB2
15
Y
P
DB2
16
Y
P
DB2
17
Y
P
DB2
18
Y
P
DB2
19
Y
P
DB2
20
Y
P
DB2
21
Y
P
DB2
22
Y
P
DB2
23
Y
P
DB2
24
Y
P
DB2
26
Y
P
DB2
27
Y
P
DB2
28
Y
P
DB2
30
Y
P
DB2
31
Y
P
DB2
32
Y
P
DB2
33
Y
P
DB2
34
Y
P
DB2
35
Y
P
DB2
36
Y
P
DB2
37
Y
P
DB2
38
Y
P
DB2
39
Y
P
DB2
40
Y
P
DB2
41
Y
P
DB2
42
Y
P
DB2
43
Y
P
DB2
45
Y
P
DB2
46
Y
P
DB2
47
Y
P
DB2
48
Y
P
SF43 Exit/Emergency
SF43 EXIT/EMERGENCY LIGHTING
Exit/Emergency Light Checklist
Check there has been no power interruption for at least 16 hours prior to test
Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Exit/Emergency Light Checklist
Check there has been no power interruption for at least 16 hours prior to test
Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
Timers
Check timers for correct operation and timing
Switched Socket Outlets
Carry out visual check on SSOs for signs of misuse, blackening or deterioration
Check and report any outlets with multiple power boards overloading
Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No.
ID No.
Surface mounted or recessed? (SorR)
Lamp OK? (YorN)
Battery OK? (YorN)
Condition OK? (YorN)
Pass / Fail (PorF)
Fault
Repaired on Site (YorN)
Under Warranty (YorN)
DB1
9
S
Y
Y
Y
P
DB1
12
S
Y
Y
Y
P
DB1
21
S
Y
Y
Y
P
DB1
29
R
Y
Y
Y
P
DB1
30
R
Y
Y
Y
P
DB1
33
R
Y
Y
Y
P
DB1
34
R
Y
Y
Y
P
DB1
35
R
Y
Y
Y
P
DB1
36
R
Y
Y
Y
P
DB1
37
R
Y
Y
Y
P
DB1
39
R
Y
Y
Y
P
DB1
41
R
Y
Y
Y
P
DB1
42
R
Y
Y
Y
P
DB1
43
R
Y
Y
Y
P
HTML Block
EXIT LIGHTS
Distribution Board No.
ID No.
Lamp OK? (YorN)
Battery OK? (YorN)
Condition OK? (YorN)
Pass / Fail (PorF)
Fault
Repaired on Site (YorN)
Under Warranty (YorN)
DB1
3
Y
Y
Y
P
DB1
4
Y
Y
Y
P
DB1
5
Y
Y
Y
P
DB1
11
Y
Y
Y
P
DB1
13
Y
Y
Y
P
DB1
14
Y
Y
Y
P
DB1
15
Y
Y
Y
P
DB1
16
Y
Y
Y
P
DB1
24
Y
Y
Y
P
DB1
25
Y
Y
Y
P
DB1
26
Y
Y
Y
P
DB1
27
Y
Y
Y
P
DB1
31
Y
Y
Y
P
DB1
32
Y
Y
Y
P
DB1
38
Y
Y
Y
P
DB1
40
Y
Y
Y
P
DB1
44
Y
Y
Y
P
DB1
45
Y
Y
Y
P
SF44 General Lighting & Works
SF44 GENERAL LIGHTING & WORKS
General Checklist
Check correct operation of all luminaries
Report on any faulty luminaries/control gear
Provide costing to repair/replace
HTML Block
General Operation/Additional items
Check with Store Manager to ensure there are no other issues
Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au
Yes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten)
Existing (YorN)
Circular Hibay
Y
36w twin fluro
Y
9w LED downlight
Y
Are there any Warranty items needing to be repaired?
No
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item
Location of Item (on premises)
Quantity
Details of fault /problem
Repaired on Site? (YorN)
Quote to be sent? (YorN)
To return to Site
Comments
Emergency test station/emergency lights
DB1, store
13
13xDB1, store emergency spitfires not operational from test switch
N
N
N
Emergency test station does not turn 13x spitfires throughout store into test mode. All other EM/EX lights work as intended. Affected spitfires include 1, 2, 6, 7, 8, 10, 17, 18, 19, 20, 22, 23, 28
Site Status Selector
Store now fully compliant
Next Test Due in 6 months
04/12/2025