Carry out push button test and record the results below.
RCD Details (Initial/12 Months)
Distribution Board No.
Circuit No.
Push Button (YorN)
Pass / Fail (PorF)
Fault?
Repaired on Site (YorN)
DB01
R1
Y
P
W1
Y
P
B1
Y
P
R3
Y
P
W3
Y
P
B3
Y
P
R5
Y
P
W5
Y
P
B5
Y
P
R7
Y
P
W7
Y
P
B7
Y
P
R9
Y
P
W9
Y
P
B9
Y
P
RCD Passes but when lighting control is active/ turns on when time clock kicks in circuit trips due faulty bunker lights (Known issue, currently under investigation)
N
R11
Y
P
W11
Y
P
B11
Y
P
RCD Passes but when lighting control is active/ turns on when time clock kicks in circuit trips due faulty bunker lights (Known issue, currently under investigation)
N
R13
Y
P
W13
Y
P
B13
Y
P
R15
Y
P
B15
Y
P
B2
Y
P
R4
Y
P
W4
Y
P
B4
Y
P
R7
Y
P
W6
Y
P
B6
Y
P
R8
Y
P
W8
Y
P
B8
Y
P
B10
Y
P
R12
Y
P
W12
Y
P
B12
Y
P
R14
Y
P
W14
Y
P
B14
Y
P
R17
Y
P
W17
Y
P
B17
Y
P
RWB19
Y
P
R21
Y
P
R31
Y
P
W31
Y
P
B31
Y
P
R18
Y
P
W18
Y
P
B18
Y
P
R20
Y
P
W20
Y
P
B20
Y
P
R22
Y
P
W22
Y
P
B22
Y
P
DB02
R1
Y
P
W1
Y
P
B1
Y
P
W3
Y
P
Nuisance tripping
N
B3
Y
P
R5
Y
P
W5
Y
P
B5
Y
P
W7
Y
P
B7
Y
P
RWB9
Y
P
RWB13
Y
P
R2
Y
P
W2
Y
P
B2
Y
P
R4
Y
P
W4
Y
P
B4
Y
P
R6
Y
P
W6
Y
P
B6
Y
P
R8
Y
P
W8
Y
P
B8
Y
P
R10
Y
P
RWB12
Y
P
W14
Y
P
B14
Y
P
R16
Y
P
W16
Y
P
B16
Y
P
DB03
1
Y
P
3
Y
P
7
Y
P
9
Y
P
11
Y
P
13
Y
P
15
Y
P
17
Y
P
19
Y
P
21
Y
P
23
Y
P
25
Y
P
27
Y
P
29
Y
P
31
Y
P
4
Y
P
6
Y
P
8
Y
P
10
Y
P
24
Y
P
26
Y
P
28
Y
P
39
Y
P
32
Y
P
34
Y
P
36
Y
P
DB03.2
1
Y
P
2
Y
P
3
Y
P
4
Y
P
5
Y
P
6
Y
P
7
Y
P
8
Y
P
9
Y
P
10
Y
P
11
Y
P
12
Y
P
13
Y
P
14
Y
P
15
Y
P
16
Y
P
17
Y
P
18
Y
P
DB04
R1
Y
P
W1
Y
P
B1
Y
P
R3
Y
P
W3
Y
P
B3
Y
P
R5
Y
P
W5
Y
P
R2
Y
P
W2
Y
P
B2
Y
P
R4
Y
P
W4
Y
P
B4
Y
P
R6
Y
P
W6
Y
P
THERMOGRAPHIC TEST RESULTS
THERMOGRAPHIC TEST RESULTS
SF43 Exit/Emergency
SF43 EXIT/EMERGENCY LIGHTING
Exit/Emergency Light Checklist
Check there has been no power interruption for at least 16 hours prior to test
Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
Timers
Check timers for correct operation and timing
Switched Socket Outlets
Carry out visual check on SSOs for signs of misuse, blackening or deterioration
Check and report any outlets with multiple power boards overloading
Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No.
ID No.
Surface mounted or recessed? (SorR)
Lamp OK? (YorN)
Battery OK? (YorN)
Condition OK? (YorN)
Pass / Fail (PorF)
Fault
Repaired on Site (YorN)
Under Warranty (YorN)
N/A
HTML Block
EXIT LIGHTS
Distribution Board No.
ID No.
Lamp OK? (YorN)
Battery OK? (YorN)
Condition OK? (YorN)
Pass / Fail (PorF)
Fault
Repaired on Site (YorN)
Under Warranty (YorN)
N/A
SF44 General Lighting & Works
SF44 GENERAL LIGHTING & WORKS
General Checklist
Check correct operation of all luminaries
Report on any faulty luminaries/control gear
Provide costing to repair/replace
HTML Block
General Operation/Additional items
Check with Store Manager to ensure there are no other issues
Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au
Yes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten)
Existing (YorN)
LED B27 Batten Globes
Y
LED Flood Lights
Y
80w MH bunker light
Y
LED Hibays
Y
Surface Mount Emergency Spitfire
Y
Recessed Emergency Spitfire
Y
EM Exits
Y
LED Downlights 10W
Y
Track Light Spotlight
Y
LED Defused Batten
Y
Twin Par 38 Floodlight
Y
LED Oyster Light
Y
Are there any Warranty items needing to be repaired?
No
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item
Location of Item (on premises)
Quantity
Details of fault /problem
Repaired on Site? (YorN)
Quote to be sent? (YorN)
To return to Site
Comments
B9
DB01
1
RCD Passes but when lighting control is active/ turns on when time clock kicks in circuit trips due faulty bunker lights (Known issue, currently under investigation)
N
N
TBA
Issue being investigated under 50F0023/0278 - Work Order - 3196588
Wall Mounted Wall Lights
Front Right Entry
3
Not Functional blown globes cause for B9 Issue
N
N
TBA
Issue being investigated under 50F0023/0278 - Work Order - 3196588
Wall Mounted Wall Lights
BoH Rivers Entry Door
1
Not Functional
N
N
TBA
Issue being investigated under 50F0023/0278 - Work Order - 3196588
Wall Mounted Wall Lights
Front Left Entry
3
Functional but recommend replacement to bring all external wall mounted lights to same model (4/7 are faulty and require replacement)
N
N
TBA
Issue being investigated under 50F0023/0278 - Work Order - 3196588
B11
DB01
1
RCD Passes but when lighting control is active/ turns on when time clock kicks in circuit trips due faulty bunker lights (Known issue, currently under investigation)
N
N
TBA
Issue being investigated under 50F0023/0278 - Work Order - 3196588
100w LED Flood Light
Front Awning
4
Not functioning, blown lights possible cause for B11 tripping.
N
N
TBA
Issue being investigated under 50F0023/0278 - Work Order - 3196588
W3
DB02
1
RCD Passes Nuisance Tripping
N
N
TBA
Issue being investigated under 50F0023/0279 - Work Order - 3202492
Bunker Lights/ Lowbays
3x Front Awning, 2x BoH Awning
5
Not Illuminating power found
N
N
TBA
Issue being investigated under 50F0023/0278 - Work Order - 3196588
Site Status Selector
Store now fully compliant
Next Test Due in 6 months
20/04/2026
The Built Services Group seeks to apply innovation and technology for greater client services, business efficiencies and thinking Green.