State | SA |
---|
Date of Visit | 05/08/2025 |
---|
Technician's Name | Glenn Rowe |
---|
Which Company are you working for? | Sturdie Trade Services |
---|
Sturdie Job Number | 50F0021/0104 |
---|
Email | Email hidden; Javascript is required. |
---|
The Good Guys Site in SA | mile_end |
---|
|
|
---|
Location Name | Mile End |
---|
| |
---|
HTML Block |
|
---|
Test Period | 12 Monthly (90 minutes) |
---|
Push Button Test | - Carry out push button test for correct operation
|
---|
Carry out push button test for correct operation | |
---|
HTML Block |
|
---|
Carry out test with RCD Tester | Carry out push button test and record the results below. |
---|
RCD Details (Initial/12 Months) | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
DB.T8/9A |
R45 |
Y |
P |
|
|
|
W45 |
Y |
P |
|
|
|
B45 |
Y |
P |
|
|
|
W46 |
Y |
P |
|
|
|
B46 |
Y |
P |
|
|
|
R48 |
Y |
P |
|
|
|
W48 |
Y |
P |
|
|
|
B48 |
Y |
P |
|
|
|
R50 |
Y |
P |
|
|
|
W50 |
Y |
P |
|
|
|
B50 |
Y |
P |
|
|
|
R52 |
Y |
P |
|
|
|
W52 |
Y |
P |
|
|
|
B52 |
Y |
P |
|
|
|
R54 |
Y |
P |
|
|
|
W54 |
Y |
P |
|
|
|
B54 |
Y |
P |
|
|
|
R56 |
Y |
P |
|
|
|
W56 |
Y |
P |
|
|
|
B56 |
Y |
P |
|
|
|
R58 |
Y |
P |
|
|
|
B58 |
Y |
P |
|
|
|
R59 |
Y |
P |
|
|
|
W59 |
Y |
P |
|
|
|
B59 |
Y |
P |
|
|
|
R60 |
Y |
P |
|
|
|
B60 |
Y |
P |
|
|
|
R61 |
Y |
P |
|
|
|
W61 |
Y |
P |
|
|
|
B61 |
Y |
P |
|
|
|
R62 |
Y |
P |
|
|
|
W62 |
Y |
P |
|
|
|
B62 |
Y |
P |
|
|
|
R63 |
Y |
P |
|
|
|
W63 |
Y |
P |
|
|
|
B63 |
Y |
P |
|
|
|
R64 |
Y |
P |
|
|
|
W64 |
Y |
P |
|
|
|
B64 |
Y |
P |
|
|
|
R65 |
Y |
P |
|
|
|
W65 |
Y |
P |
|
|
|
B65 |
Y |
P |
|
|
|
R66 |
Y |
P |
|
|
|
W66 |
Y |
P |
|
|
|
B66 |
Y |
P |
|
|
|
R67 |
Y |
P |
|
|
|
W67 |
Y |
P |
|
|
|
B67 |
Y |
P |
|
|
|
R68 |
Y |
P |
|
|
|
W68 |
Y |
P |
|
|
DB.T8/9 |
R13 |
Y |
P |
|
|
|
W13 |
Y |
P |
|
|
|
B13 |
Y |
P |
|
|
|
R14 |
Y |
P |
|
|
|
W14 |
Y |
P |
|
|
|
R15 |
Y |
P |
|
|
|
W15 |
Y |
P |
|
|
|
B16 |
Y |
P |
|
|
|
RWB18 |
Y |
P |
|
|
|
B19 |
Y |
P |
|
|
|
R21 |
Y |
P |
|
|
|
W21 |
Y |
P |
|
|
|
B21 |
Y |
P |
|
|
|
W23 |
Y |
P |
|
|
|
B23 |
Y |
P |
|
|
|
R25 |
Y |
P |
|
|
|
W25 |
Y |
P |
|
|
|
B25 |
Y |
P |
|
|
|
R27 |
Y |
P |
|
|
|
W27 |
Y |
P |
|
|
|
B27 |
Y |
P |
|
|
|
R30 |
Y |
P |
|
|
|
W30 |
Y |
P |
|
|
|
B30 |
Y |
P |
|
|
|
W31 |
Y |
P |
|
|
|
B31 |
Y |
P |
|
|
|
B32 |
Y |
P |
|
|
|
R34 |
Y |
P |
|
|
|
W34 |
Y |
P |
|
|
|
B34 |
Y |
P |
|
|
|
---|
THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
---|
SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
- Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
|
---|
Timers | - Check timers for correct operation and timing
|
---|
Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
---|
HTML Block |
|
---|
EMERGENCY LIGHTS | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB |
1 |
S |
Y |
Y |
Y |
P |
|
|
|
|
2 |
S |
Y |
Y |
Y |
P |
|
|
|
|
3 |
S |
Y |
Y |
Y |
P |
|
|
|
|
4 |
S |
Y |
Y |
Y |
P |
|
|
|
|
5 |
S |
Y |
Y |
Y |
P |
|
|
|
|
6 |
S |
Y |
Y |
Y |
P |
|
|
|
|
7 |
S |
Y |
Y |
Y |
P |
|
|
|
|
8 |
S |
Y |
Y |
Y |
P |
|
|
|
|
9 |
S |
Y |
Y |
Y |
P |
|
|
|
|
10 |
S |
Y |
Y |
Y |
P |
|
|
|
|
11 |
S |
Y |
Y |
Y |
P |
|
|
|
|
12 |
S |
Y |
Y |
Y |
P |
|
|
|
|
13 |
S |
Y |
Y |
Y |
P |
|
|
|
|
14 |
S |
Y |
Y |
Y |
P |
|
|
|
|
15 |
R |
Y |
Y |
Y |
P |
|
|
|
|
16 |
S |
Y |
Y |
Y |
P |
|
|
|
|
17 |
S |
Y |
Y |
Y |
P |
|
|
|
|
18 |
S |
Y |
Y |
Y |
P |
|
|
|
|
19 |
S |
Y |
Y |
Y |
P |
|
|
|
|
20 |
S |
Y |
Y |
Y |
P |
|
|
|
|
21 |
R |
Y |
Y |
Y |
P |
|
|
|
|
22 |
R |
Y |
Y |
Y |
P |
|
|
|
|
23 |
S |
Y |
Y |
Y |
P |
|
|
|
|
24 |
S |
Y |
Y |
Y |
P |
|
|
|
|
---|
HTML Block |
|
---|
EXIT LIGHTS | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB |
1 |
Y |
Y |
Y |
P |
|
|
|
|
2 |
Y |
Y |
Y |
P |
|
|
|
|
3 |
Y |
Y |
Y |
P |
|
|
|
|
4 |
Y |
Y |
Y |
P |
|
|
|
|
5 |
Y |
Y |
Y |
P |
|
|
|
|
6 |
Y |
Y |
Y |
P |
|
|
|
|
7 |
Y |
Y |
Y |
P |
|
|
|
|
8 |
Y |
Y |
Y |
P |
|
|
|
|
9 |
Y |
Y |
Y |
P |
|
|
|
|
10 |
Y |
Y |
Y |
P |
|
|
|
|
11 |
Y |
Y |
Y |
P |
|
|
|
|
12 |
Y |
Y |
Y |
P |
|
|
|
|
13 |
Y |
Y |
Y |
P |
|
|
|
|
14 |
Y |
Y |
Y |
P |
|
|
|
|
15 |
Y |
Y |
Y |
P |
|
|
|
|
16 |
Y |
Y |
Y |
P |
|
|
|
|
---|
SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
---|
General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
---|
HTML Block |
|
---|
General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
---|
HTML Block |
|
---|
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
---|
Lighting Report | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
Hi - Bay Lights |
Y |
36W Bare Batten |
Y |
10W Downlights |
Y |
|
---|
Are there any Warranty items needing to be repaired? | No |
---|
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
Down Light |
Men's Staff Toilet |
1 |
Faulty |
Y |
N |
N |
Replaced on site |
|
---|
Next Test Due in 6 months | 05/02/2026 |
---|
| |
---|
| |