StateNSW
Date of Visit14/08/2025
Technician's NameAden Westaway
Which Company are you working for?Sturdie Trade Services
Sturdie Job Number50F0015/0657
EmailEmail hidden; Javascript is required.
The Good Guys Site in NSWpenrith

Location NamePenrith
HTML Block
Test Period12 Monthly (90 minutes)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
  • Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB01 - Test Switch S13 R Y Y Y P
S14 R Y Y Y P
S15 R Y Y Y P
S16 R Y Y Y P
S17 R Y Y Y P
S18 R Y Y Y P
S19 R Y Y Y P
S20 R Y Y Y P
S21 R Y Y Y P
S22 R Y Y Y P
S23 R Y Y Y P
S35 R Y Y Y P
DB01A - Test Switch S24 R Y Y Y P
S25 R Y Y Y P
S26 R Y Y Y P
S27 R Y N Y F Failed 90 Min Test Y N
EF28 2ft Twin Fluoro Y Y Y P
EF29 2ft Twin Fluoro Y Y Y P
EF30 2ft Twin Fluoro Y Y Y P
EF31 4ft Twin Fluoro Y Y Y P
EF32 4ft Twin Fluoro Y Y Y P
EF31 4ft Twin Fluoro Y Y Y P
EM Light Frogs Eyes Y Y Y P
HTML Block
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB01 - Test Switch EX1 Y Y Y P
EX2 Y Y Y P
EX6 Y Y Y P
EX12 Y Y Y P
EX36 Y Y Y P
DB01A - Test Switch EX3 Y Y Y P
EX4 Y Y Y P
EX5 Y Y Y P
EX7 Y Y Y P
EX8 Y Y Y P
EX9 Y Y Y P
EX10 Y Y Y P
EX11 Y Y Y P
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Check with Store Manager to ensure there are no other issues
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auYes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten) Existing (YorN)
4ft Twin Fluoro 840 Y
2ft Twin Fluoro 840 Y
Highbays LED 150W Y
35W 865 T5 Single Lights Shop Y
4ft Light x 3 Lamps 36W 860 Y
4ft Twin Lights 840 Y
4ft Twin T5 28W Lamps 865 Y
2 x 3ft LED Strips LPF-40D-12 Y
Entry Circular Long Life ES20W 865 Y
Are there any Warranty items needing to be repaired?No
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
LED driver Above air con section 1 Faulty Y N N Replaced
Recessed Emergency Light S27 1 Failed 90 Min Test Y N N Replaced
Site Status SelectorStore now fully compliant
Next Test Due in 6 months14/02/2025