Partner Name | Transit Electrical Pty Ltd |
---|
State | WA |
---|
Date of Visit | 30/07/2025 |
---|
Technician's Name | Connor Stevens |
---|
Which Company are you working for? | Sturdie Trade Services |
---|
Sturdie Job Number | 50F0023/0257 |
---|
Email | Email hidden; Javascript is required. |
---|
The Good Guys Site in WA | joondalup |
---|
|
|
---|
Location Name | joondalup |
---|
| |
---|
HTML Block |
|
---|
Test Period | 12 Monthly (90 minutes) |
---|
Push Button Test | - Carry out push button test for correct operation
|
---|
Carry out push button test for correct operation | |
---|
HTML Block |
|
---|
Carry out test with RCD Tester | Carry out push button test and record the results below. |
---|
RCD Details (Initial/12 Months) | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
DB01 |
R1 |
Y |
P |
|
|
|
W1 |
Y |
P |
|
|
|
B1 |
Y |
P |
|
|
|
R2 |
Y |
P |
|
|
|
W2 |
Y |
P |
|
|
|
B2 |
Y |
P |
|
|
|
R3 |
Y |
P |
|
|
|
W3 |
Y |
P |
|
|
|
B3 |
Y |
P |
|
|
|
R4 |
Y |
P |
|
|
|
W4 |
Y |
P |
|
|
|
B4 |
Y |
P |
|
|
|
R6 |
Y |
P |
|
|
|
W6 |
Y |
P |
|
|
|
B6 |
Y |
P |
|
|
|
R7 |
Y |
P |
|
|
|
W7 |
Y |
P |
|
|
|
B7 |
Y |
P |
|
|
|
R8 |
Y |
P |
|
|
|
W8 |
Y |
P |
|
|
|
B8 |
Y |
P |
|
|
|
R9 |
Y |
P |
|
|
|
W9 |
Y |
P |
|
|
|
B9 |
Y |
P |
|
|
|
R10 |
Y |
P |
|
|
|
W10 |
Y |
P |
|
|
|
B10 |
Y |
P |
|
|
|
R11 |
Y |
P |
|
|
|
W12 |
Y |
P |
|
|
|
B12 |
Y |
P |
|
|
|
R13 |
Y |
P |
|
|
|
W13 |
Y |
P |
|
|
|
B13 |
Y |
P |
|
|
|
R14 |
Y |
P |
|
|
|
W14 |
Y |
P |
|
|
|
B14 |
Y |
P |
|
|
|
R15 |
Y |
P |
|
|
|
W15 |
Y |
P |
|
|
|
B15 |
Y |
P |
|
|
|
R16 |
Y |
P |
|
|
|
W16 |
Y |
P |
|
|
|
B16 |
Y |
P |
|
|
|
R17 |
Y |
P |
|
|
|
W17 |
Y |
P |
|
|
|
B17 |
Y |
P |
|
|
|
R18 |
Y |
P |
|
|
|
W18 |
Y |
P |
|
|
|
B18 |
Y |
P |
|
|
|
R19 |
Y |
P |
|
|
|
W19 |
Y |
P |
|
|
|
B19 |
Y |
P |
|
|
|
R20 |
Y |
P |
|
|
|
W20 |
Y |
P |
|
|
|
B20 |
Y |
P |
|
|
|
R21 |
Y |
P |
|
|
|
W21 |
Y |
P |
|
|
|
B21 |
Y |
P |
|
|
|
R22 |
Y |
P |
|
|
|
W22 |
Y |
P |
|
|
|
W23 |
Y |
P |
|
|
|
B23 |
Y |
P |
|
|
|
W26 |
Y |
P |
|
|
|
R28 |
Y |
P |
|
|
|
W28 |
Y |
P |
|
|
DB02 |
W1 |
Y |
P |
|
|
|
B1 |
Y |
P |
|
|
|
W2 |
Y |
P |
|
|
|
B2 |
Y |
P |
|
|
|
R3 |
Y |
P |
|
|
|
W3 |
Y |
P |
|
|
|
B3 |
Y |
P |
|
|
|
R4 |
Y |
P |
|
|
|
W4 |
Y |
P |
|
|
|
B4 |
Y |
P |
|
|
|
R5 |
Y |
P |
|
|
|
W5 |
Y |
P |
|
|
|
B5 |
Y |
P |
|
|
|
R6 |
Y |
P |
|
|
|
W6 |
Y |
P |
|
|
|
B6 |
Y |
P |
|
|
|
R7 |
Y |
P |
|
|
|
W7 |
Y |
P |
|
|
|
B7 |
Y |
P |
|
|
|
R8 |
Y |
P |
|
|
|
W8 |
Y |
P |
|
|
|
B8 |
Y |
P |
|
|
|
R9 |
Y |
P |
|
|
|
R10 |
Y |
P |
|
|
|
W10 |
Y |
P |
|
|
|
B10 |
Y |
P |
|
|
|
R12 |
Y |
P |
|
|
|
W12 |
Y |
P |
|
|
|
---|
THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
---|
SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
- Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
|
---|
Timers | - Check timers for correct operation and timing
|
---|
Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
---|
HTML Block |
|
---|
EMERGENCY LIGHTS | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB 01 |
2 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
3 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
4 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
5 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
6 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
7 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
8 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
9 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
12 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
13 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
14 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
15 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
16 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
17 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
18 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
19 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
20 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
22 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
23 |
R |
Y |
Y |
Y |
P |
|
|
|
DB01 |
26 |
R |
Y |
Y |
Y |
P |
|
|
|
DB01 |
27 |
S |
Y |
Y |
Y |
P |
|
|
|
DB01 |
28 |
S |
Y |
Y |
Y |
P |
|
|
|
|
---|
HTML Block |
|
---|
EXIT LIGHTS | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
Sub board 1 |
1 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
10 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
11 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
21 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
24 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
25 |
Y |
Y |
Y |
P |
|
|
|
DB01 |
29 |
Y |
Y |
Y |
P |
|
|
|
DB01 |
30 |
Y |
Y |
Y |
P |
|
|
|
DB01 |
31 |
Y |
Y |
Y |
P |
|
|
|
DB01 |
32 |
Y |
Y |
Y |
P |
|
|
|
DB01 |
33 |
Y |
Y |
Y |
P |
|
|
|
DB01 |
34 |
Y |
Y |
Y |
P |
|
|
|
DB01 |
35 |
Y |
Y |
Y |
P |
|
|
|
DB01 |
36 |
Y |
Y |
Y |
P |
|
|
|
DB01 |
37 |
Y |
Y |
Y |
P |
|
|
|
DB01 |
38 |
Y |
Y |
Y |
P |
|
|
|
DB01 |
39 |
Y |
Y |
Y |
P |
|
|
|
DB01 |
40 |
Y |
Y |
Y |
P |
|
|
|
|
---|
SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
---|
General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
---|
HTML Block |
|
---|
General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
---|
HTML Block |
|
---|
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
---|
Lighting Report | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
Jumbo exit |
Y |
LED Hibays |
Y |
Davis LED Batten |
Y |
LED Lowbays |
Y |
EM Exit |
Y |
Surface Mount EM Spitfire |
Y |
Recessed EM Spitfire |
Y |
LED Rectangular Shoplight |
Y |
LED Linkable |
Y |
LED Downlights |
Y |
|
---|
Are there any Warranty items needing to be repaired? | No |
---|
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
Hibay |
TV Zone |
1 |
10% illuminated |
N |
Y |
TBA |
Requires EWP to reach. |
|
---|
Next Test Due in 6 months | 30/01/2026 |
---|
| |
---|
| |