StateVIC
Date of Visit10/11/2025
Technician's NameNathan McBain
Which Company are you working for?Sturdie Trade Services
Sturdie Job Number50F0680/0033
EmailEmail hidden; Javascript is required.
The Good Guys Site in VICgeelong

Location NameGeelong
HTML Block
Test Period12 Monthly (90 minutes)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

RCD Details (Initial/12 Months)
Distribution Board No. Circuit No. Push Button (YorN) Pass / Fail (PorF) Fault? Repaired on Site (YorN)
Main Switchboard 02 Y P
Main Switchboard 04 Y P
Main Switchboard 06 Y P
Main Switchboard 07 Y P
Main Switchboard 08 Y P
Main Switchboard 09 Y P
Main Switchboard 10 Y P
Main Switchboard 11 Y P
Main Switchboard 12 Y P
Main Switchboard 13 Y P
Main Switchboard 14 Y P
Main Switchboard 15 Y P
Main Switchboard 16 Y P
Main Switchboard 17 Y P
Main Switchboard 18 Y P
Main Switchboard 19 Y P
Main Switchboard 20 Y P
Main Switchboard 21 Y P
Main Switchboard 22 Y P
Main Switchboard 23 Y P
Main Switchboard 24 Y P
Main Switchboard 25 Y P
Main Switchboard 26 Y P
Main Switchboard 27 Y P
Main Switchboard 28 Y P
Main Switchboard 29 Y P
Main Switchboard 30 Y P
Main Switchboard 31 Y P
Main Switchboard 33 Y P
Main Switchboard 35 Y P
Main Switchboard 40 Y P
DB1 01 Y P
DB1 02 Y P
DB1 03 Y P
DB1 04 Y P
DB1 06 Y P
DB1 08 Y P
DB1 10 Y P
DB1 11 Y P
DB1 12 Y P
DB1 13 Y P
DB1 14 Y P
DB1 15 Y P
DB1 16 Y P
DB1 17 Y P
DB1 18 Y P
DB1 19 Y P
DB1 20 Y P
DB1 21 Y P
DB1 22 Y P
DB1 23 Y P
DB1 24 Y P
DB1 25 Y P
DB1 26 Y P
DB1 27 Y P
DB1 28 Y P
DB1 29 Y P
DB1 30 Y P
DB1 31 Y P
DB1 32 Y P
DB1 33 Y P
DB1 34 Y P
DB1 35 Y P
DB1 36 Y P
DB1 37 Y P
DB1 38 Y P
DB1 39 Y P
DB1 40 Y P
DB1 41 Y P
DB1 42 Y P
DB1 43 Y P
DB1 44 Y P
DB1 45 Y P
DB1 46 Y P
DB1 47 Y P
DB1 48 Y P
DB1 49 Y P
DB1 50 Y P
DB1 51 Y P
DB1 52 Y P
DB1 53 Y P
DB1 54 Y P
DB1 55 Y P
DB1 56 Y P
DB1 57 Y P
DB1 58 Y P
DB1 59 Y P
DB1 60 Y P
DB1 62 Y P
DB1 64 Y P
DB1 66 Y P
DB1 67 Y P
DB1 68 Y P
DB1 69 Y P
DB1 70 Y P
DB1 71 Y P
DB1 72 Y P
DB1 73 Y P
DB1 74 Y P
DB1 75 Y P
DB1 76 Y P
DB1 77 Y P
DB1 78 Y P
DB1 79 Y P
DB1 80 Y P
DB1 81 Y P
DB1 82 Y P
DB1 84 Y P
DB1 86 Y P
DB1 88 Y P
DB1 90 Y P
DB1 91 Y P
DB1 92 Y P
DB1 93 Y P
DB1 94 Y P
DB1 95 Y P
DB1 96 Y P
DB1 97 Y P
DB1 98 Y P
DB1 99 Y P
DB1 100 Y P
DB1 101 Y P
DB1 102 Y P
DB1 103 Y P
DB1 104 Y P
DB1 105 Y P
DB1 106 Y P
DB1 109 Y P
DB1 110 Y P
DB1 111 Y P
DB1 112 Y P
DB1 113 Y P
DB1 114 Y P
DB1 115 Y P
DB1 116 Y P
DB1 117 Y P
DB1 118 Y P
DB1 119 Y P
DB1 120 Y P
DB1 121 Y P
DB1 122 Y P
DB1 123 Y P
DB1 124 Y P
DB1 125 Y P
DB1 126 Y P
DB1 127 Y P
DB1 128 Y P
DB1 129 Y P
DB1 130 Y P
DB1 131 Y P
DB1 132 Y P
DB1 133 Y P
DB1 134 Y P
DB1 135 Y P
DB1 136 Y P
DB1 137 Y P
DB1 138 Y P
DB1 139 Y P
DB2 01 Y P
DB2 03 Y P
DB2 05 Y P
DB2 13 Y P
DB2 15 Y P
DB2 17 Y P
DB2 19 Y P
DB2 20 Y P
DB2 21 Y P
DB2 22 Y P
DB2 23 Y P
DB2 24 Y P
DB2 25 Y P
DB2 26 Y P
DB2 27 Y P
DB2 28 Y P
DB2 29 Y P
DB2 30 Y P
DB2 31 Y P
DB2 32 Y P
DB2 33 Y P
DB2 34 Y P
DB2 36 Y P
DB2 36 Y P
DB2 37 Y P
DB2 38 Y P
DB2 39 Y P
DB2 40 Y P
DB2 41 Y P
DB2 42 Y P
DB2 43 Y P
DB2 44 Y P
DB2 45 Y P
DB2 46 Y P
DB2 47 Y P
DB2 48 Y P
THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
  • Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB-1 1 S Y Y Y P
DB-1 2 R Y Y Y P
DB-1 3 S Y Y Y P
DB-1 4 S Y Y Y P
DB-1 5 S Y Y Y P
DB-1 6 R Y Y Y P
DB-1 7 R Y Y Y P
DB-1 8 R Y Y Y P
DB-1 9 S Y Y Y P
DB-1 10 S Y Y Y P
DB-1 11 S Y Y Y P
DB-1 12 R Y Y Y P
DB-1 13 R Y Y Y P
DB-1 14 S Y Y Y P
DB-1 15 S Y Y Y P
DB-1 16 S Y Y Y P
DB-1 17 S Y Y Y P
DB-1 18 S Y Y Y P
DB-1 19 S Y Y Y P
DB-1 21 S Y Y Y P
DB-1 22 S Y Y Y P
DB-1 23 S Y Y Y P
DB-1 24 S Y Y Y P
DB-1 25 S Y Y Y P
DB-1 26 R Y Y Y P
DB-1 27 S Y Y Y P
DB-1 28 R Y Y Y P
DB-1 29 R Y Y Y P
DB-1 30 R Y Y Y P
DB-1 31 S Y Y Y P
DB-1 32 R Y Y Y P
DB-1 33 R Y Y Y P
DB-1 34 R Y Y Y P
DB-1 35 R Y Y Y P
DB-1 36 R Y Y Y P
DB-1 37 S Y Y Y P
DB-1 38 S Y Y Y P
DB-1 39 S Y Y Y P
DB-1 40 S Y Y Y P
DB-1 41 S Y Y Y P
DB-1 42 S Y Y Y P
DB-1 43 S Y Y Y P
DB-1 44 R Y Y Y P
DB-1 45 R Y Y Y P
DB-1 46 R Y Y Y P
DB-1 47 R Y Y Y P
DB-1 48 R Y Y Y P
DB-1 49 R Y Y Y P
HTML Block
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB-1 1 Y Y Y P
DB-1 2 Y Y Y P
DB-1 3 Y Y Y P
DB-1 4 Y Y Y P
DB-1 5 Y Y Y P
DB-1 6 Y Y Y P
DB-1 7 Y Y Y P
DB-1 8 Y Y Y P
DB-1 9 Y Y Y P
DB-1 10 Y Y Y P
DB-1 11 Y Y Y P
DB-1 12 Y Y Y P
DB-1 13 Y Y Y P
DB-1 14 Y Y Y P
DB-1 15 Y Y Y P
DB-1 16 Y Y Y P
DB-1 17 Y Y Y P
DB-1 18 Y Y Y P
DB-1 19 Y Y Y P
DB-1 20 Y Y Y P
DB-1 21 Y Y Y P
DB-1 22 Y Y Y P
DB-1 23 Y Y Y P
DB-1 24 Y Y Y P
DB-1 25 Y Y Y P
DB-1 26 Y Y Y P
DB-1 27 Y Y Y P
DB-1 28 Y Y Y P
DB-1 29 Y Y Y P
DB-1 30 Y Y Y P
DB-1 31 Y Y Y P
DB-1 32 Y Y Y P
DB-1 33 Y Y Y P
DB-1 34 Y Y Y P
DB-1 35 Y Y Y P
DB-1 36 Y Y Y P
DB-1 37 Y Y Y P
DB-1 38 Y Y Y P
DB-1 39 Y Y Y P
DB-1 40 Y Y Y P
DB-1 41 Y Y Y P
DB-1 42 Y Y Y P
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Check with Store Manager to ensure there are no other issues
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auYes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten) Existing (YorN)
- -
Are there any Warranty items needing to be repaired?No
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
Security cable BOH upstairs near lockable cages 1 Cable hanging down from girder Y N N Secured cable in girder
Test and Tag Store 100+ Test and Tag in-date, next test due 26 Feb 2026 N N N Observation
Site folder Store 1 No site folder Y N N New folder created and sent to store
Wall rack light box Ironing wall rack - Russel Hobbs Sign 1 Flashing light box, faulty driver N N N Installed by id signs on recent refit, should be covered by id signs. Driver Osram element 30/220-240/24 G2
Recessed rectangular shop fitting Kitchenaid wall rack 1 Failed to illuminate Y N N Replaced
Large downlight External front entrance bulk head 4 Faulty fittings N N N Will be replaced under stage 2 project works
MH spotlight External shop front 2 Failed to illuminate Y N N Replaced
Site Status SelectorStore now fully compliant
Next Test Due in 6 months10/05/2026